1 / 9

PRAC Project Phase II: Sour Service Evaluation of ISO TR 10400 FAD Equation

PRAC Project Phase II: Sour Service Evaluation of ISO TR 10400 FAD Equation. API Production Research Advisory Committee Pete Moore – API PRAC Chairman Anand Venkatesh, Peter Ellis – Program Managers. Jan 23, 2012 Final Report Technical Session I – 3:45pm. Characterization Testing.

venice
Download Presentation

PRAC Project Phase II: Sour Service Evaluation of ISO TR 10400 FAD Equation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PRAC Project Phase II: Sour Service Evaluation of ISO TR 10400 FAD Equation API Production Research Advisory Committee Pete Moore – API PRAC Chairman Anand Venkatesh, Peter Ellis – Program Managers Jan 23, 2012 Final Report Technical Session I – 3:45pm

  2. Characterization Testing ALL TESTING IS COMPLETE FEA Report Complete Committee Report complete Mini-Pipe Testing (4) Full Size Pipe (1) NACE A Tensile CTOD DCB & HRC

  3. API PRAC PROJECT 2006-102475 Final Report (123 pages)

  4. API PRAC PROJECT 2006-102475 Final Report (123 pages) Will be posted soon to the API Website http://mycommittees.api.org/standards/ecs/sc5/Technical%20Papers/Forms/AllItems.aspx

  5. PRAC Project Phase III: Sour Service Evaluation of ISO TR 10400 FAD Equation API Production Research Advisory Committee Pete Moore – API PRAC Chairman Anand Venkatesh – Program Manager January 23, 2012

  6. PRAC III C110 Test Pipe Were Donated and Shipped to Honeywell by Tenaris Detailed Mill Test Report Documenting the Pipe Characterization Attributes

  7. PRAC III – Phase 3 Details • Testing Details: • NACE Standard TM0177 Method A – Tensile tests complete • NACE Standard TM0177 Method D – DCB tests complete • Mini/Tiny-Pipe SSC Tests – Machining Complete – EDM Notch cutting to start in February – Testing to begin late April • Full Scale Tests with Man-made OD Surface Imperfections • ID/OD and OD only or ID only H2S Exposure – Pressurized ID environment and OD exposure with replenishment/purging of 7% H2S in solution held in annular volume between plastic sleeve and OD of sample. – Testing to begin late 2012

  8. ~ 4 inches EDM OD Notch Machining of Tiny Pipe Complete EDM Notching to start in February

  9. Testing of Full Size Pipelate 2012

More Related