1 / 5

Central Security Network Akumal

Central Security Network Akumal. Revised Proposal. Goals. High "Visibility Security Team". To attain maximum communication between all security companies and guards working in Akumal, and the local Police that will result in:

vevay
Download Presentation

Central Security Network Akumal

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Central Security Network Akumal Revised Proposal

  2. Goals • High "Visibility Security Team". • To attain maximum communication between all security companies and guards working in Akumal, and the local Police that will result in: • Minimizing time of response for backup from local Police during an incident. • Better police and security presence to provide a deterrent for future incidents. • To have an effective Reporting System that will provide necessary information and networking that will result in: • A data base of known suspects or criminals. A knowledge of “ Modus Operandi” for all incidents. • A better system in place to avoid future security breaches.

  3. Revised Budget for Phase 1May - Dec, 2010

  4. Budget Allocation by Section • Jade Bay- 116 bedrooms • Aventuras Akumal-80 bedrooms • Yalku North -18 bedrooms • $15 per bedroom x 214 =$3,210 USD

  5. North and Central Akumal • Section H – 226 Bedrooms • Section G – 215 Bedrooms • Section F – 118 Bedrooms • Akumal Bay – 97 Bedrooms • $50 x 656 bedrooms = $32,800 Total from all Bays =$36,010 Total Budget =$27,662.00 Difference to allow for Non Payers $8,348.00

More Related