An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Chapter 8 Net Present Value & Other Investment Criteria

  2. We’re starting a NEW SECTION of the course: Section 1 – Overview • Ch 1: Intro Section 2 – Financial Statements and CFs • Ch 2: Financial Statements and CF definitions • Ch 3: Ratios Section 3 – Valuation of future CFs • Ch 4: Intro to TVM (Single CFs) • Ch 5: More TVM (Multiple CFs - Annuities) Section 4 – Stocks and Bonds • Ch 6: Bonds • Ch 7: Stocks Section 5 – Capital Budgeting • Ch 8: NPV and other Decision Criteria • Ch 9: Making Cap Budgeting Decisions – Calc CFs

  3. Capital Budgeting is… • Budgeting the firm’s Capital • Capital vs. Working Capital • Spending the big money • Not small, short-term money • The light bill, salaries, office supplies… • But BIG, long-term money • These are called Capital Expenditures • They are recorded on the Balance Sheet • They are depreciated • So if a firms sells stocks, sells bonds, or retains earnings… • What does it do with the money?

  4. Here’s the idea: • The CAPITAL BUDGETING DECISION is about ADDING VALUEto the firm • To pay for capital investments, a firm can sell stocks, sell bonds or retain earnings… • But SHOULDa firm sell stocks, sell bonds or retain earnings? • Does it have something WORTHWILEto do with the money? • Does it have GOOD CAPITAL PROJECTS? • Does the proposed project make ENOUGH MONEY? • Does the proposed project make ADD VALUE? • If the proposed project does not add value… • ThenDON’Tsell stocks, DON’Tsell bonds, DON’Tretain earnings • Instead the firm should PAY DIVIDENS

  5. Net Present Value • How do we know if a proposed project Adds Value? • Or makes Enough Money? • We calculatethe proposed project’s Net Present Value • Called NPV Here’s how NPV analysis works: • The Decision Rule: • If the Net Present Valueis POSITIVE • Then the project Adds Value • It makes Enough Money • So the company should InvesttheCapital • or ”Budget” the Capital

  6. Net Present Value is • The PV of all the project’s future cash flows… • CF1, CF2, CF3,… • Discounted at the Properdiscount rate (R)… • A higher discount rate for riskierprojects • A lower discount rate for less risky projects • Plus the initial (time 0) cash flow... • CF0 is the Initial Cost of the project • CF0 is usually an outflow, so it is usually negative • If the PV of the Future CFsis greater than the Cost: • Then the NPV > 0 and the project Adds Value! • If the company can Spend $100 today • For something Worth$110(in PV terms – so also “today”) • Then do the project!

  7. How to think about NPV • Think about paying $1,000 today for a something long-term: • A bond, an annuity, a truck, a machine… • It will pay net of $400per year for 3 years CF1 = $400, CF2 = $400, CF3 = $400 $400 x 3 = $1,200 > $1,000 so it makes money • But does it make enough money? • Is the PV of $400for three years greater than the cost of $1,000? • How risky is the $400 per year? • In other words: What’s the proper discount rate? • What return do the investors require?

  8. How to think about NPV • Also assume the proper discount rate is 10% • We’ll see where 10% come from later • Pay $1,000 now for $400 at time 1, 2 and 3. • Is it a good investment? • First we have to get all the CFs to the same time period • Use time zero since that is when we make the decison • So take the PV of all the CFs • Since all CFs are the same (an annuity), use the TVM function: N = 3 R = 10% PMT = $400 PV = $995 • So pay $1,000 today To get CFs that are worth only $995 • We would lose $5 in present value terms • NPV = -$5  So don’t do it!

  9. Clicker Question: • A project costs $100,000 today (buy a truck) • The project will have Net CFs of $18,000 per year for 10 years • $18,000 is the net CF. It equals CASH IN (revenues) less CASH OUT (expenses) for each of the next 10 years • The proper discount rate is 10% • Calculate the project’s Net Present Value: Hints: • First calculate the PV of $18k per year for 10 years discounted at 10% • (What is the difference between PV and NPV?) • $10,602 • $80,000 • $100,000 • $110,602 • $180,602

  10. Clicker Answer: • A project costs $100,000 today (buy a truck) and has CFs of $18,000 per year for 10 years • The proper discount rate is 10%. • NPV = Initial CF + PV of Future CFs • PV of Future CFs: N = 10 R = 10% PMT = 18,000 PV = $110,602 • Initial CF = -100,000 • NPV = – $100,000 + $110,602 = $10,602 The Answer is A • So the firm can pay $100,000 for truck that will earn (in PV terms) $110,602 • So the firm can trade $100,000 for $110,602 • This adds $10,602 of value to the firm! • Why don’t firm’s do this all the time? They do.

  11. Chapter Outline: • Net Present Value • How to CALCULATE NPV • How to INTERPRETNPV • Rules: • NPV Rule • Payback Period Rule • Internal Rate of Return (IRR) • Profitability Index • Average Accounting Return • Modified Internal Rate of Return (We’ll skip these) • Why the other rules flawed: • But why people still use them • Look at the Positive Cash Flowrule • Used mostly for start-ups • Similar to Debt Service Rules: Will the firm generate enough revenue to pay interest expense? • The “Positive CF Rule” is not in the text

  12. 8.1 Net Present Value An NPV Example: A new product line will cost $165k today • Buy a machine for $165k • This is a cash OUTFLOW (“cost”); CF0 = -$165,000 • Earn CF1= $63,120; CF2 = $70,800; CF3 = $91,080 • The proper discount rate is 12% • Why 12%? Because of the project’s risk. So should we do the project? • Does the project add value to the firm? • Does it make enough money? • Is the PV of all the projects future CFs greater than its cost? • Does the project have positive NPV? These are synonyms!

  13. Example Continued: CF0 = -$165,000; CF1= $63,120; CF2 = $70,800; CF3 = $91,080 R= 12% NPV = CF0 + CF1/(1 + R) + CF2/(1 + R)2 + CF3/(1 + R)3 = -$165 + $63.12/(1.12) + $70.80/(1.12)2 + $91.08 /(1.12)3 = -$165 + $177.63 = $12.63 • NPV > 0 so Do the Project(or commit the firm’s capital) • Why? • Because the present value of the project’s future cash flows is greater than it’s cost ($165 < $177.63) • Firm trades $165 today for future CFs worth $177.63 • In today’s terms • So the project increases the firm’s value by $12.63 • CFs in today’s terms are called Discounted Cash Flows or DCFs

  14. New Example: • A new product line will cost $30k today • Revenues will be $20k per year for 8 years • Costs will be $14k per year for 8 years • At the end of year 8, we can sell the machine for $2k • The machine’s “Salvage Value” is $2k • The proper discount rate is 15% • Should we do the project? • In other words: • Does it have positive NPV? • Is the PV of all the future CFs greater than the cost? • Are the DCFs greater then the cost? • Does it add value to the firm? • Does it earn enough to compensate our investors?

  15. Cash Flow Diagram: CF0= -$30; CF1 to CF7 = $6; CF8 = $8; R = 15% NPV = CF0 + PV(CF1 through CF8) NPV = CF0 + CF1/(1+R) + CF2/(1+R)2 + CF3/(1+R)3 + … + CF8/(1+R)8 NPV = -$30 + $27.58 = -$2.42 NPV < 0 so don’t do the project Don’t trade $30k for $27.58k Let’s see how to do this on your calculator 

  16. How to do NPV on your calculator: Recall: CF0 = -$30; CF1 to CF7 = $6; CF8 = $8; R = 15% First Way: Use the TVM Function: • N = 8; R = 15%; PMT = 6; FV = 2; PV = -27.58 (Why does FV = 2?) • Press +/-, then add -$30 • NPV = $27.58 – $30 = -$2.42 (We can only use TVM function since CF1 through CF7 are $6 and CF8 is $6 + $2) Second Way: Use the Cash Flow Register Function: • HP: Use CFj and Nj buttons to input cash flows • CFj is the amount of the CF, Njis the number of times it occurs • Use I/YR to input rate • Use NPV button to calculate NPV • TI: Use {CF} register, the down arrow {¯}, {Enter}, {NPV} and {CPT} buttons to input cash flows and compute NPV

  17. The Cash Flow Register Function - Part 1 First Some Notation: Our subscripts denote the timingof the CF: • CF0 = -$30 occurs at time zero • CF1 through CF7 = $6 occurs at times 1 through 7 • CF8 = $8 occurs at time 8 Calculator’s subscripts change when the CFs changes: • CF0 = -$30 occurs at time 0 • CF1 = $6 and it occurs 7 times so N1 = 7 • CF2 = $8 and it occurs 1 time so N2 = 1 • The calculator knows that CF2 occurs after CF1 is finished • So CF2 must occur at time 8 • Since N2 = 1, the calculator knows the $8 CF occurs once at time 8

  18. General Procedure for Entering CFs into Your Calculator • Enter CF0 • Enter the 1st distinct future CF Enter the number of times it occurs • Enter the 2nd distinct future CF Enter the number of times it occurs • Enter the 3nd distinct future CF Enter the number of times it occurs… For this example there are 2 distinct futureCFs(after CF0): • The first is $6 and it occurs 7 times • The second is $8 and it occurs 1 time

  19. Using the Calculator to Calculate NPV

  20. Now Calculate NPV for the First Example: Recall: • CF0= -$165,000 • CF1= $63,120 • CF2= $70,800 • CF3= $91,080 • R = 12% Note: • Three distinct CFs after CF0. • Each occurs one time. • Since each CF occurs only one time • So you do not have to enter the number of times in to the calculator • Since one time is the default! • So note for the TI the “Double Arrow” {¯} {¯} on the next page

  21. Using the Calculator to Calculate NPV for the First Example: CF0= -$165,000 CF1= $63,120 CF2= $70,800 CF3= $91,080 R= 12%

  22. Another Example: A Project has the following Net CFs: • Cost of the project (at time 0) is $200 • It has a net inflow of $100 in years 1 and 2 • It has a net outflow of $100 in year 3 • It has a net inflow of $200 in year 4 Must pay more in year 3. Why? Maybe to Refurbish the machines? Should the firm go ahead with the project? • Does the project add value? • Does it earn enough to compensate the investors? • Is the NPV >0? First write down the CFs for the project:

  23. Calculate NPV: CF0 = -200, CF1 = 100 2 times, CF2 = -100, CF3 = 200

  24. Example Continued: What if the discount rate is 20% instead of 10%. • The cash flows are already entered so just change R: Now the project’s NPV < 0, so the project does not add value at R = 20% • Why would the discount rate (R) be 20% instead of 10%? • Because it costs the firm more to raise capital. • In other words: The investors demand a greater return. (Why? ) • Possible reasons: • It is a riskier project: Before Toilet Paper CFs (10%), Now Yacht CFs (20%) • The general cost of capital in the economy is higher: • More perceived risk in the overall (macro) economy • Less money available to be invested (lower supply of money  higher price of money) • So what happens when the Fed Eases? Tightens?

  25. Clicker Question: • A project costs $3,000 today • It will have positive CFs of $600 per year for 10 years. • In addition, it will cost $200 to clean up the mess caused by the project at time 10 • The proper discount rate is 10%. • Calculate the project’s NPV: • $609.63 • $2,800.00 • $3,000.00 • $3,400.77 • $4,207.25

  26. Clicker Answer: Time Subscripts: CF0 = -$3,000, CF1 through CF9 = $600, CF10 = $400 Calc Subscripts: CF0= -$3,000, CF1= $600 nine times, CF2= $400 The Answer is A. So pay $3,000 today for DCFs worth $3,609.63 So the NET Present Value (or NPV) = $609.63 Extra Question: What if the discount rate increases to 15%? The new NPV is -$38.18 < 0

  27. Calculating NPV with EXCEL VERY IMPORTANT: • The Excel NPV() function does NOT calculate NPV!!!! • It calculates PV of the CFs ! • Also called the Discounted Cash Flows (or DCFs) • Example on page 242shows how to calculate NPV in Excel Make sure you can do this! • See if you can use Excel to calculate the NPV for the previous examples in the slides.

  28. Consider NPV as a Decision Rule: • NPV accounts for the Time Valueof money • Later CFs are discounted more • $100 discounted by 10% in 2 years = $100/1.12 = $83 • $100 discounted by 10% in 10years = $100/1.110= $39 • NPV accounts for Risk of the cash flows • Greater the risk, greater the cost of the company’s capital • Greater return is required by investors • You want to make yachts? Give me 20% on my investment. • You want to make toilet paper? I’ll take 10% on my investment. • The Cost of the Firm’s Capitalis the discount rate (R) • The greater the R, the smaller the NPV • NPV measures the Increase in Value from undertaking the project • If we have two mutually exclusive projects • Select the one with the higher NPV • Since it adds more value to the firm

  29. Other Rules: • Are there other ways to determine if we should do a project? • NO! • But we’ll look at some other common rules anyway • To see how they work • And try to see why they are flawed. • The Payback Period Rule • Yes, you are responsible for this rule • Internal Rate of Return • Yes, you are responsible for this rule • Profitability Index • Yes, you are responsible for this rule • Average Accounting Return • Modified Internal Rate of Return • No, you are not responsible for these rules

  30. 8.4 Internal Rate of Return (IRR) • IRR is the R that that makes the NPV = 0 • NPV = CF0 + CF1/(1 + R) + CF2/(1 + R)2 + … + CFN/(1 + R)N • What R do I plug in to make NPV = 0: • 0 = NPV = CF0 + CF1/(1 + IRR) + CF2/(1 + IRR)2 + … + CFN/(1 + IRR)N Example: CF0 = -$100; CF1 = $60; CF2 = $60 • So this project costs $100 and pays $60 twice • Calculate the IRR for the project: • First we’ll estimate the IRR: • NPV = CF0 + CF1/(1 + R) + CF2/(1 + R)2 • R = 12%  NPV = -$100 + $60/1.12 + $60/1.122 = $1.40 • R = 14%  NPV = -$100 + $60/1.14 + $60/1.142 = -$1.20 • So the IRR must be between 12% and 14% • R = 13%  NPV = -$100 + $60/1.13 + $60/1.132 = +$0.09 • So IRR is close to 13%

  31. Use the Calculator to Calculate IRR: Time Subscripts:CF0= -$100; CF1 = $60;CF2 = $60 Calc Subscripts:CF0= -$100; CF1 = $60 two times • IRR = 13.07% • So what does this mean? • How do we interpret IRR?

  32. The IRR “Decision Rule” • Or How to Interpret IRR • The IRR is what the project earns • So does it earn ENOUGH? Does it earn more than REQUIRED? • If the IRR is Greater than the Required Return, the NPV is Positive • So Accept the Project IRR > R NPV > 0Accept • If the IRR is Less than the Required Return, the NPV is Negative • So Rejectthe Project IRR<R NPV<0Reject For this Example, IRR = 13.07%: • If R = 12%IRR > R NPV > 0Accept the project • Since it adds value • If R = 14%IRR<R NPV<0Reject the project • Since it does not add value • Where does R come from? It is the return required by the investors • For now it is given (but we will calculate it later)

  33. Graph of NPV and R: • When NPV = 0, R = IRR. This happens at R = 13.07% • If the Required Rate (the Hurdle Rate) < IRR, then Accept the project since NPV > 0 • If the Required rate for this project is 12%, accept. If it is 14%, reject.

  34. Clicker Question: • A project costs $5,000 today • It will have positive CFs of $800 per year for 10 years. • Calculate the project’s IRR • 5.0105% • 6.0105% • 7.0105% • 8.0105% • 9.6059%

  35. Clicker Answer: CF0 = -$5,000, CF1 through CF10 = $800 CF0 = -$5,000, CF1$800 ten times The Answer is E. Bonus Question: What is the NPV of these CF at 9.6059%? • The NPV is $0.00! • The IRR is the discount rate that makes the NPV = 0

  36. Problems with IRR: Cash Flows that Change Signs: • A mining project costs $90 • It pays $132 in year 1 and $100 in year 2 • Clean up costs in year 3 are $150 • CF0 = -$90, CF1 = $132, CF2 = $100, CF3 = -$150 • R = 5%  NPV = -$90 + $132/1.05 + $100/1.052- $150/1.053 = -$3.16 • R = 25%  NPV = -$90 + $132/1.25 + $100/1.252- $150/1.253 = $2.80 • R = 50%  NPV = -$90 + $132/1.50 + $100/1.502- $150/1.503= -$2.00 • At very low discount rates (5%): $132 + $100 = $232 inflows do not compensate for the $90 + $150 = $240 outflows • At very high discount rates (50%): $150 outflow year 3 is not as important relative to the inflows at times 1 and 2 If the CFs change signs, the IRR rule may not work 

  37. Use the Calculator to Compute IRR: • For a project when the CFs change signs… • CF0 = -$90, CF1 = $132, CF2 = $100, CF3 = -$150 What does the NPV, R graph look like for this project? 

  38. Graph of NPV and R: When NPV = 0, R = IRR. This happens at R = 10.11% and 42.66% If Required Rate < 42.66%, accept, but less than 10.11%, reject The IRR rule (if the required rate is less than IRR, accept) does not work!

  39. Another Problem with IRR: Mutually Exclusive Projects: • Both projects require the same factory or land or HR or… • Assume a 10% required return for either project • Calculate the IRR for Each Project (using calculator) • IRRA = 19.43% • IRR Rule: 19.43% > 10% so IRR > R so Accept Project A • IRRB = 22.18% • IRR Rule: 22.18% > 10% so IRR > R so Accept Project B

  40. IRR and Mutually Exclusive Projects The Required Rate = 10% • IRRA= 19.43% • IRRB= 22.18% • So both have IRR > R. • So which do we accept? Must calculate the NPV of each project at 10%: • NPVA = $64.05 • NPVB = $60.74 NPVA > NPVB so accept A What if the required rate is 15%? Calculate NPV of each project at 15%: • NPVA = $28.36 • NPVB = $33.84 NPVB > NPVA so accept B What do the graphs of these two projects look like? 

  41. Graph of Projects A and B: At 15%, Project B is better. At 10%, Project A is better.

  42. How to find Crossover Point: Calculate the IRR of the differences in the CFs: This also works for B – A as well. Try it!

  43. 8.5 The Profitability Index (PI) Profitability Index = PV/Cost For Project A at 15%: • PV = $325/1.15 + $325/1.152 = $528.36 • Cost = $500 • PI = $528.36/$500 = 1.06 Rule: If PI > 1 then accept the project IF PI > 1, then PV > Cost so it must mean the NPV > 0 For Project A at 25%: • PV = $325/1.25 + $325/1.252 = $468.00 • Cost = $500 • PI = $468.00/$500 = 0.94 Rule: If PI < 1 then reject the project IF PI < 1, then PV < Cost so it must mean the NPV < 0 Almost identical decisions to NPV The problem is with mutually exclusive projects 

  44. Problem with PI: Mutually Exclusive Projects: • Consider projects A and B again: • Now look at the NPV and PI for each project at different discount rates: At 5% and 10% • A adds more value since NPVA> NPVB, so choose A • But since PIB> PIA, the PI rule leads to the wrong decision.

  45. 8.2 The Payback Period Rule • Count the number of years it takes to recoup the initial investment • If the number of years is fewer than the required years, accept. Example: • CF0 = -$165,000; CF1 = $63,120; CF2 = $70,800; CF3 = $91,080 • Year 1: $165,000– $63,120= $101,880 (cost not yet recovered) • Year 2: $101,880 – $70,800= $31,080 (cost not yet recovered) • Year 3: $31,080 – $91,080= -$60,000 (recovered during year 3) • Payback Period = 2 yrs + Portion of next year needed to get the rest 2 + $31,080 / $91,080 = 2 + 0.34 = 2.34 years • If required payback period is 2 years, reject the project. • If required payback period is 3 years, accept the project.

  46. More Payback Period Examples: • Compare the Payback Period to the NPV • Assume we require our investment back in 2 years • Which projects do we accept? The Payback Rule Suggests: • Incorrectly Reject Project A (since Payback > 2 but NPV > 0) • Incorrectly Accept Project E (since Payback < 2 but NPV < 0)

  47. One More Payback Period Example (Similar to table 8.2 on page 245) • We can see that the “Long” Project is best • “Long” adds the most value – it has the highest NPV • The Payback rule does not distinguish between Short 1 and Short 2 • Also, according to the Payback Rule, Short 2 is better than Long

  48. Clicker Question: Calculate the payback period for each project: • 2.50, 2.67, 3.25 • 2.50, 3.00, 3.50 • 3.00, 3.00, 4.00 • 3.00, 3.00, 4.25 • 3.67, 3.67, 3.25

  49. Clicker Answer: Project 1: $500 = $200 + $200 + .5($200)  2.50 Years Project 2: $500 = $100 + $200 + .67($300)  2.67 Years Project 3: $500 = $0 + $0 + $0 + .25($2,000)  3.25 Years The Answer is A. Bonus Question: Which Project is Best is R = 10%? Must Calculate the NPV at 10%! Project 3 is best since it has the greatest NPV at 10%

  50. Consider Payback Period as a Decision Rule: • The Payback rule does not account for the time value of money • With a 2 year rule, CF1 and CF2 are the same. • The Payback rule does not account for the risk of the cash flows • High risk projects and low risk projects are the same. • Payback rule gives no indication of the project’s value. • If we have two mutually exclusive projects • Select the one with the shorter payback period • Since it adds more value to the firm • Consider “Long” and Short 2 from the previous page: • Long adds more value but has the longer Payback period Implicitly, the payback rule ASSUMES: • R = 0 for any CFs prior to the payback period • R = infinity for any CFs after (since they are not considered) • CF