1 / 10

OSOW Issues

OSOW Issues. Presented by Peter Lynch Freight Operations Program Manager University of Wisconsin – Madison On Site @ WisDOT MAASTO 2012 – Wednesday, October 17, 2012. OSOW Issues. Wind Farms 2013 Freight Corridors Multi-State Permitting Roundabout Update Auto Issue

vidar
Download Presentation

OSOW Issues

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. OSOW Issues Presented by Peter Lynch Freight Operations Program Manager University of Wisconsin – Madison On Site @ WisDOT MAASTO 2012 – Wednesday, October 17, 2012

  2. OSOW Issues • Wind Farms 2013 • Freight Corridors • Multi-State Permitting • Roundabout Update • Auto Issue • Electronic Permitting • Implements of Husbandry (IoH)

  3. Wind Farms 2013 • Develop 2013 Process Control Plan • Organized processes and set internal policy • Various wind routing maps • Route Surveying • Intersection Mitigation • Escorting Details • Production Tax Credit?

  4. Freight Corridors • Freight Corridors • Benefits of an OSOW FN • Assist design engineers identify where OSOW vehicles travel • Roundabouts • Interchanges • Intersections • Access Management • Overall Roadways

  5. Multi-State Permitting • Multi-State Permitting • WinnDOT Initiative • Northwest Passage • Bentley System • Interest should be directed to Kathleen Nichols, WisDOT DMV Permits Unit

  6. Roundabout Update • Roundabout Update • Low Clearance • Design Issues • Truck Aprons • Kansas State University Study

  7. Auto Issue • Online Auto Issuance of Permits • 30% of Wisconsin Permits Online • Encourage Multiple-Trip Online Permit Issuance • Compel online compliance • Responsibility of WisDOT? • Permit Path/Route • Achieve 50% of initial Wisconsin Permits Online? • If 50% is not achievable, then encourage online renewable permits.

  8. Electronic Permitting • Electronic Permitting Not Yet In Wisconsin • Copy of Permit in Vehicle • Paper Copy • Electronic Copy Problems (internet service) • Wisconsin’s history of Permit Length • Practice & Statutory Change

  9. Implements of Husbandry (IoH) • Study in progress! • Farm equipment continues to grow in size and weight • Current outreach effort being launched to work with Ag Industry to try and resolve regulatory issues adversely impacting their operations and infrastructure

  10. Questions? • Thank you. • Contact Information: Peter Lynch UW-Madison Freight Operations Program Manager (608) 267-4486 (Work) (608) 516-6395 (Cell) http://www.toplab.wisc.edu

More Related