1 / 64

Manufacturing Execution System

Manufacturing Execution System. Jun Alzona. Agenda. Terminology EDM / PLM PDM – Planning Data Management Process Plan Authoring Process Work Instruction Delivery-Shop Floor Control Data Packages Across Major Processes. Agenda. Requirement Definition Discussions Process Plans

vega
Download Presentation

Manufacturing Execution System

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Manufacturing Execution System Jun Alzona

  2. Agenda • Terminology • EDM / PLM • PDM – Planning Data Management Process • Plan Authoring Process • Work Instruction Delivery-Shop Floor Control • Data Packages Across Major Processes

  3. Agenda • Requirement Definition Discussions • Process Plans • Process Plan Revision • Plan Revision to Work Order Supersede • Shop Floor Control - Work Order Execution • Work Order Alterations • Work Order Alteration Propagation • After Market- Maintenance, Repair and Overhaul

  4. Terminology

  5. AVL Approve Vendor List • AM Asset Management • BO/Stamp Buyoffs • CHAR or IP Key Characteristics or Inspection Points of Engineering Design/ Drawing that are Common or Part Specific • D/C Data Collection • DP Data Package • EBOM Engineering BOM • ECO Engineering Change Order Terminology

  6. ECR Engineering Change Request • ECM Engineering Change Management • EDM Engineering Data Management • Effectivity - End Item or Component Date or Unit Effectivity that Drives Manu facturing Planning of Any Part - Can Dictate Routing, BOM, IP’s and Tools etc… to Manufacture or Assemble a Part • MBOM Manufacturing BOM (Work Order BOM) • MCO Manufacturing Change Order Terminology

  7. MRO Maintenance, Repair and Overhaul • PBOM Production BOM– BOM Used by MRP • PLC Product Life Cycle • PLM Product Life Cycle Management • PO/POLI Purchase Order /PO Line Item • PPP Process Planning Package (Data Package - Work Instruction) Contains Versions and Revisions of any Process Plans Related to a Particular Engineering Drawing Release Terminology

  8. PP Process Plan (Work Instruction) Contains All Revisions Associated to Process Plan as well as Detail Instructions and Required D/C etc…. • SFC Shop Floor Control • SM Supplier Management • WO Work Order Terminology

  9. Configuration / Product Structure • EBOM Engineering BOM • PBOM • Production BOM • The BOM Used by MRP/ERPs • May or May NOT Match Engineering EBOM but Still Per Engineering • Producibility is One of the Primary Reasons Terminology

  10. Configuration / Product Structure • MBOM • Manufacturing BOM or As Planned BOM (Work Order BOM) • A Snapshot of the PBOM • Can Have a Life of Its Own Terminology

  11. Configuration / Product Structure • ABBOM • As Built BOM (Work Order Material Transactions – Actual Component Usage/Issues) • Includes Remove and Replace Components –BUT is STILLthe AS BUILT • Reference BOM for MRO Type Orders Terminology

  12. Configuration / Product Structure • AMBOM • As Maintained BOM (MRO) • Remove and Replace Components of ABBOM = AS Maintained BOM • Becomes the Reference BOM for down the road MRO type activity Terminology

  13. Engineering Data Management

  14. NO Resubmit / Close Yes WIP Disposition Engineering Data Management: Product Life Cycle

  15. Planning Data Management

  16. Item Char Controls: Revision Date and or Unit Effectivity Optional Data Load or Interface Item Controls: Revision Serial Lot Heat Code Date Code Configuration Control Planning Data Package P or M BOM Controls: Revision Date and or Unit Effectivity Work Plan Controls: Version Revision Date and or Unit Effectivity Planning Data Management Process

  17. Plan Authoring Process

  18. E-Item E- BOM • Operation/Step Instruction with Operationalized • Work Instruction (Texts) • Components (PBOM) • Characteristics or IPs • Tools • Skills Requirements • Buyoff’s (Manufacturing, Quality & Customer) • Standard Text • Doc’s • Media • CAD Date or Unit Effectivity • Summary Tabs • Components • Characteristics or IPs • Tools • Skills Requirements • Buyoff’s (Manufacturing, Quality & Customer) • Standard Text • Doc’s • Media • CAD Plan Approval • Basic Operational Business Rules: • An Operation can have multiple Steps • Operation Steps are sequential by default • Operation Steps can also contain elements authored in an operation • You can have sequential operations leading to parallel operations and vice versa • Sequential and Parallel Operation rules enforced during execution • Completion at Operation Level ONLY, validation ONLY enforce if Step has any D/C Approved Plan UPDATE Yes NO = No Action Plan Authoring Process

  19. Work Instruction Plan DeliveryShop Floor Execution Process

  20. AS BUILT AS PLANNED D A T A P A C K A G E • Operation/Step Instruction with Operationalized • Work Instruction (Texts) • Components (MBOM) • Characteristics or IPs • Tools • Skills Requirements • Buyoff’s (Manufacturing, Quality & Customer) • Standard Text • Doc’s • Media • CAD • Summary Tabs • Components • Characteristics or IPs • Tools • Skills Requirements • Buyoff’s (Manufacturing, Quality & Customer) • Non Conformance • Corrective Action • Standard Text • Doc’s • Media • CAD Operation Complete WO Complete Routing Update Traceable Part’s Consumed Latest Plan Revision Plan Supercede Work Instruction Plan Delivery Execution Process

  21. After Market Maintenance, Repair and Overhaul

  22. Operation/Step Instruction with Operationalized • Work Instruction (Texts) • Common Components • Characteristics or IPs • Tools • Skills Requirements • Buyoff’s (Manufacturing, Quality & Customer) • Standard Text • Doc’s • Media • CAD Date or Unit Effectivity • Summary Tabs • Components • Characteristics or IPs • Tools • Skills Requirements • Buyoff’s (Manufacturing, Quality & Customer) • Standard Text • Doc’s • Media • CAD Plan Approval Routing Update After Market: MRO Planning Process

  23. After Market Maintenance, Repair and OverhaulExecution Process

  24. AS MAINTAINED D A T A P A C K A G E AS BUILT • Operation/Step Instruction with Operationalized • Work Instruction (Texts) • Common Components • Characteristics or IPs • Tools • Skills Requirements • Buyoff’s (Manufacturing, Quality & Customer) • Standard Text • Doc’s • Media • CAD • Summary Tabs • Components • Characteristics or IPs • Tools • Skills Requirements • Buyoff’s (Manufacturing, Quality & Customer) • Standard Text • Doc’s • Media • CAD Operation Complete WO Complete Routing Update Traceable Part’s Consumed After Market: MRO Execution Process

  25. Data Packages

  26. Manufacturing and Quality Processes E-Item E- BOM Yes Plan Supercede ConfigurationControl Entire Data package Production After Market Data Package Across Major Processes

  27. Ease of Use

  28. Ease of Use • Process Plan • Copy Plan • Copy Operation/s • Used of Standard Operation • New Plan Revision – electronic push to Shop Order/s with previous revisions • Alerts on Objects with Latest Revision • Characteristics • Media • Standard Operation etc…..

  29. Ease of Use • Shop Orders • Traceability (contains all related records such as NCs, Cas, P/Ns, Tools, Buyoffs, Alteration, media etc…..) • Alerts on Plans with New Revision • Ability to pull in Plan with Latest Revision • Proactive check at Operation and Work Order Level • Shop Order Alteration (Redlines) • Propagate to Other Work Orders • Push change upward to Process Plan • Alerts on Object with Latest Revision • Characteristics • Media • Standard Operation

  30. Ease of Use • Data packages • Online and Real Time • Reduce and or eliminate the need for Tribal Knowledge • Single Database • Audit and History • Access can be made available to customer

  31. General Requirement Discussion

  32. OEM (Original Equipment Manufacturing) • Process Planning Package • Process Plan • Operations • Operation Steps • Data Collections • Approval Process • Alerts General Requirement Discussion

  33. OEM (Original Equipment Manufacturing) • Shop Floor Control • Order Types • Operation • Operation Steps • Data Collections • Alerts • Holds • Non Conformance • Alteration • Approval Process General Requirement Discussion

  34. After Market • Master Planning Package • Master Plans • Plan Types • Work Scope • Subjects (Service Bulletins) • Operation • Operation Steps • Data Collections • Approval Process • Alerts General Requirement Discussion

  35. After Market (continued) • Shop Floor Control • Order Types • Operation • Operation Steps • Data Collections • Alerts • Alteration • Approval Process General Requirement Discussion

  36. Process Plan • Types • Version • Revision • Effectivity OEM: Process Planning Package

  37. Operation • Revision Control • Operationalized Components • Operationalized Characteristics • Manufacturing Type • Engineering Type • Revision Control • Operationalized Tools/Machines OEM: Process Planning Package

  38. Operation (continued) • Buyoffs • Manufacturing • Quality Inspector • Source Inspector • Engineering • Customer • Skill Requirement OEM: Process Planning Package

  39. Operation (continued) • Standard Operations • Standard Text • Multi Media (Image, Drawings, 3D Models etc…..) • Revision Control • Manufacturing BOM (Work Order BOM) – As Planned BOM OEM: Process Planning Package

  40. Operation Steps • The SAME Operation Authoring Capability • Sequential by Nature OEM: Process Planning Package

  41. Approval Process (QUEUES) • ME – Manufacturing Engineering • QA – Quality Assurance • Customer OEM: Process Planning Package

  42. Process Plan Revisions • ALERTS when a Plan is Viewed • Operation • Operationalized Components • Operationalized Characteristics – Part Number and Characteristics Combination Latest Revision Exists • Manufacturing Type • Engineering Type OEM: Process Planning Package

  43. Process Plan Revisions • Operation (continued) • Operationalized Tools – Obsolescence • Standard Operations – latest Revision exist • Standard Text - latest Revision exist • Multi Media (Image, Drawings, 3D Models etc…) - Latest Revision Exists • Revision Control OEM: Process Planning Package

  44. Revision Approval Process (QUEUES) • ME – Manufacturing Engineering • QA – Quality Assurance • Customer OEM: Process Planning Package

  45. Plan Revision and Supersede • Plan Requires a Revision to Accept Any Latest Revision Components or Objects • List of Work Order with Prior Revisions to Be Available when Viewing a Plan of the Latest Revision OEM: Process Planning Package

  46. Plan Revision and Supersede • User Can Select Specific Work Order for Plan Supersede • Plan Supersede Business Rules: • ONLY Pending Operation can be superseded • Active or Completed CANNOTbe superseded • Active Operation can be Superseded ONLY if the Following Conditions Exist: • No Component Parts D/C • No Characteristic D/C Exist • No Tools D/C • No Buyoffs OEM: Process Planning Package

  47. Work Order • Order Types • Version /Revision • Effectivity (Date, Serial and or Unit) • Serialized • Multi Serial • Each Serial Number Can Have and Will Have a Life of Each Own Within a Work Order OEM: Shop Floor Control

  48. Work Order (continued) • Lot Control • Lot and Serials • Each Serial Number Can Have and Will Have a Life of Each Own Within a Work Order • No Lot or Serial Control OEM: Shop Floor Control

  49. Work Order Status • Pending • In Queue • Active • Complete • Cancelled • Alteration Hold OEM: Shop Floor Control

  50. Operation Status • Pending • In Queue • Active • Complete • Active • Skipped • Alteration Hold OEM: Shop Floor Control

More Related