An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Requirements Review Stanford AA236 11 July 2006

  2. Requirements Strategy • Non-Traditional Review • Bridging ConOps and Existing Design is Difficult • Create Minimal Set of Systems for a Satellite • Prioritize All Systems • Dual-Ended Approach • Current Subsystems • KySat Concept of Operations • Provide Focus • Limited Time to Complete KySat-1 • Required to Have Minimum Working System in August

  3. Critical Systems Frame Solar Panels Electrical Power System Batteries VHF / UHF System VHF / UHF Antenna Processor Board Required Systems Passive Attitude Control Mass Storage DTMF Decoder / Reset Real Time Clock / Backup Watchdog Timer Non-Critical Systems Camera S-band MP3 Decoder Chip Attitude Determination Active Attitude Control Separate Beacon Dosimetry Test SEU Test Deorbit KySat Requirement Priorities

  4. Frame Done – CubeSat Kit Solar Panels Yet to be Selected Power System Selected Need to Order/Evaluate Batteries Done VHF / UHF System Selected Need to Order/Evaluate VHF / UHF Antenna Big Issues Here Processor Board Done – CubeSat Kit Critical Systems

  5. Required Systems • DTMF Decoder / Reset • Decoder Selected • Need Back-End Logic, Front-End Conditioning • Mass Storage • FLASH Selected, Need File System • Passive Attitude Control • Material Selected, Unknown Orientation • Real Time Clock / Backup • IC Selected, Need PCB Designed & Built • Watchdog Timer • IC Selected, Need PCB Designed & Built

  6. Open Items • Bogota EPS • Errors in Documentation • Only Supports 5 Solar Panel Stacks • Full-Power Reset • Control Battery Heater • Over-Current Control • VHF / UHF • Wattage • AX.25 Non-Retransmit • APRS System Compatible

  7. Stanford AA236 11 July 2006