1 / 17

Presented by: Michael Bottiglieri Josafat Gonzalez Madelyn Reid

Presented by: Michael Bottiglieri Josafat Gonzalez Madelyn Reid. Overview. Problem Statement Important Dates Scope Statement Current Status Next Step Summary. Problem Statement.

verity
Download Presentation

Presented by: Michael Bottiglieri Josafat Gonzalez Madelyn Reid

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Presented by: Michael Bottiglieri Josafat Gonzalez Madelyn Reid

  2. Overview • Problem Statement • Important Dates • Scope Statement • Current Status • Next Step • Summary

  3. Problem Statement The Team America Rocketry Competition calls for the participating teams to design, build, and fly a model rocket that will reach a specific altitude and meet an amount of flight time while carrying an egg without harming it.

  4. Important Dates

  5. Scope Statement • Purpose • Customers • Mrs. Brandner • Mr. Pritchard • Materials • Criteria and Constraints • Scheduling Conflicts • Track schedule

  6. Criteria & Constraints • Target altitude – 750 ft. • <1000 grams (2.2 pounds) • One stage engines • Commercially-made engines listed in handbook • ≤62.5 grams of propellant

  7. Criteria & Constraints (continued) • No pyrotechnic charge other than engine instructions permit • Parachute only recovery system for egg and altimeter • Parachute must be 15 (+/-1) inches in diameter • Not commercially-made kits

  8. Bill of Material

  9. Bill of Material (continued)

  10. Bill of Material (continued)

  11. Bill of Material (continued)

  12. Our Design

  13. Current Status • Building • PowerPoint assembly • Portfolio editing

  14. Next Steps • Testing • When weather improves • First qualifying round • Undetermined date

  15. Test Plan Template

  16. Possible Barriers • Timeline interference • Sports • Materials delay • Weather

  17. Summary • Competing in TARC • Currently • Building • Working on presentation materials • Beginning testing soon

More Related