1 / 11

Fs Logistica/Italcontainer intermodal network

Fs Logistica/Italcontainer intermodal network. 1. FS Logistica Company details. The State Railways Group's logistics services are outsourced to FS Logistica spa. FS LOGISTICA has been created in 2008

vesta
Download Presentation

Fs Logistica/Italcontainer intermodal network

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Fs Logistica/Italcontainer intermodal network 1

  2. FS Logistica Company details The State Railways Group's logistics services are outsourced to FS Logistica spa. FS LOGISTICA has been created in 2008 Integration, systems view, synergy, optimization of resources and service quality are the watchwords that guide the mission of FS Logistica toward achieving three fundamental objectives:• improving and developing the provision of service; • create a network of logistics functional rail, in partnership with national and international logistics operators; • create the conditions for competitors to compete with European dimensions. The Company owns logistics infrastructure throughout the country. Moreover, FS Logistica operates in the market services by using its Business Unit. The areas of main activities are petrochemical, environment and land management (BU Chemical Industry and Environment), steel (BU Steel), that of large institutional clients (Omniaexpress BU) and the distribution and logistics of consumer goods, made ItaliaLogistica through the new company, a joint venture with the Italian Post Office Group.

  3. Owner: FS Logistica with 100% shares • 50 milioni euro/year is the Italcontainer turnover • 60 are the Italcontainer employes • More than 4.000 block trains • 200.000 Teu transported The Service • Combined traffic (rail + terminal + truck+ depot services) • Rail + terminal • Every day we manage 16 trains on 15 rail connections • Every day we manage 250 truck services for combined traffic customers • Every day we handle 1.500 teu • Customers: Shipping companies (MSC,EVERGREEN,ZIM,MAERSK, COSCO), forwarders, truck companies

  4. The European network Italcontainer logistic system Rotterdam Hamburg Manchester Berlin Antwerp Bonen UK is served via EUROTUNNEL Nurnberg/Munchen Paris Milano Sm Bologna Genova Ravenna La Spezia Livorno Pomezia Marcianise Taranto Gioia Tauro Started the 6/09/2010

  5. Pomezia Bonen link: technical data Train runs 3 days a week round trip Length max : 500 mt. Tons northbound : 1.400 Tons southbound: 1.560 Average load factor per train : 28 Swap Bodies 13,60 m 5

  6. Bonen intermodal hub • 4 loading tracks with a total length of 1750 metres operated by cranes • Yard capacity 1000 TEU • 2 gantry cranes with max. 40 tons load • Handling of 20‘ - 45‘ containers, 7,15-13,60 metres swap-bodies, semi-trailer and mega-trailer • Optimal road access Direct to the highway A 2, exit in Bönen • Near to the Kamener Kreuz (A 1 / A 2)

  7. Departures from Pomezia Days 1,3,5 Train operations time limit Train delivery time in Bonen Door delivery time 15,00 day A 06,00 day C Dalle ore 6,30 g C Departures from Bonen Days 1,3,5 Train operations time limit Train delivery time in Pomezia Door delivery time 19,30 day A 9,00 day C Dalle 10,00 g. C Pomezia Bonen : 3 train/week scheduling Southbound stops: Day 2 and 4 in Bologna; day 6 in Milano Northbound stops: day 1 Bologna 7

  8. Departure from Bologna Days 2 Train operations time limit Train delivery time in Bonen Door delivery time 08,00 day A 06,00 day C By 6,30 day C Departures from Bonen Days 1,3 Train operations time limit Train delivery time in Bologna Door delivery time 19,30 day A 23,00 day B By 08,00 day C Bologna Bonen : 1 train/week scheduling 8

  9. Departures from Boenen Days 2,4,6 Train operations time limit Train delivery time in Manchester Door delivery time 04,00 day A 13,00 day B h 13,30 g B Departures from Manchester Days 2,4,6 Train operations time limit Train delivery time in Boenen Door delivery time 19,30 day A 23,00 day B Dalle 23,00 g. B Bonen – Duisburg- Manchester : 3 train/week scheduling Starting beginning of December 9

  10. Departures from Pomezia Train operations time limit Train delivery time in Widnes Door delivery time 10.00 Monday 06.00 Thursday 13.00 Thursday Departures from Widnes Train operations time limit Train delivery time in Pomezia Door delivery time 06.00 Saturday 13.00 Tuesday 14.00 Tuesday Pomezia Widnes ( direct): start up scheduling ( by 09/2010) By December 2010 we’ll have 2 trains/week 10

  11. For further informations please contact: Dott. Roberto Paliotta ( International Sales Manager) Tel 0039- 06-91990065 Mobile 0039-334-6289632 E-mail: 13/07/2014r.paliotta@italcontainer.it Mr. Raffaele Moretti ( International Sales Assistant) Mobile 0039-348-0853985 E-mail: 13/07/2014r.moretti@italcontainer.it Mr. Antonio Gennari ( International Sales Assistant) Mobile 0039-348-2312354 E-mail: 13/07/2014a.gennari@italcontainer.it Mr. Alexander Schultz ( International Sales Assistant) Tel 0049-171-8349397 E-mail: 13/07/2014a.schultz@denninghaus.com 11

More Related