An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WisDOT Implementationof3D Technology & Methods inDesign & Construction 2009 Contractor/Engineer Conference WTBA & WisDOT January 21-22 Jerry H. Zogg, P.E. , WisDOT

  2. 3D Implementation WisDOT has worked on a number of 3D initiatives for several years: • Some were recognized as being directly related to 3D technology • Others were not Hasn’t been much of a coordinated effort

  3. 3D Implementation Recent prominent initiatives: • 3D Design process including selection of Civil 3D as design software • State-of-the-art 3D dynamic modeling capabilities • GPS machine guidance for grading • statewide option for 2009

  4. 3D Implementation • Recently realized need for a more comprehensive/coordinated effort • A number of related & supporting initiatives • Implementing 3D technologies is a national trend • Many engineering & construction benefits • A number of challenges & issues • Have a project underway to develop an overall implementation plan

  5. 3D Implementation Project Participants: • Principle Investigator: • Alan Vonderohe,CMSC • Advisory Group: • WisDOT • WTBA • ACEC • Workshop Attendees

  6. 3D Implementation Conducting Project in 2 Phases: • Phase 1: Preliminary Study (April – Oct 2008) • Phase 2: Develop Prioritized Plan (Nov – April 2009)

  7. 3D Implementation Activities in each Phase: • Develop Vision & Objectives • Perform Research • Prepare Interim Report • Conduct Workshop • Complete Final Report

  8. Phase 1 - Preliminary Study • Title: Implementing Digital Terrain Models (DTM) for Construction Plans & Determining Earthwork Quantities • Vision: Adoption of 3D methods and seamless data flows throughout initial survey, design, contracting, construction, as-built survey, and payment processes. • Objectives: • Identify institutional issues, relevant design and construction work processes, consequences, and legal issues associated with realizing the vision. • Suggest strategies for addressing the issues.

  9. Stakeholder Workshop September 18, 2008 • Workshop Objective: • Provide a forum for participation by the stakeholder community in achieving study objectives. • Breakout sessions: • 3D model content, format, and security. • DTM data collection and data quality. • Impacts, training, and communication. • Implementation planning.

  10. Where We Are And Where We Want To Be Current Future The Vision Goes Even Further

  11. Oct. 22 Adv Group MeetingAgenda & Outcome Agenda • Review Workshop outcomes from Each Breakout Session • Develop recommendations for the final report and determine the path forward. Outcome • Expand the vision statement • Develop a high-level implementation plan

  12. Phase 2 -Implementation Plan3D Technologies & Methods for Design & ConstructionAdvisory Group MeetingsNovember 17, 2008December 17, 2008January 20, 2009

  13. 3D Imp Plan - Phase 2Vision and Scope • Vision: • Adoption of 3D methods and seamless data flows throughout initial survey, design, contracting, construction, as-built survey, payment, and other applications included within the infrastructure lifecycle. • Scope: • Design and constructionalong with identification of links to operations, maintenance, and planning.

  14. 3D Imp Plan - Phase 2 Objectives • Develop a prioritized implementation plan to move WisDOT toward the vision • Focus plan on 3D initiatives within WisDOT • Link Sept Workshop Issues & Outcomes to those initiatives

  15. 3D Imp Plan - Phase 2Adv Group Activities To accomplish Phase 2 Objectives, Adv Group working to initially: • Identify 3D initiatives • Currently underway • New • Determine topics to be addressed with each initiative • Develop other implementation recommendations

  16. 3D Imp Plan – Phase 2 Six Initiatives: • 3D Design Process • Automated Machine Guidance • Height Modernization Project (HMP) & Continuously-Operating Reference Stations (CORS) • Original Ground DTM • Inspection & Final Quantities • Post Construction Uses of 3D As-Builts

  17. 3D DesignProcess

  18. GPS Machine Guidance

  19. Height Modernization Project (HMP) Continuously Operating Reference Stations (CORS)

  20. 3D Imp Plan – Phase 2 Six Initiatives: • 3D Design Process • Automated Machine Guidance • Height Modernization Project (HMP) & Continuously-Operating Reference Stations (CORS) • Original Ground DTM • Inspection & Final Quantities • Post Construction Uses of 3D As-Builts

  21. Implementation Plan Topics to be addressed for each 3D initiative: • Status • Issues • Timeline & Expectations • Level of Effort • Benefits • Relationships with other Initiatives • Recommendations • Short & Long Term Goals • Stakeholders & Responsibilities • Priority

  22. 3D Imp Plan – Phase 2 Recommend creation of Mgmt Task Force to: • Monitor Initiatives & coordinate if necessary • Create reporting structure • Keep upper mgmt informed • Advocate for overall effort • Develop outreach mechanisms for internal & external stakeholders

  23. Stakeholder Workshop February 17, 2009 Objectives: • Obtain feedback on Draft Imp Plan from wide variety of stakeholders • Conduct breakout session on post-construction activities: • Operations • Maintenance • Planning

  24. 3D Imp Plan - Phase 2 Completion • March 18 - Advisory Group Meeting • Review outcomes of 2/17 Workshop • Finalize content of Implementation Plan • March 31 – Complete Final Report • Combine findings: • Phase 1 - Preliminary Study • Phase 2 - Implementation Planning Effort • April - Begin Reporting Out to DTSD Mgmt

  25. Provide Your Input ! • 2/17 Workshop Invitees: Please attend • Others: Please contact Advisory Group • Alan Vonderohe,CMSC • Jessica Lewis, ACEC • Chris Goss, WTBA • Jerry Zogg, BPD • Don Greuel, BPD • Rick Larson, BPD • Brad Hollister, BPD • Kim Schauder, BITS • Cindy McCallum, BITS • Drew Kottke, BITS • Dennis Keyser, NE • Bruce Enke, NE • Allen Gilbertson, SE • Amy Coughlin, SW