20 likes | 92 Views
LIS results presented at 2012 Fall AGU; plan to write up for publication. Three 2” diameter colored Spectralon samples purchased with NIST funds; possible investigation for future LIS-type in air reflectance validation during field work.
E N D
LIS results presented at 2012 Fall AGU; plan to write up for publication. Three 2” diameter colored Spectralon samples purchased with NIST funds; possible investigation for future LIS-type in air reflectance validation during field work. CIMEL SIRCUS data needs to be re-analyzed due to internal background offset. Project funding ended Dec 31, 2012.