1 / 5

UNIT: TOTAL PAX: POC : DSN: Cml : EMAIL:

UNIT: TOTAL PAX: POC : DSN: Cml : EMAIL:. SUPPORT REQUIREMENTS – SbS12. 1 of 5 pages. PERSONNEL/DEPLOYMENT Military _________ 160 ______ # LTC & Above ______ _1 _______ DA Civ ________ _0_______ # GS13 & Above ____ _0______ Contractor ______0_______

varick
Download Presentation

UNIT: TOTAL PAX: POC : DSN: Cml : EMAIL:

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. UNIT: TOTAL PAX: POC: DSN: Cml:EMAIL: SUPPORT REQUIREMENTS – SbS12 1 of 5 pages PERSONNEL/DEPLOYMENT Military_________160______ # LTC & Above_______1_______ DA Civ _________0_______ # GS13 & Above _____0______ Contractor ______0_______ PersMvt Mode BUS (Where do I account for ADVON and Trail?) Point of Embarkation ___Vilseck___________ Debarkation___SLUNJ___________ Arrival Date EAD __O/A 24 MAY_12_____ Departure Date __O/A 10 JUN__12______ CLASS VII - EQUIPMENT/DEPLOYMENT (complete attached EDL Excel sheet) Mvt Mode _____RAIL/___XX>TRUCK/ ________AIR Point of Embarkation _VILSECK (ROSE BARRACKS), GERMANY Debarkation: SLUNJ_TNG AREA___ EAD____O/A 23 MAY_12LAD_O/A 24 MAY 12_____________ Returning Equipment /departure date __11 JUN 12____________ CLASS I (Rations) First Meal _____22 MAY 12________ Last Meal _____11 JUN 12____ _______ (Date/B, L or D) (Date/B, L or D) MRE requirements __ 160 Per Day during STX and FTX (approx 2,600 total)__ (Dates/Number) This number does includes 50 extra for ADVON and TRAIL party Bottled Water requirements _____6 Liters_per day_______________________ (number per day per individual)

  2. UNIT: TOTAL PAX: POC: DSN: Cml:EMAIL: SUPPORT REQUIREMENTS – SbS12 2 of 5 pages CLASS II (General Office Supplies) (Items will be ordered by USAREUR) (complete attached Class II excel sheet) Can you please send me the Excel Sheet so I can fill out appropriately Chem Lights 3 RED 3 Green 3 Yellow 3 Blue 2 IR (Boxes) Engineer Tape Trash Bags 550 Chord 100 MPH Tape 2 cases of Toilet Paper Fans (for cooling of tents) Mosquito Nets? CLASS III We may be looking at up to13 STRYKERs and is there a limit on FMTV and HMMWVs? We can operate our Vehicles and Generators off of Diesel with no issues. TYPE/Total Estimate Dates Required METHOD JP8 _____X_____23 MAY 2011____Retail/____Wholesale DIESEL___X__23 May 2011_____Retail/____Wholesale AVGAS: 300 gal (1,135 lt) Per day Total (14 days = 42K gal (15,890lt)_23 MAY 2011 CLASS IV (consolidated DLA request is completed by USAREUR G4) TYPE/Total Estimate TYPE/Total Estimate TYPE/Total Estimate Sandbags _1000_ C-Wire____100m____ 6ft pickets__50__ Plywood ½” __see below_____ C-Wire Gloves _10___ ____1,536 ft (468m) of 2’ x 4 “plywood sheets_____________ 2 10’x20’ Plastic Tarp

  3. UNIT: TOTAL PAX: POC: DSN: Cml:EMAIL: SUPPORT REQUIREMENTS – SbS12 3 of 5 pages CLASS V (units complete attached Class V excel sheet) Instructions: (applies only to training units with requirement) Pyro (Art. Sim): 20 Pyro (smoke): 4 Red, 8 Violet, 8 Green, Starclusters: 4xRed 40mm (iIlum): 20 5.56 blank (linked): 24,000 7.62 blank (linked): 6,400 5.56 blank: 24,000 .50 blank (linked): 4,000 5.56 live: 8,000 5.56 live (linked) 20,000 7.62 live (linked) 10,000 CLASS VIII 1X MES set Trauma 1X MES set Sick Call CLASS IX Instructions: (applies only to units bringing equipment)

  4. UNIT: TOTAL PAX: POC: DSN: Cml:EMAIL: SUPPORT REQUIREMENTS – SbS12 4 of 5 pages BILLETS/TENTS (please note if you are in tents or buildings) TENTS Total Number of Personnel __________ Number Male_____/Female____ MALE MALE FEMALE COLs _____ DAC COLs _____ LTCs ___1__ LTCs _____ CSMs __1___ CSMs _____ SGMs ___1__ SGMs _____ Officers MAJ & Below ___12____ Officers MAJ & Below _______ Enlisted MSG & Below ____145___ Enlisted MSG & Below _______ CHEMICAL LATRINES/HAND WASH STATIONS NumberLocationDates 8 CL and 2 HWSTENT CITY23 MAY 12 RENTAL VEHICLES (Buses, Vans, SUV, Sedans) TypeNumberPurposeDates Van 1 Move PAX outside TRNG Area 22MAY-10JUN

  5. UNIT: TOTAL PAX: POC: DSN: Cml:EMAIL: SUPPORT REQUIREMENTS – SbS12 5 of 5 pages MHE/CHE/WASH RACKS TYPE DATES REQUIRED/LOCATION PURPOSE QTY Washracks/power washer 9-10 JUN Trainning Area Clean Vehicles for Dedeplooyment 6 CLASS II/IX (BATTERIES) (consolidated and input into SARRS by USAREUR) NomenclatureNSNUIQuantity Nitrogen 01-512-8809 CY 10EA 15/40 9150-01-152-4118 5GAL 25EA ATF 9150-00-698-2382 1QT 36EA 75/90 9150-01-035-5390 1QT 36EA TES-295 9150-01-552-9125 1GAL 25EA 5606 OHA 9150-00-223-4134 1CAN 48EA ANTIFREEZE 6850-01-441-3221 5GAL 25GAL OFFICE EQUIP/AUTOMATION (admin support to the exercise) TYPE DATES REQUIRED/LOCATION PURPOSE QTY Printers (B/W) _23MAY to 10 JUN__/_Tent City____ADMIN___ 1__ Printers (Color) ____SAME____/_____SAME_________ADMIN______1___ Copier/Scanner (B/W) __ SAME_ /_ SAM __ ADMIN_ __1__ Computers (laptop) _______________/____________ _________ ____0_ Computers (desktop) _______________/____________ _________ _____0

More Related