Daily operation report Dec.17-18, 2002

Daily operation report Dec.17-18, 2002. Physics group II and operation group II. Outline. Schedule Present systems and plasma state Problems New information. Schedule. 10:30-18:00 rehearsal of study on LHW improving confinement (DBJ)

vina
Download Presentation

Daily operation report Dec.17-18, 2002

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Daily operation report Dec.17-18, 2002 Physics group II and operation group II

  2. Outline • Schedule • Present systems and plasma state • Problems • New information

  3. Schedule 10:30-18:00 rehearsal of study on LHW improving confinement (DBJ) 18:00-21:00 rehearsal of study on LHW improving confinement & coupling efficiency (SWC) 21:00-01:00 vertical displacement scan 01:00- longer LHW, ne scan

  4. Systems & Plasmas (I) 1 Vacuum and limiter temperature inner chamber pressure ~2E-5 Pa Better symmetry of Tlimiter rise by optimized vertical displacement control. deltaTMAX~10-15 degrees for 160kA*1s/250kW*0.3sLHW shots. 2 Cryogenic and toroidal field It~4100A, leak detecting 3 Plasmas: For LHCD exp, mainly 160 kA, 1.5e19m-3. 4 LHW Pmax~300 kW/~270-500 ms

  5. Plasmas (II) deltaT on limiters & vertical displacement control Shot 50032, south upper +10 K south lower +11K North upper +5K north lower +15K

  6. Plasmas (III) ne scanning Similar Current Drive effect with ne above 2e19m-3.

  7. Problems 1, LHW system (phase control); 2, ICRF system (trigger module, generator?) 3, Cryogenic system (He gas leak) 4, Diagnostics

  8. New information Collection of E-notes from every sub-systems. (to YAO Ai Ling) NPA needs time for installation.