320 likes | 438 Views
AKDENİZ HARİTA İNŞAAT SAN. VE TİC. LTD. ŞTİ. Cemalpaşa mah. 5. sk . Karsal Apt. k:1 d:4 seyhan /ADANA Tel: 0322 457 37 31 Fax : 0322 459 84 13. AKDENİZ HARİTA İNŞ. SAN. VE TİC. LTD. ŞTİ. MAINTAINS LEADERSHIP ON ITS SECTOR.
E N D
AKDENİZHARİTA İNŞAAT SAN. VE TİC. LTD. ŞTİ. Cemalpaşa mah. 5. sk. Karsal Apt. k:1 d:4 seyhan/ADANATel: 0322 457 37 31 Fax: 0322 459 84 13
AKDENİZ HARİTA İNŞ. SAN. VE TİC. LTD. ŞTİ. MAINTAINS LEADERSHIP ON ITS SECTOR. • S. Turgay Ardıç, our founding partner of our Company; has made below mentioned a rule when he has started his business life :’ If this job could be made I should do the best’ • Therefore, he had to work too much, had to apply technological innovations. And he managed all these things. He has set his signature on important projects administrations such as Provincial Bank, TKGM, TCK, TEİAŞ, BOTAŞ. He has set his signature on from İzmir to Ardahan without exception regions under responsibility of Akdeniz Harita İnş. San. Ve Tic. Ltd. Şti. • Akdeniz Harita İnş. San. Ve Tic. Ltd. Şti. Has proved that the company can manage works more complicated and greater than projects that company finished and continues by its background, technical power, work experiences, equipment capacity and technical qualified staff.
Company Target • Our company is one of the leadership on project and construction sector, aims to tune in new sectors in homeland by expanding service spectrum and to represent ideally our sector and Country by transferring out present service quality in foreign countries.
WORK MENTALITY • Akdeniz harita İnşaat San ve Tic ltd. şti. that has adopted performing all kinds of works in quality and on due time under company’s responsibility as a principle since company has started on action, has not recognized quality as legal obligation and has adopted as life philosophy. • In this context; • Recognise quality service mentality as a basic value • Protect Company’s reputation, keep away from injurious applications for any reason whatsoever. • Follow the latest technological and occupational developments, provide them for company as soon as possible. • Encourage all staff for being full participant and efficient. • Produce fast, reliable and understandable service. Provide continuous development of our service and quality. • Optimize project management and resource utilization. • Our quality policy that has been formed such as below mentioned has been adopted as COMPANY SPIRIT and LIFE STYLE.
Management Team • Company Director: Ş. Turgay ARDIÇ He graduated from Geodesy and Photogrammetry Engineering , Faculty of Civil Engineering at Istanbul Technical University in 1981. He started his service life in ENKA Construction Company; and he worked as Supervising Engineer Region Directorate of Provincial Bank in Elazığ and then as a Survey Project Group Authority at TAG Motorway in TEKFEN Construction Company and finally has founded Akdeniz Harita İnş. San. Ve Tic. Ltd. Şti. in 1990 and he managed to achieve our company’s present quality by adding innovations to his experiences. • Company Partner: Mustafa Serdar İNANÇ He graduated from Engineering Faculty at Selcuk University in 1991. 2004 yılında şirket ortağı olan M. Serdar İNANÇ has participated company in 2004 and he has served efficiently on finalization of works rapidly, economically and in quality from his participation day forward.
SCOPE OF ACTIVITIES • Our company has produced project, cartography and construction works for various administration and private sector companies by experienced management team, qualified engineer and technician staff, and 20 years experience in our company. By the reason of these properties, the company is the ideal company in its sector. • These are some of scope of activities of Akdeniz Harita İnşaat San. Ve Tic ltd. Şti.: • Transmission Line and Warehouse Project and Construction Works. • Infrastructural Project and Construction Works. • Drawing As-built projects. • Found and Upgrade Triangulation, Levelment Networks • GPS measurement and applications, • Produce base map • Route Maps, Survey projects works ( Road, Power Line, Pipeline, Communication Lines) • Expropriation Plans • Land and Building Lot Arrangements (Drawing and Application of Zoning Plan) • Bathymetric (Hydrographic) Map production • Prepare Cross -Section, Longitudinal Section and Cubage Calculations • Establishments and Activation of Urban Information and Infrastructure Information Systems • Follow construction projects • Geotechnical Report • Environmental Impact Assessment Reports
References • We serve Institutions and Organisations such as below mentioned: • Seyhan County Municipality • Yüreğir County Municipality • Sarıçam County Municipality • Karaisalı Municipality • Sarımazı Municipality • General Directorate of Highways 5th District Office • General Directorate of Provincial Bank • General Directorate of Turkish Oil Pipelines Corporation (Botaş) • General Directorate of Land Registry and Cadastre • General Directorate of Turkish Electricity Transmission Corporation • STFA Construction • Gama Construction • Tekfen Construction • Güriş Construction • Ağaoğlu Construction • Toros Agriculture Corporation • İskenderun Thermal Power Plant • Tekeli Engineering
Completed Works • Some of completed works in the last decade are given below; • 2000 • Adana Potable Water Supply Project and Warehouse Construction Works. • Adana Potable Water Supply Project Transmission Line Pre-tensioned steel Jacketed Concrete Pipeline Excavation Laying Work • Adana Potable Water Supply Project – Urban Network CTP Pipeline Excavation and Laying Work • Transmission Line between Kızıldag Plateau and Karaisalı Centre - Survey, Project, Expropriation and Construction Works • Adana Eastern Waste Water, Western Waste Water Treatment Facility Base Map Work • Adana Potable Water Supply Project – Urban Distribution (Eastern)Network Survey and 2nd and 3rd Stage Expropriation Works • At Sarımazı Municipality 99 hectares field - Alanya Municipality 25th District Zoning Application Works • Provincial Bank- Denizli- Buldan Base Map Work • 2001 • Adana Potable Water Supply Project and Warehouse Construction Works. • Adana Potable Water Supply Project Transmission Line pre-tensioned steel Jacketed Concrete Pipeline Excavation Laying Work • Adana Potable Water Supply Project – Urban Network CTP Pipeline Excavation and Laying Work • Mersin Waste Water Project Survey- Project Works • Adana Potable Water Supply Project – Urban Distribution (Western)Network Survey and Service Road Expropriation • Seyhan District Municipality Zoning Application of numbered 51 Organization Field • Bozüyük-Adapazarı Natural Gas Pipeline Phase II Project Survey- Project-Expropriation – Application and As Built Project and Construction Follow up works
Completed Works • 2002 • Adana Potable Water Supply Project Warehouse Construction Works. • Adana Potable Water Supply Project Transmission Line pre-tensioned steel Jacketed Concrete Pipeline Excavation Laying Work • Adana Potable Water Supply Project – Urban Network CTP Pipeline Excavation and Laying Work • Alanya Municipality 15th District Recycling and Zoning Application work • Mersin Waste Water Project Sea Discharge Hydrographical Map Work • Sarımazı Municipality 190 hectares field Zoning Application Work and • Sarımazı Municipality 1350 hectares field Base Map and Application Zoning plan Work • 2003 • Adana Potable Water Supply Project Warehouse Construction Works. • Adana Potable Water Supply Project Transmission Line pre-tensioned steel Jacketed Concrete Pipeline Excavation Laying Work • Adana Potable Water Supply Project – Urban Network CTP Pipeline Excavation and Laying Work • Afsin-Elbistan Thermal Power Plant “Unit B” Conveyor Route Survey and Project Works • Toros Fertilizer Factory Base Map and Zoning Application Work • İsken Sugözü Thermal Power Plant Coal Stockyards Tons Calculation Work
Completed Works • 2004 • İsken Sugözü Thermal Power Plant Coal Stockyards Tons Calculation Work • Yatağan-Muğla ENH Survey, Project, Expropriation Engineering Service Work • Gölbaşı-Temelli ENH Survey, Project, Expropriation Engineering Service Work • Kuzuculu/HATAY Base Map Work • Hatay Industrial Zone Road, Drainage, Infrastructure Project Works based on Construction • 2005 • İsken Sugözü Thermal Power Plant Coal Stockyards Tons Calculation Work • Alparslan-Hınıs ENH Survey, Project, Expropriation Engineering Service Work • Alparslan-Adilcevaz ENH Survey, Project, Expropriation Engineering Service Work • Yumurtalık Sewerage Survey, Project, Construction Follow up Works • Ardahan-Göle Digital Cadastral Mapping Work (Work Bank) • Yüreğir District Municipality Quarter of Cumhuriyet Road Karataş Zoning Application Work • Yüreğir District Municipality Quarter of Cumhuriyet Road Güney Kuşak -Karataş Zoning Application Work • 2006 • İsken Sugözü Thermal Power Plant Coal Stockyards Tons Calculation Work • Adana-Kozan Digital Cadastral Mapping Work • Adana-Feke Digital Cadastral Mapping Work • Yüreğir District Municipality Quarter of Seyhan Road Güney Kuşak -Karataş Zoning Application Work • Yüreğir District Municipality Quarter of Seyhan 3rd Region Zoning Plan and Application Work • Adana-Karataş State Highway Survey, Project and Expropriation Work • Gaziantep Urban Natural Gas Distribution Network 2nd Stage Survey, Project Work
Completed Works • 2007 • İsken Sugözü Thermal Power Plant Coal Stockyards Tons Calculation Work • Yüreğir District Municipality Quarter of Cumhuriyet Road Karataş Zoning Application Work • Yüreğir District Municipality Quarter of Seyhan Road Karataş Zoning Application Work • Erzurum-Hınıs-Tekman Digital Cadastral Mapping Work (Work Bank) • Belen RES Bas Map Work • 2008 • İsken Sugözü Thermal Power Plant Coal Stockyards Tons Calculation Work • Tunceli-Hozat Digital Cadastral Mapping Work • Bingöl-Karlıova Digital Cadastral Mapping Work • Sarımazı Municipality 1020 hectares field Base Map Work • Ayas Energy Company Infrastructure Works before Construction • Sarımazı Municipality 107 hectares field Renovation Zoning Plan and Application Work • 2009 • İsken Sugözü Thermal Power Plant Coal Stockyards Tons Calculation Work • Ayas Energy Company Infrastructure Works before Construction • Ayas Energy Supervision of Plant Field Excavation Works • Mersin RES-Gezende HES ENH Expropriation Engineering Service Works • Yüreğir District Municipality Quarter of Koprulu Zoning Application Work • Sarımazı Municipality Centre Zoning Application Work • Adana Water- Sewerage Administration – Infrastructure Information System Preperation Work • 2010 • Superonline Adana Drawing Application Projects for Laying Fiber Optic Cables and Following construction works • Ayas Energy Supervision of Plant Field Excavation Works
Work in Progress • Some Work in Progress are given as below: • Yüreğir District Municipality Çamlıbel-Yenidoğan Recycling- Zoning Plan Application Work • Bingöl Municipality 1st and 2nd Region Zoning Plan Application Work • Yüreğir District Municipality Quarter of Seyhan 3rd Region Recycling- Zoning Plan Application Work • Kayseri-Kocasinan 22-A Digital Cadastral Revision Work (World Bank) • Superonline Mersin Drawing Application Projects for Laying Fiber Optic Cables and Following construction works • Province Ordu ENH Expropriation Engineering Service Works • Provincial Bank Giresun / Tirebolu Digital Base Map Work • Provincial Bank Burdur / Çeltikci Digital Base Map Work • Sarıçam District Municipality Lot 11135 –Lot 11142 Zoning Application Work
Certificates for Work Completion and Sample Projects • Samples for completed works of our Company and certificates for work completion are given as below;
GENERAL DİRECTORATE OF TURKİSH OİL PİPELİNES CORPORATİON (BOTAŞ)CORPORATİON OF OİL TRANSPORTATİON BY PİPELİNE
SECTIONS FROM COMPLETED WORKSADANA POTABLE WATER SUPPLY PROJECT
YAPILAN İŞLERDEN KESİTLER ADANA POTABLE WATER SUPPLY PROJECT
SECTIONS FROM COMPLETED WORKSKIZILDAĞ PLATEAU TRANSMISSION LINE PROJECT
SECTIONS FROM COMPLETED WORKSSUGÖZÜ THERMAL PLANT STREAM IMPROVEMENT PROJECT