130 likes | 286 Views
VistA Internationalization Project Group—Phase 1 End. By Sam Habiel , PharmD Presenter Peter Li. November 13th , 2018. Happenings Last Week (1/2). All code merged into plan-vi branches https:// github.com/OSEHRA-Sandbox/VistA/tree/plan-vi
E N D
VistA Internationalization Project Group—Phase 1 End By Sam Habiel, PharmD Presenter Peter Li November 13th, 2018
Happenings Last Week (1/2) • All code merged into plan-vi branches • https://github.com/OSEHRA-Sandbox/VistA/tree/plan-vi • https://github.com/OSEHRA-Sandbox/VistA-M/tree/plan-vi • VEHU repo now has a plan-vi branch • https://github.com/OSEHRA-Sandbox/VistA-VEHU-M/tree/plan-vi
Happenings Last Week (2/2) • %DT routine now handles inexact dates in yyyy/mm format (thanks to G Timson) • New Docker Image: VEHU6 • VEHU with i18n code changes • https://hub.docker.com/r/osehra/vehu6/ • Compiled CPRS Code/Vitals dll • https://github.com/OSEHRA-Sandbox/VistA/releases/tag/cprs31a-utf8-c
Summary of Phase 1 • CPRS Read/Write to VistA Unicode Data • CPRS Localization Strategy and Framework • CPRS display of correct date format depending on Windows Locale
Phase 2 Plan • Phase 2 is M infrastructure i18n • Will involve more proper changes to some of the M code changed in Phase 1
Phase 2 Objectives • Move non-portable code in XWBRW to Kernel (use of $ZL, $ZE). • Fix XLFNAME code to allow non-US names • Localize Data in Fileman (e.g. Cover sheet headers) • Localize Menu System • Localize a simple workflow in Outpatient Pharmacy • Put in Korean Lexicon and test with CPRS
Personal Schedule over next 2 weeks • Peter will present this week (Nov 13) • Off week after (Nov 20) • Sam back Nov 27