1 / 18

LHCf Detectors

Arm#1. Arm#2. LHCf Detectors. LHC Ring. ATLAS. Sampling Calorimeter W 44 r.l , 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size W90 x D280 x H620. Where we are with Arm1?.

varick
Download Presentation

LHCf Detectors

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Arm#1 Arm#2 LHCf Detectors LHC Ring ATLAS • Sampling Calorimeter • W 44 r.l , 1.6λI • Scintilator x 16 Layers • Position Detector • Scifi x 4 (Arm#1) • Scilicon Tracker x 4(Arm#2) • Detector size • W90 x D280 x H620

  2. Where we are with Arm1? • Arm1 was fully assembled in Japan in July 2006 (scintillators + fibers + Tungsten) and brought to CERN for the Beam Test

  3. Where we are with Arm2? • Plastic scintillators + Light guides + Tungsten: • Production in Japan finished in July 2006 • They were brought in Florence end of July • First Silicon module (Milestone INFN): • Production in Florence finished in July 2006 • Assembly of Arm2 for beam test was done in Florence in August 2006 • Arm2 was brought at CERN for the beam test on August 16, 2006 • To complete Arm2 3 more silicon modules are necessary • We will finish the modules before Christmas • Arm1 and Arm2 are now both in Florence clean rooms • Final integration of Arm2 will be done before March 2007

  4. Florence clean room (thanks to CMS!!!!!)

  5. Pre-calibrations • For all PMTs • PMT gain at "1 MIP" was pre-calibrated by using plastic scintillator with 90Y beta ray. • HV dependence of gain was measured with all PMTs by using N2 laser. • Saturation effect was measured up to 7 TeV gamma shower maximum. • For all Scintillators • The position dependence of light yield was measured to make correction tables • For Scifi & MAPMTs • Gain and photon yield difference of each channel was measured by 12C ion beam.

  6. Light Intensity - ADC Linearity ADC Count 7TeV shower Maximum 7TeV shower Maximum 105 105 5x104 5x104 0 0 Light Intensity [MIPs] Light Intensity [MIPs] Pre-calibrations PMT Linearity checked by N2 Laser. Position dependence of light yield of scintillator

  7. Beam test @ SPS • Arm1 & Arm2 were delivered to Cern on August 16, 2006 • They were set up for the beam test • Beam period: August 28, September 4 • H4 Test Area • Electrons up to 200 GeV • Protons up to 350 GeV • Muons • Goal of the test beam: • Energy calibration of the calorimeter • Measurement of the spatial resolution of silicon system • Florence telescope (ADAMO) is used to precisely reconstruct tracks

  8. LHCf Detector Silicon Tracker Moving Table Trigger Scintillator SPS Beam Test • CERN : SPS T2 H4 • 2006 Aug. 28 – Sep. 4 • Incident Particles • Proton150,350GeV/c • Electron 100,200GeV/c • Muon 150GeV/c • DAQ rate • 1kHz at Arm#1 • ( fast enough for 7 TeV run) Setup

  9. X Y @ 42r.l. @ 30r.l. e- @ 10r.l. @ 6r.l. Event View - electron - 200GeV/c Electron Beam Event @ 40mm Calorimeter. ADC of scintillator Layer 0 - 11 : 2 r.l. step Layer 12 -16 : 4 r.l. step Shower profile re-constructed from ADC of Scifi

  10. Event View - proton - Proton 350GeV/c Incident Position Arm#1 40mmTower 40mm Calorimeter ADC the Other Event ①6r.l. ②10r.l. ②30r.l. ②42r.l. 40mm shower profile

  11. Status of Analysis • Analysis of H4 beam line test is under going. • Data and MC show reasonable agreement even at very preliminary stage. • Now checking … • energy scale, energy resolution, position dependence, position resolution,particle identification. ADC distribution of third plastic scintillator layer (6r.l.) for 200GeV electron

  12. Few plots of the beam test results for silicon A high energy electron shower seen on x and y silicon X Y <Noise> ~ 5 ADC counts

  13. Y Energy measured 100 GeV electrons High Gain X

  14. Y Energy measured 350 GeV protons High Gain X

  15. Now the integration in LHC… • All the cables have been pulled on both sides • The quartz fibers for calibration have been pulled on both sides • The container for the fibers of Arm2 have been pulled, fibers will be installed later • Installation and commissioning dates have been fixed • LSS1L • Bake-out of the section: December 2006; • BRAN and LHCf commissioning: from 8/01/2007 to 26/01/2007; • BRAN and LHCf final installation: from 14/08/2007 to 17/08/2007. • LSS1R • BRAN and LHCf commissioning: from 23/04/2007 to 11/05/2007; • bake-out of the sectiont= June, July 2007; • BRAN and LHCf LSS1R final installation: from 09/10/2007 to 12/10/2007. • Transport and installation procedure is under detailed study • Thermal tests in the Tan will be done this week with a thermal mockup. • Position of racks in USA15 are defined, racks are allocated, the precise crate allocation in the racks is under study Very big help from TS/LEA group (Anne-Laure Perrot and Daniela Macina)

  16. ARM#1 ARM#2 Arm#1,Arm#2

More Related