An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Facilities & Planning College Station Housing Construction & Major Maintenance Projects; EH&S; and Maintenance & Operations

  2. 2010-11 Current Construction Areas

  3. College Station Housing • College Station Housing • A PSU project with American Campus Communities (ACC) to increase student residential facilities at PSU • Walsh Construction, Contractor • 368,612 GSF, 16 Floors, 978 Beds • Building to have student housing, three general pool classrooms, a lecture hall, ground floor retail • Construction is anticipated to start in early December 2010 and continue through Summer of 2012 • Sidewalks and parking adjacent to the property will be closed throughout the project. Max Green Line service continues • PSU Project rep. Kate Vance

  4. Life Science Collaborative Building OUS/OHSU Life Science Collaborative Building at South Waterfront • Located at OHSU Schnitzer Campus • New building anticipated to collaboratively house OHSU, PSU, OSU and private partners • 9-story – 364,000 GSF Project Budget $160M • Building program is in refinement and includes; life sciences education & research, ground floor retail & parking • Contracts for project development are in process • Estimated construction start Summer 2011 • Estimated completion Winter 2014 • PSU Project representative, Kate Vance

  5. Lincoln Hall Seismic and Systems Upgrade • State Deferred Maintenance $29.2 million • Main part of project completed in late August 2010. Building re-opened for use for Fall Term 2010 with FPA and General Pool classrooms re-opened • New Broadway Entry construction to begins late Spring 2011, with completion scheduled for late Summer 2011 • Installation of Photovoltaic panels begins late Spring 2011, with completion scheduled for late Summer 2011 • PSU Project Manager, Ron Blaj

  6. Science 2 & Science Research & Teaching Center & Hazardous Waste Facility (SRTC) ● Building infrastructure upgrades and the expansion and modernization of labs and teaching space. State Limitation $45.3 M, various funding sources including General fund, grants, gifts, COPs, and bonds ● $2 Million CLEE research labs to complete construction this summer ● $2 Million EDA Grant to replace or add 71 fume hoods started Dec 2010 ● $300,000 in student fees being combined with state bond match to upgrade the lobby. ● Completion of the project Aug 2011 ● PSU Project Manager, Mark Fujii

  7. Campus Steam & Chilled Water Loop Oregon Economic Stimulus Funded Project $17.5 million ● To improve and expand the network of heating and cooling piping throughout campus that forms our Campus Loop ● Leading to energy savings, more reliable service and increased capacity to heat and cool campus buildings . Estimated energy savings over $300,000 year ● Construction 7:30am - 4:30pm Monday - Friday; Intermittent noise and vibration. 93 jobs created ● Geothermal cooling of a new heat pump and chiller in SB2 ● Federal Grant of $1 M awarded to use more of the heat in the geothermal wells ● Completion of project Summer 2011 ● PSU Project Manager, Mark Fujii

  8. Peter Stott Center Energy Upgrades ● Provide energy upgrades throughout the facility. Upgrades include; HVAC unit maintenance/ replacement, Lighting replacement and door and window weatherization ● Funding provided by American Reinvestment and Recovery Act (ARRA- Fed. Stimulus), Energy Trust of Oregon (ETO), Business Energy Tax Credits (BETC) and PSU ● Anticipated construction: May 2011 – August 2011 ● PSU Project Manager, Kate Vance

  9. Campus Wide Metering Study ● This project was implemented in order to achieve PSU’s metering and energy management goals ● Study provides a inventory of the existing meters on campus and where future meters need to be installed in order to achieve PSU goals ● Goal: All aggregate building utility usage be metered digitally and captured in real time ● Insite group is the project consultant ● Study Completed. Awaiting funding to install meters ● PSU Project Manager, Quinn Soifer

  10. Walk of the Heroines - Phase 2 • Additional Naming Wall • Stage with artistic paving • Art Boulder Hardscape elements • Additional Bench Seating • $370,000 budget of which is partially funded by PSU Students through the Student Building Fee. • Completion May 2011 • PSU Construction Manager, Jennifer Sharp

  11. Potential Projects? • If you have a potential remodeling project in your plans contact our team and we will: • schedule a brief meeting to discuss scope • verify if project is feasible, or work with you to make it feasible • determine best delivery system – PSU crews or outside contractor, or consultant • manage design, permitting and estimating • oversee construction and completion of the project Francis McBride Construction Project Manager 503-725-8944 mcbridef@pdx.edu Ron Blaj Assistant Director Capital Project Management 503-725-4308 rblaj@pdx.edu

  12. Facilities & Planning - Reception 503-725-3738 Questions? Ernest Tipton: tiptone@pdx.edu Ron Blaj: rblaj@pdx.edu Kate Vance kvance@pdx.edu Mark Fujii: fujiim@pdx.edu Jennifer Sharpsharpj@pdx.edu Quinn Soifersoiferq@pdx.edu our website www.fap.pdx.edu

  13. Our Role: Help employees to work safely. Help supervisors provide employees with the information, skills, & tools they need to work safely Help administration to provide a safe workplace Help maintain compliance with environmental health & safety regulations (DEQ, OSHA and others) Environmental Health & Safety

  14. Requesting Service from EH&S: Chemical Spill Emergency: 5-4404 (CPSO) Odor Reports: Call Facilities at 5-3738 Please submit a Work Order for all other service requests, including: - Ergonomic Assessments - Hazardous Waste Pick-Up http://www.fap.pdx.edu/workorder Environmental Health & Safety

  15. Maintenance & Operations • Our team provides the following campus services: • Electrical • HVAC&R • Plumbing • Carpentry • Energy Management • Keys & Lockshop • Grounds Maintenance • Signs & Way Finding Michael McBride Lead Electrician 725-6062 mmcbride@pdx.edu Rick Viaene Chief Building Engineer 503-725-9996 viaene@pdx.edu Gerry Gadberry Assistant Director 503-725-9972 gadberry@pdx.edu Bob Folkerts Building Automation Supervisor 725-9981 rgf@pdx.edu

  16. New telephone number effective May 2nd 725-2FIX(503-725-2349) FAP web page changes coming in early May http://www.pdx.edu/fap Simplified layout Easier to find information & resources Facilities Work Order System