130 likes | 228 Views
Spanning tree protocol In Flerov Laboratory of Nuclear Reaction s. Performed by: A.S. Baginyan Scientific Supervisor: V.V. Korenkov, DSc UC, JINR, Dubna , 2013. Network topology of building №101 Flerov Laboratory of Nuclear Reactions.
E N D
Spanning tree protocolIn Flerov Laboratory of Nuclear Reactions Performed by: A.S. Baginyan Scientific Supervisor: V.V. Korenkov, DSc UC, JINR, Dubna, 2013
Network topology of building №101 Flerov Laboratory of Nuclear Reactions
Network topology of building №101 Flerov Laboratory of Nuclear Reactions
Network topology of building №101 Flerov Laboratory of Nuclear Reactions
SW3 Calculating Cost to Reach the Root and Choosing Its RP Cost 4
Recommended model of Cisco REFERENCE LEVEL DISTRIBUTION LEVEL ACCESS LEVEL LIT Equipment Room, FLNR Service provider Switches