1 / 33

Recent Lighting and Marking Design Challenges/Trends

Recent Lighting and Marking Design Challenges/Trends. FAA Eastern Region Airports Conference Wednesday, 4 April 2012 Presented by: Pete Butler, P.E. AGENDA. 1. Pavement Markings Widths and Lighting Coordination. 2. Special Category Approach Authorizations. 3. LED Developments. 4.

velma
Download Presentation

Recent Lighting and Marking Design Challenges/Trends

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Recent Lighting and Marking Design Challenges/Trends FAA Eastern Region Airports Conference Wednesday, 4 April 2012 Presented by: Pete Butler, P.E.

  2. AGENDA 1 Pavement Markings Widths and Lighting Coordination 2 Special Category Approach Authorizations 3 LED Developments 4 Questions

  3. Pavement Markings Width • FAA AC 150/5340-1K – Standards forAirport Markings • Issued November 17, 2010 • Draft version of AC • Proposed 12” wide stripingfor taxiway centerlines • Final AC • 6” and 12” wide striping

  4. Pavement Markings Width • Striping width(6” and/or 12”) • Based on taxiing operations • Width needs to be uniform except for special conditions

  5. Pavement Markings Width • 12” wide striping • SMGCS taxi routes • Confusing intersections • Troublesomerunway exits • 6” or 12” wide striping • Other taxi routes

  6. Pavement Markings Width • Design for multiple widths • How and where does transition occur?

  7. Pavement Markings Width • Transition from 6” wide to 12” wide • Start/end of SMGCS route • Runway hold position markings • Taxiway intersection markings • ILS/MLS or POFZ hold position markings • Non-movement area boundary marking

  8. Enhanced Markings • Holding positionmarkings • Taxiway intermediateholding positionmarking. • Taxiway centerlinemarkings on SMGCS routes • Surface painted holding position sign markings • Geographic position marking

  9. Marking Width Selection • Consider all Impacts • Visibility / Conspicuity to pilots • Maintenance / Operational • Lighting

  10. Visibility / Conspicuity Impacts • Converging Intersections • Lack of site experience • Confusing Intersections • Recommend 12” wide markings

  11. Maintenance/Operational Impacts • 6” Width - Less Paint/ Less Cost • Different widths on site • Different procedures, organize activities • Consider standardization • Time / Shutdowns required to maintain

  12. Lighting Impacts • Taxiway Centerline Lighting locations • Based upon marking location • Offset dimension is critical • 2’ vs. 2.5’ • SMGCS operations, i.e. 12” wide striping

  13. Lighting Impacts • Runway Guard Lights • 6” and 12” stripes on airfield • Transition between widths at hold position • Recommend maximizing lighting offset

  14. Lighting, Marking and Signage Composite Drawings • Recent client request • One set of drawings incorporates • Lighting • Marking • Signage

  15. Lighting, Marking and Signage Composite Drawings • Easier to visualize proposed runway, taxiway, etc. • Facilitates drawing reviews • Incorporate into Airport Certification Manual

  16. Lighting, Marking and Signage Composite Drawings

  17. Special Authorization Procedures • Recent FAA focusto institute SpecialAuthorization Approaches • Category I (CATI) • Category II (CATII) • FAA link tracks authorizations issued

  18. Special Authorization Procedures • Procedure Requests typicallydriven by Flight Procedures • FAA Order 8400.13D • Defines party requirements and responsibilities • Checklists to document facilities, evaluate equipment, record performance, and confirm operations

  19. Special Authorization Procedures • Responsible parties • FAA • Airport Sponsor • Airlines / Operators • FAA All Weather Operations Program Manager (AWOPM) • Administers the Procedure Requests

  20. Special Authorization Procedures • Airport • Letter of concurrence • Establishes lighting,markings, signage, etc. • Provides backup/standby power • Revise ALP as needed

  21. Special Authorization Procedures • Airlines • Confirm approach will be utilized • Document aircraft equipped for proposed operations

  22. Special Authorization Procedures • FAA Participation • Flight Standards • Airport District Office • Regional Office • Flight Procedures Office • Technical Operations • ATO • Flight Inspection Operations

  23. Special Authorization Procedures • Participants provide inputand complete checklists • Checklists are submitted to AWOPM • AWOPM Collects and Reviews checklists • Confirms facility compliance • Procedure is developed

  24. Special Authorization Procedures • CAT I Approach –Decision Height (DH)of 200 feet and minimumsof 1800 feet RVR • Landing distance of 5000 ‘ • Equipment • Instrument Landing System (ILS) • SSALR or MALSR or ALSF2 • High-Intensity Runway Edge Lights (HIRL) • TDZ RVR

  25. Special Authorization Procedures • Special Authorization CAT I Approach - Decision Height (DH) of 150 feet and minimums of1400 feet RVR • Air Traffic Control Tower (ATCT) • Landing distance of 6000 ‘ • Equipment • ILS, SSALR or MALSR or ALSF2 • HIRL • TDZ RVR Sensor

  26. Special Authorization Procedures • Standard CAT II Approach – DHof 100 feet and minimums of1200 feet RVR • Equipment • ILS • ALSF-2 • HIRL, TDZ & Runway Centerline Lighting • TDZ, Midpoint and Roll-Out RVR Sensors • Standby Power

  27. Special Authorization Procedures • Special Authorization CAT II Approach – DH of 100 feet and minimum of 1200 feet RVR • Landing distance of 6000 feet • Equipment • ILS • SSALR or MALSR or ALSF2 • HIRL • Two RVR Sensors

  28. Special Authorization Procedures • Eastern Region Special Authorization Procedures • EWR Runway 22L CAT I • LGA Runway 22 CAT I • RIC Runway 34 CAT I • PHL Runway 27R CAT II in consideration • Currently working on SCAT II for CMH

  29. Special Authorization Procedures • Consider duringMaster Planning • Establish ultimateapproach capabilities • Identify equipment required • Determine incrementalequipment to lower category

  30. LED Developments • LED Runway edge lights – hot topic • Several vendors developing • Target date for availability not clear • Development of in-pavement lights has started • Lack of IR component

  31. LED Developments • Engineering Brief 67D • Issued March 6, 2012 • Revised spectral boundaries for white lamps • Added 4-year warranty for LED lighting fixtures

  32. LED Developments • Program GuidanceLetter 12-02 • Issued March 5, 2012 • Established life cycle cost analysis no longer be required for selection of LED fixtures for AIP-funded projects • LED obstruction lights, approach lights, and edge lights are not AIP eligible

  33. Thank You! Pete Butler 215.640.9102 Pete.butler@ch2m.com