An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Federal Aviation Administration Airports Division Financial Programs Yampa Valley Reg. Airports Comm. Chris Schaffer, Colorado State Eng. July 14, 2011

  2. Airports Financial Programs • Airport Improvement Program (AIP) • Originally authorized by the Airport and Airway Improvement Act of 1982. • Recodified in 1994 and further amended in 1996, 1999, 2000, 2001, 2002, and 2003. • Passenger Facility Charge Program (PFC) • Originally authorized by “the Statute” (49 U.S.C. §40117). • Implemented by 14 C.F.R. Part 158 in 1991.

  3. Airport Improvement Program (AIP) • Highest aviation priority of the United States is the safe and secure operation of the airport and airway system. • Broad objective to assist in the development of a nationwide system of public use airports. • Maintain existing airport infrastructure. • Increase the capacity of facilities to accommodate growing traffic demands. • National Plan of Integrated Airport Systems (NPIAS).

  4. National Plan of Integrated Airport Systems (NPIAS) • Identified $52B in eligible infrastructure development between 2011 and 2015. • Construction costs estimates rose approx. 5%. • About 60% of the proposed development would rehabilitate existing infrastructure. • Mostly existing pavements. • About 40% of the proposed development would accommodate increased capacity. • Airfield and terminal expansions etc.

  5. Typical Development Needs • Runways, Taxiways, and Aprons • New construction • Rehabilitation • Lighting • Marking • Terminals • Roadways • Access roads • Service roads

  6. Typical Development Needs • Equipment • Aircraft rescue and fire fighting equipment (ARFF) • Snow removal equipment (SRE) • Storage buildings • Noise Mitigation • Miscellaneous • Land acquisition • Planning • Environmental mitigation

  7. Airport and Airway Trust Fund Tax Revenue Summary for the Airport and Airway Trust Fund

  8. Authorizations vs. Appropriations • AIP is dependant upon two separate Congressional actions. • Authorization • Gives FAA the authority to use trust fund monies and issue grants for airport development. • Sets the maximum limit of federal participation. • Appropriation • Obligation limitations based on economic considerations. • Appropriations are generally less than authorized levels.

  9. Authorizations vs. Appropriations

  10. Reauthorization? • Both the House and Senate have passed their respective versions of a reauthorization bill. • Significant differences remain to be resolved in committee. • AIP funding levels. • Fate of the Essential Air Service (EAS) program. • Slot distribution at Washington National Airport. • Changes to air and rail labor laws.

  11. Reauthorization? • FAA has not had a steady source of funding for nearly 4 years. • Current legislative authority for the Airport Improvement Program expires on July 22, 2011. • 20th short term continuing resolution since the program expired in 2007. • Approximately 90% of program entitlement funds are currently available.

  12. Reauthorization? • Current appropriation for the Airport Improvement Program expires on September 30, 2011. • Provides $3.515B in AIP funding. • Current authorization does not provide sufficient authority for this level of appropriation. • Final authority could be lower than years past. • Be prepared for additional extensions.

  13. NPIAS Airports

  14. U.S. Airport System

  15. Airport Categories

  16. AIP Distribution

  17. FAA Regions

  18. Entitlement Funds • Primary Airports • Entitlements are based upon the number of passenger boardings at the airport. • Minimum $1,000,000 per year. • Maximum $26,000,000 per year. • Yampa Valley Regional (HDN) • Approx. 110,000 enplanements (CY-10). • Approx. $1,350,000 annual entitlement.

  19. Entitlement Funds • Non-Primary Airports • Entitlements are calculated as a percentage (20%) of the documented capital needs for the facility. • Maximum $150,000 per year. • Steamboat Springs/Bob Adams Field (SBS) • $150,000 annual entitlement. • Craig/Moffat County Airport (CAG) • $150,000 annual entitlement.

  20. AIP Funding History • Yampa Valley Regional (HDN) • 37 AIP grants. • $42,903,825.00 • Steamboat Springs/Bob Adams Field (SBS) • 20 AIP grants. • $9,946,202.00 • Craig-Moffat County (CAG) • 12 AIP grants. • $2,484,767.00

  21. Passenger Facility Charge Program (PFC) • Any public agency that controls a commercial service airport, may impose a fee for each enplaned passenger at that facility. • Can choose PFC levels of either $1, $2, $3, $4, or $4.50. • These revenues can be used on eligible projects at any airport controlled by the public agency. • AIP and PFC eligibility rules are generally the same.

  22. PFC Related to AIP? • PFC funds are considered a special type of local airport revenue. • PFC funds can be used as the local match on an AIP project. • PFC funds can be used to supplement an AIP project. • PFC funds can be used to pay debt service and financing costs.

  23. Local Revenue • Projects funded exclusively with PFC revenue are not subject to certain federal requirements. • Davis-Bacon wage rates. • Disadvantaged Business Enterprise (DBE) goals. • Buy-American requirements. • Uniform Relocation Assistance and Real Property Acquisition Policy Act requirements.

  24. PFC Objectives • PFC projects must meet one or more distinct objectives: • Preserve or enhance safety, security, or capacity. • Reduce or mitigate noise impacts. • Furnish enhanced competition among air carriers. • And if approved higher than the $3 level: • The project cannot be reasonably expected to be funded from AIP. • For any landside project, all airside needs must be met first.

  25. Small Airport Fund • AIP entitlements at large and medium hub airports imposing a PFC are reduced and the funds returned to the AIP program. • 12.5% to the AIP discretionary fund. • 12.5% to small hub airports. • 25% to general aviation airports. • 50% to non-hub primary airports.

  26. PFC Funding History • Yampa Valley Regional (HDN) • 45 projects funded. • $5,386,500.00 • Steamboat Springs/Bob Adams Field (SBS) • 6 projects funded. • $159,575.00