90 likes | 322 Views
PRAC Project Phase II: Sour Service Evaluation of ISO TR 10400 FAD Equation. API Production Research Advisory Committee Pete Moore – API PRAC Chairman Anand Venkatesh, Peter Ellis – Program Managers. Jan 23, 2012 Final Report Technical Session I – 3:45pm. Characterization Testing.
E N D
PRAC Project Phase II: Sour Service Evaluation of ISO TR 10400 FAD Equation API Production Research Advisory Committee Pete Moore – API PRAC Chairman Anand Venkatesh, Peter Ellis – Program Managers Jan 23, 2012 Final Report Technical Session I – 3:45pm
Characterization Testing ALL TESTING IS COMPLETE FEA Report Complete Committee Report complete Mini-Pipe Testing (4) Full Size Pipe (1) NACE A Tensile CTOD DCB & HRC
API PRAC PROJECT 2006-102475 Final Report (123 pages)
API PRAC PROJECT 2006-102475 Final Report (123 pages) Will be posted soon to the API Website http://mycommittees.api.org/standards/ecs/sc5/Technical%20Papers/Forms/AllItems.aspx
PRAC Project Phase III: Sour Service Evaluation of ISO TR 10400 FAD Equation API Production Research Advisory Committee Pete Moore – API PRAC Chairman Anand Venkatesh – Program Manager January 23, 2012
PRAC III C110 Test Pipe Were Donated and Shipped to Honeywell by Tenaris Detailed Mill Test Report Documenting the Pipe Characterization Attributes
PRAC III – Phase 3 Details • Testing Details: • NACE Standard TM0177 Method A – Tensile tests complete • NACE Standard TM0177 Method D – DCB tests complete • Mini/Tiny-Pipe SSC Tests – Machining Complete – EDM Notch cutting to start in February – Testing to begin late April • Full Scale Tests with Man-made OD Surface Imperfections • ID/OD and OD only or ID only H2S Exposure – Pressurized ID environment and OD exposure with replenishment/purging of 7% H2S in solution held in annular volume between plastic sleeve and OD of sample. – Testing to begin late 2012
~ 4 inches EDM OD Notch Machining of Tiny Pipe Complete EDM Notching to start in February