80 likes | 191 Views
Proposed White Paper Outline. 2006. April 10-11 The 11 th CJK B3G Meeting. Agreed Workplan. Objective To build up a common understanding on system requirements and enabling technologies for B3G among China, Japan and Korea Output
E N D
Proposed White Paper Outline 2006. April 10-11 The 11th CJK B3G Meeting
Agreed Workplan • Objective • To build up a common understanding on system requirements and enabling technologies for B3G among China, Japan and Korea • Output • White Papers for system requirements and enabling technologies for B3G • Scope • To investigate system requirements and enabling technologies for B3G on a technical neutral basis including; • Multiple Access schemes • Component technologies • Purpose • To contribute technical activity outside standardization bodies including ITU-R and APT *Ref.: Annex C in the last meeting minute, CJK-B3G_10_108
Goals at this meeting • Initiate drafting white paper document • Make consensus ToC & outline of white paper document • TTA proposed outline in the next slide. • CJK materials presented in the last meetings need to be also consolidated into the appropriate chapter. • Election of Editors and a Chief Editor • TTA: Dr. Sungkwon HONG (NGMC SR Ad-Hoc Vice Chair, Samsung)
Proposed Outline • Chapter 1: Introduction • General information of B3G studies of each country • Objective & Purpose of White Paper • Chapter 2 : Scope • To investigate system requirements and enabling technologies for B3G on a technical neutral basis • Chapter 3: Terminology • Explain definition and abbreviation of terminology • Chapter 4: High level description of B3G system requirement • Details on it would be proposed by TTA in another document.
Cont. • Proposed Chapter 5 outline referred following materials • “Several Key Technologies Consideration for B3G”, CJK-B3G#10_010 • “Key Technologies for 4G System”, CJK-B3G#10_014
Timeline Phase 2 : Technical Discussion Phase 3 Phase 0 Phase 1 Step 1 Step 2 White Paper Solicitation Consolidation 5 . Consolidate & discuss the WRC - 07 Timeline 1 . Develop workplan & contents 2 . Draft structure outline 6 . develop the initial document 3 . solicit documents 7 . Receive & Review final inputs 4 . Define enabling technologies 8 . finalize the docuement White Paper Open to the public 05 . 9 07 . 6 ’ ’ 03 . 9 04 . 3 . 06 . 6 ’ ’ ’ • Until the next meeting, existing CJK materials should be placed in appropriate chapters • Active contributions towards each chapter are highly recommended