1 / 47

Cost Analysis and Estimating for Engineering and Management

Cost Analysis and Estimating for Engineering and Management. Chapter 9 Cost Analysis. Overview. Making Decisions (Tradeoffs) Cash Flow Effects Variations on Breakeven Analysis Marginal Costs, Revenues, Profits Life Cycle Costs. Tradeoffs. Between/Among Design Alternatives

Download Presentation

Cost Analysis and Estimating for Engineering and Management

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Cost Analysis and Estimatingfor Engineering and Management Chapter 9 Cost Analysis

  2. Overview • Making Decisions (Tradeoffs) • Cash Flow Effects • Variations on Breakeven Analysis • Marginal Costs, Revenues, Profits • Life Cycle Costs

  3. Tradeoffs • Between/Among Design Alternatives • Proceed or Terminate • Make or Buy • Current or Proposed Product/Method • Often Before or During Design

  4. Product Development

  5. Tradeoff Study • Search for Alternatives • Determine Cost Estimates • Use Comparative Economy • Consider Constraints • Understand Irreducible Factors • Make Decisions

  6. Considering Cash Flow • Amount and Timing of Cash • Coming In, From Sales • Going Out, In Expenses • Also • Depreciation • Taxes • Inflation/Deflation

  7. Taxation Effects on Cash Flow • Property Taxes • Fixed, Comparatively Small • Sales Taxes • Part of Material/Equipment Cost • Income Taxes • Federal and Sometimes State

  8. Income Taxes • Proportion of Gross Income • Net Income: • What’s Left After Taxes Paid Eq 9.1

  9. If Income is Between  and The tax is of the Amount Over $ 0 $50,000 15% 0 50,000 75,000 $ 7,500 + 25% 50,000 75,000 100,000 13,750 + 34% 75,000 100,000 335,000 22,500 + 39% 100,000 335,000 10,000,000 113,900 + 34% 335,000 10,000,000 15,000,000 3,400,000 + 35% 10,000,000 15,000,000 18,333,333 5,150,000 + 38% 15,000,000 18,333,333 …. 6,416,667 + 35% 0 Graduated Tax Schedule

  10. Inflation/Deflation • “Value” of Dollar Changes • Purchasing Power • Quantized Through Indices • For Comparisons Over Long Times Eq 9.3

  11. Calculating Cash Flow • Usually for Annual Basis • Only for Top/High Level • Mathematically: Eq 9.4

  12. Breakeven • How Many Must Be Sold to Recover Costs • Relationship • Cost • Price • Volume • Profit

  13. Linear Cost Case • Fixed Cost Is Constant for Period • Does Not Change with Quantity • Variable Cost Is Linear • Constant per Unit Cost • No Production, No Variable Cost

  14. Calculations • Total Cost • Cost per Unit • Total Revenue Eq 9.6 Eq 9.7 Eq 9.8

  15. Breakeven Point • For Linear Variable Cost • Higher Quantities Reduce Fixed Cost per Unit Eq 9.9

  16. Breakeven Chart

  17. Per Unit Chart

  18. Linear Comparisons • Breakeven Process Can Be Used to Compare Alternatives • Between Two Processes (Isocost Point) • Make-or-Buy • Reducing Material Costs • Tax Effects

  19. Process Comparison

  20. Make or Buy

  21. Material Cost Reduction

  22. Tax Effects

  23. Semi-Fixed Costs • Cost Changes In Steps • Changes Infrequent During Scope • Examples • Add Another Shift • Add Another Machine/Line • Total Cost Eq 9.10

  24. Semi-Fixed Cost Chart

  25. Semi-Fixed per Unit Chart

  26. Nonlinear Cost • Per Unit Variable Cost Is Not Constant • Per Unit Revenue May Also Vary • Add Nonlinear Variable and Fixed Costs • Divide By Number of Units to Get Average Unit Cost

  27. Units Cf nCv CT CT/n 0 $4,000 $4,000 1 4,000 $800 4,800 $4,800 2 4,000 1,120 5,120 2,560 3 4,000 1,340 5,340 1,780 4 4,000 1,600 5,600 1,400 5 4,000 1,900 5,900 1,180 6 4,000 2,520 6,520 1,087 7 4,000 3,520 7,520 1,074 8 4,000 4,800 8,800 1,100 Cost Schedule

  28. Marginal Cost, Revenue, Profit • Associated with an Additional Unit of Production • Can Be Nonlinear • Marginal Cost = CT / n • Marginal Revenue = RT / n • Marginal Profit = RT / n - CT / n

  29. n Marginal Cost Marginal Revenue Marginal Profit 0 1 $800 $2,000 $1,200 2 320 2,000 1,680 3 220 2,000 1,780 4 260 1,800 1,540 5 300 1,500 1,200 6 620 1,200 580 7 1,000 1,100 100 8 1,280 1,100 (180) Product Analysis

  30. Total Revenue and Cost

  31. Marginal Plots

  32. Revised Breakeven Analysis • Find Linear Approximation for Revenue Data • Regression Analysis • Breakeven Eq 9.11 Eq 9.13

  33. Linear Breakeven

  34. Higher Order Solutions • To Fit Some Data Higher Order Polynomial Regression Is Needed • Marginal Cost/Revenue Determined Using Derivation of Regressed Models Eq 9.14 Eq 9.15

  35. Nonlinear Cost & Revenue

  36. Marginal Plots

  37. Consequences • Minimum & Maximum Production Limits • Marginal Profit = Zero • Optimum • Sales Revenue, Production Cost, Profit • But Not All at the Same Point Eq 9.17

  38. Life Cycle Cost • Considers Costs for Entire Life • Production / Acquisition • Operation • Maintenance / Upkeep • Salvage Value / Disposal • Recycling • Sum of All Costs from Concept Forward

  39. LCC Use • Used for Comparing Alternatives • Initial Cost and Operating /Use Cost • For Example • High Cost, Reliable Item • Low Cost, More Repair / Replacement • Pay Now or Pay Later

  40. Estimates Required for LCC • Design • Capital Investment • Operation, Maintenance, Use • Replacement • Upgrading • Salvage

  41. Phases of Project Life

  42. End of Life • Worn Out • Ceases Function • Loss of Profit • Costs Too Much to Continue Operation • Obsolete • Purpose No Longer Exists • Superior Replacement Available

  43. Operating & Maintenance Costs • Need • Operating Profile • Maintenance Schedule • Repair Data • Scheduled Maintenance (Preventative) Eq 9.18

  44. Breakdown Costs • Mean Time Between Failure (MTBF) • Mean Time to Repair (MTTR) Eq 9.19

  45. LCC Comparison

  46. Long Life Costs • Life in Multiple Years • Interest Rate Considerations • Time Value of Money • $1 in 5 Years Is Worth Less Today • Impacts LCC Calculations • Covered In Chapter 10

  47. Summary • Methods for Making Tradeoff Decisions • Considerations Involving Cash Flow • More Complicated Breakeven Models • Marginal Costs, etc. • Limits on Production • Costs for Entire Life Cycle

More Related