Yohkoh Galileo: To Infinity! … and Beyond!. Lockheed Martin’s Role in the Yohkoh Galileo Project 10 July 2002. Introduction . Purpose of the Yohkoh Galileo Project:
E N D
Yohkoh Galileo: To Infinity! … and Beyond! • Lockheed Martin’s Role • in the Yohkoh Galileo Project • 10 July 2002
Introduction • Purpose of the Yohkoh Galileo Project: “The Yohkoh Galileo project will complete higher-level data preparations and will archive the required calibration and technical information necessary for the extended use of the archive by scientists now and in the future.”
Lockheed Martin Tasks • Production of Level 0 data products • Retains original Yohkoh (Mons Morrison) format • Final delivery to SDAC (GSFC) • Publication of Level 1 data products • Publication of Level 2 data products • Publication of additional (Level 2+) products • Production of final calibration data products
Definition of Data Products • Level 0 Data (original format) • Level 1 Data: • FITS format - Maintain compatibility with latest FITS header definitions • FFI set - Uncompressed, despiked, dark subtracted, leak subtracted (but not spatially coaligned) • PFI (OR) set - Uncompressed, despiked, dark subtracted, leak subtracted and assembled
Definition of Data Products (continued) • Level 2 Data (SXT): • Desaturated (composited) • SSC (SXT Science Composite set): Uncompressed • SSS (Full disk movie version) • Replaces SFDs • Logarithmic compression and intensity normalized • Coaligned
Definition of Data Products (continued) • Level 2+ Data (SXT): • Descattering of SSC and SSS sets • Synoptic maps, coronal hole maps, active region catalog, flare catalog • Mission light curve data
Notes on FITS Definition • Final generation of FITS format • Format to be compatible with all standard fits headers available at that time (e.g., include observer position information) • Header content under review • Separate revision control for format and content • Files will contain only one solar image per file
Notes on FITS Content • Content definition of the SXT FITS header: • Will be led by Freeland with input from others. • Expect first draft of header to be released August 1. • Comments will be solicited. We strongly urge the other instrument teams to adopt a similar standard. • Expect the final version of the header to be released October 1.
Notes on FITS Definition • Open issues concerning FITS definition: • Make use of binary extensions features or avoid? • How to include history information? (Probably standardize a format using the comment field) • How to handle uncertainties • Separate archives or files (provides format longevity)? or • Two images per file (minimizes overhead)?
Notes on FITS Definition • Data format and content should be compatible with VSO/EGSO standards • SXT calibration data and certain generic data (e.g., ATT, FEM, etc) will be archived in FITS format
Status of Level 0 Tasks • Delivery of reformatted raw data (Level 0) to the SDAC: • On schedule for completion by July 31, 2002.
Status of Level 1 Tasks: • Leak subtraction software: • This is the major open calibration task. • Current algorithm (Metcalf/Acton) uses a two step correction procedure: • Subtraction of interpolated leak images • Removal of any residual component that remains correlated with the interpolated leak image.
Status of Level 1 Tasks: • Leak subtraction algorithms (continued): • Leak subtraction is handled separately for each ‘epoch’ of the mission (each epoch is defined to be the period between two successive SXT entrance filter failures) • Within each epoch there must be a sufficient set of valid terminator (leak) images for leak image interpolation • Currently, there are two short (~2 month) epoches in 1999 for which leak image sampling was insufficient to allow leak image interpolation. The leak image algorithms for these periods have yet to be developed.
Status of Level 2 Tasks: • Software is ready • Major outstanding task is ATT finalization
Status of Level 2+ Tasks: • Descatter - MSU • Synoptic map - Slater • 75% complete; expect 100% by 1 Oct 2002 • Catalogs - In progress
Status of Calibration Tasks: • Final calibration tasks: • Dark Subtraction algorithms: Completed. • Composite image generation techniques: Completed (three exposure composites now incorporated). • SSC/SSS generation pipeline: • In place and in use. • Currently implementing distributed processing (GLOBUS) on ISAS and LMSAL computers.
SXT data production pipeline • Data products beyond level 0 are in some cases interdependent. However, some of the calibration products (ATT, leak subtraction) are currently open-ended. Therefore, it is important to have data ‘pipelines’ set up for regenerating various data products multiple times over the course of the Galileo project
SXT data production pipeline • We propose to establish a ‘cycling’ queue for each data product (e.g., SSC set) which will run automatically as updates to software or calibration sets become available • In this way we can be assured that when the project nears completion we will not be caught without adequate to complete all data products
SXT data production pipeline • As part of the pipeline, we are devloping a GLOBUS system on the ISAS/LMSAL/MSU? Computers, to decrease the turn around times for data product versions
Additional Lockheed tasks • Update SXT emissivity software to incorporate new abundance and ionization data (with application to SXT temperature and emission measure calculations: sxt_teem) • GOES-12 SXI /SXT cross calibration • Yohkoh scientific campaign catalog • Improvement of user interface to SXT data (including full mission ‘events’ access)
Additional Lockheed tasks • Improvement of ATT (spacecraft pointing) database • SXT uncertainties • Generate for FFI • Seek to preserve photon statistics through the calibration process • Radiation Belt Monitor (RBM) Level-1 generation • Combined SXT/HXT/BCS flare catalog
Timeline • Level 0 complete by 31-Jul-02 • Level 1 ongoing • Level 2 ongoing • Level 2+ ongoing
LMSAL team: • Primary • S. Freeland, T. Metcalf, N. Nitta, G. Slater • Supporting • D. Alexander, M. Aschwanden, F. Friedlaender, J. Lemen, P. Shirts • Transitional • J. Bartus, H. Hudson, A. Takeda