Facilities & Planning College Station Housing Construction & Major Maintenance Projects; EH&S; and Maintenance & Operations
2010-11 Current Construction Areas
College Station Housing • College Station Housing • A PSU project with American Campus Communities (ACC) to increase student residential facilities at PSU • Walsh Construction, Contractor • 368,612 GSF, 16 Floors, 978 Beds • Building to have student housing, three general pool classrooms, a lecture hall, ground floor retail • Construction is anticipated to start in early December 2010 and continue through Summer of 2012 • Sidewalks and parking adjacent to the property will be closed throughout the project. Max Green Line service continues • PSU Project rep. Kate Vance
Life Science Collaborative Building OUS/OHSU Life Science Collaborative Building at South Waterfront • Located at OHSU Schnitzer Campus • New building anticipated to collaboratively house OHSU, PSU, OSU and private partners • 9-story – 364,000 GSF Project Budget $160M • Building program is in refinement and includes; life sciences education & research, ground floor retail & parking • Contracts for project development are in process • Estimated construction start Summer 2011 • Estimated completion Winter 2014 • PSU Project representative, Kate Vance
Lincoln Hall Seismic and Systems Upgrade • State Deferred Maintenance $29.2 million • Main part of project completed in late August 2010. Building re-opened for use for Fall Term 2010 with FPA and General Pool classrooms re-opened • New Broadway Entry construction to begins late Spring 2011, with completion scheduled for late Summer 2011 • Installation of Photovoltaic panels begins late Spring 2011, with completion scheduled for late Summer 2011 • PSU Project Manager, Ron Blaj
Science 2 & Science Research & Teaching Center & Hazardous Waste Facility (SRTC) ● Building infrastructure upgrades and the expansion and modernization of labs and teaching space. State Limitation $45.3 M, various funding sources including General fund, grants, gifts, COPs, and bonds ● $2 Million CLEE research labs to complete construction this summer ● $2 Million EDA Grant to replace or add 71 fume hoods started Dec 2010 ● $300,000 in student fees being combined with state bond match to upgrade the lobby. ● Completion of the project Aug 2011 ● PSU Project Manager, Mark Fujii
Campus Steam & Chilled Water Loop Oregon Economic Stimulus Funded Project $17.5 million ● To improve and expand the network of heating and cooling piping throughout campus that forms our Campus Loop ● Leading to energy savings, more reliable service and increased capacity to heat and cool campus buildings . Estimated energy savings over $300,000 year ● Construction 7:30am - 4:30pm Monday - Friday; Intermittent noise and vibration. 93 jobs created ● Geothermal cooling of a new heat pump and chiller in SB2 ● Federal Grant of $1 M awarded to use more of the heat in the geothermal wells ● Completion of project Summer 2011 ● PSU Project Manager, Mark Fujii
Peter Stott Center Energy Upgrades ● Provide energy upgrades throughout the facility. Upgrades include; HVAC unit maintenance/ replacement, Lighting replacement and door and window weatherization ● Funding provided by American Reinvestment and Recovery Act (ARRA- Fed. Stimulus), Energy Trust of Oregon (ETO), Business Energy Tax Credits (BETC) and PSU ● Anticipated construction: May 2011 – August 2011 ● PSU Project Manager, Kate Vance
Campus Wide Metering Study ● This project was implemented in order to achieve PSU’s metering and energy management goals ● Study provides a inventory of the existing meters on campus and where future meters need to be installed in order to achieve PSU goals ● Goal: All aggregate building utility usage be metered digitally and captured in real time ● Insite group is the project consultant ● Study Completed. Awaiting funding to install meters ● PSU Project Manager, Quinn Soifer
Walk of the Heroines - Phase 2 • Additional Naming Wall • Stage with artistic paving • Art Boulder Hardscape elements • Additional Bench Seating • $370,000 budget of which is partially funded by PSU Students through the Student Building Fee. • Completion May 2011 • PSU Construction Manager, Jennifer Sharp
Potential Projects? • If you have a potential remodeling project in your plans contact our team and we will: • schedule a brief meeting to discuss scope • verify if project is feasible, or work with you to make it feasible • determine best delivery system – PSU crews or outside contractor, or consultant • manage design, permitting and estimating • oversee construction and completion of the project Francis McBride Construction Project Manager 503-725-8944 mcbridef@pdx.edu Ron Blaj Assistant Director Capital Project Management 503-725-4308 rblaj@pdx.edu
Facilities & Planning - Reception 503-725-3738 Questions? Ernest Tipton: tiptone@pdx.edu Ron Blaj: rblaj@pdx.edu Kate Vance kvance@pdx.edu Mark Fujii: fujiim@pdx.edu Jennifer Sharpsharpj@pdx.edu Quinn Soifersoiferq@pdx.edu our website www.fap.pdx.edu
Our Role: Help employees to work safely. Help supervisors provide employees with the information, skills, & tools they need to work safely Help administration to provide a safe workplace Help maintain compliance with environmental health & safety regulations (DEQ, OSHA and others) Environmental Health & Safety
Requesting Service from EH&S: Chemical Spill Emergency: 5-4404 (CPSO) Odor Reports: Call Facilities at 5-3738 Please submit a Work Order for all other service requests, including: - Ergonomic Assessments - Hazardous Waste Pick-Up http://www.fap.pdx.edu/workorder Environmental Health & Safety
Maintenance & Operations • Our team provides the following campus services: • Electrical • HVAC&R • Plumbing • Carpentry • Energy Management • Keys & Lockshop • Grounds Maintenance • Signs & Way Finding Michael McBride Lead Electrician 725-6062 mmcbride@pdx.edu Rick Viaene Chief Building Engineer 503-725-9996 viaene@pdx.edu Gerry Gadberry Assistant Director 503-725-9972 gadberry@pdx.edu Bob Folkerts Building Automation Supervisor 725-9981 rgf@pdx.edu
New telephone number effective May 2nd 725-2FIX(503-725-2349) FAP web page changes coming in early May http://www.pdx.edu/fap Simplified layout Easier to find information & resources Facilities Work Order System