1 / 7

GLAST Large Area Telescope LAT Pre-Shipment Review Subsystem Acceptance Program Pat Hascall

Gamma-ray Large Area Space Telescope. GLAST Large Area Telescope LAT Pre-Shipment Review Subsystem Acceptance Program Pat Hascall Systems Engineering Stanford Linear Accelerator Center. LAT Test Results Roadmap. Describe the Subsystem End Item Data Package (EIDP) process

viho
Download Presentation

GLAST Large Area Telescope LAT Pre-Shipment Review Subsystem Acceptance Program Pat Hascall

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Gamma-ray Large Area Space Telescope GLAST Large Area Telescope LAT Pre-Shipment Review Subsystem Acceptance Program Pat Hascall Systems Engineering Stanford Linear Accelerator Center Subsystem Acceptance

  2. LAT Test Results Roadmap • Describe the Subsystem End Item Data Package (EIDP) process • Summarize the Subsystem test program Subsystem Acceptance

  3. Subsystem EIDP Process • The individual subsystem boxes were documented and delivered using an End Item Data Package process • Contents of the package defined by Systems Engineering and I&T, to include test results and NCRs to be transferred to the LAT level • Each subsystem box has a web page containing links to the relevant Acceptance Test Data Packages • Links to the ATDP web pages are available on the PreShip Review page: • http://www.slac.stanford.edu/exp/glast/flight/rdm/livepreship/lat_preship_review.html • LAT Project Management, SE, and QA have formally accepted all subsystems Subsystem Acceptance

  4. Subsystem Websites • ACD • http://glast.gsfc.nasa.gov/acd/ • Calorimeter • http://heseweb.nrl.navy.mil/glast/ • Electronics and DAQ • http://www-glast.slac.stanford.edu/Elec_DAQ/Elec_DAQ_home.htm • Mechanical • http://www-glast.slac.stanford.edu/MechanicalSystems/MechHome.htm • Tracker • http://www-glast.slac.stanford.edu/Tracker-Hardware/default.htm Subsystem Acceptance

  5. Subsystem Environmental Test Summary Subsystem Acceptance

  6. Subsystem Waivers (1/2) Subsystem Acceptance

  7. Subsystem Waivers (2/2) Subsystem Acceptance