An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WMO SPICEGuthega Dam (Australia) Site Configuration Update Oct 10th, 2012 Information from Shane Bilish Prepared by Rodica Nitu

  2. Site Layout • Under development

  3. Data Flow and Archive

  4. Site Commissioning • Anticipated date of commissioning: 01 May 2013 • Expected status on commissioning: • References (where applicable): • R1: N/A • R2: N/A • R3: 2x Geonor T-200BM3, precipitation detector • Instruments under test: • Provided by the host: 3xETI NOAH II (DFIR fence, Half DFIR fence, Alter shield only) • From Instrument Providers: N/A • Instruments for Ancillary Measurements: T, RH, P, wind speed and direction (3 m and 10 m); snow depth possible • Expected status on Nov 15th: Operational with existing instruments only (3x NOAH II, T, wind speed and direction) • Gaps for the winter 2013: The site is expected to be fully operational (see Additional Information below)

  5. Additional Information (in blue, provided by the Shane Bilish, Oct 01, 2012) • Data archive; • Existing or planned: Existing • Frequency of data transmission site to an archive: At least weekly • Have you sent data to NCAR for pre-SPICE? No • Which is the reasonable frequency of data transfer to NCAR/SPICE archive to be expected during the experiment: To be agreed – weekly may be possible • Additional Information: • We are still in the process of finalising the site configuration and obtaining development approval. • In the event that approval is not received for two new instrument pedestals (for the R3 gauges), we propose to replace one existing NOAH II with a Geonor and install one new pedestal.