1 / 26

London City Airport

London City Airport. Bernard Lavelle Sales Director @bernardlavelle. Where are we today?. Days before London City Airport. London City Airport today. The ONLY Airport in London!. London City Airport: Connections. Service Features – 20/10. No queues 20 minute check in

viola
Download Presentation

London City Airport

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. London City Airport Bernard Lavelle Sales Director @bernardlavelle

  2. Where are we today? Days before London City Airport London City Airport today

  3. The ONLY Airport in London!

  4. London City Airport: Connections

  5. Service Features – 20/10 • No queues • 20 minute check in • Easy and quick access to London • Business environment • 10 minutes from plane to taxi • Fastest processing times in Europe • Quick, easy & efficient to get through LCY • Fast track airport – no fuss, no bother, no reason not to use LCY

  6. LCY v LHR/LGW – Typical Cost • Waterloo – LHR/LGW • Tube £4.50 • HEX/GEX £20.00 (£25.00 on board for HEX) • Total £24.50 • Waterloo – LCY • Tube/DLR £4.50 • Difference £20.00 • Assume 20,000 journeys pa • Minimum saving £400,000 Add in time saving on top (c3 hours for a round trip) £ £ £ £ £ £ £ £ £

  7. LCY 2012 • 3.07m passengers in 2012 • 3.2M expectation 2013 • 10 Airlines, 44 destinations • Largest airline by pax & Capacity is BA

  8. Current Operators

  9. Current Route Map

  10. Connecting flight opportunities from LCY Min 24 Destinations Assumes 30 MCT, 90 minute max wait

  11. London City Airport: IOM-LCY History

  12. Chequered History….. • 2000-2004 Jersey European/British European • 2005-2008 Euromanx & VLM (Euromanx stops May’08) • 2009 Aer Arann & VLM (VLM stops July ‘09) • 2010- April 2012 Aer Arann • 2012 June - BA Connection into London & the business & financial district important? Never been a better product!

  13. London City Airport: Into The Future

  14. LCY: City Airport Development Programme (CADP)

  15. LCY: Vision for the Future LCY: a Vision for the Future • Permission granted for 120k movements per annum • A vision of 6 million passengers by 2023 • Development of the airport to provide additional business & leisure destinations • LCY as the gateway to London – as London moves east

  16. Peaks - Optimising Runway Capacity 16 Current configuration – 38 movements per hour Additional entry point – 42 movements per hour Full parallel – c50 movements per hour

  17. London City Airport 2020

  18. East Development: Indicative Visualisations (WIP)

  19. East Development: Indicative Visualisations (WIP)

  20. East Development: Indicative Visualisations (WIP)

  21. London City AirportThank you! London City Airport: Divider2011

More Related