1 / 8

STF430 Final Report Summary

STF430 Final Report Summary. Gyorgy Rethy STF Leader. Project details. 7 ETSI member supported the STF 2011.04.19 –2011.12.31 (78 mDays, all used up) Members: Gyorgy Rethy , Ericsson Jens Grabowski, University of Goettingen Ina Schieferdecker, Fraunhofer FOKUS Jacob Wieland, TestingTech

vivi
Download Presentation

STF430 Final Report Summary

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. STF430 Final ReportSummary Gyorgy Rethy STF Leader

  2. Project details • 7 ETSI member supported the STF • 2011.04.19 –2011.12.31 (78 mDays, all used up) • Members: • Gyorgy Rethy, Ericsson • Jens Grabowski, University of Goettingen • Ina Schieferdecker, Fraunhofer FOKUS • Jacob Wieland, TestingTech • Sessions • 24–27 May 2011 • 27 June–01 July 2010 • 26–30 September 2010 • 28 November–02 December 2010

  3. Scope - 1 Maintenance and new features,existing standards, ES 201 873 TTCN-3 Part-1: Core Language V4.3.1 TTCN-3 Part-4: Operational Semantics V4.2.1 TTCN-3 Part-5: TTCN-3 Runtime Interface V4.3.1 TTCN-3 Part-6: TTCN-3 Control Interface V4.3.1 TTCN-3 Part-7: Using ASN.1 with TTCN-3 V4.3.1 TTCN-3 Part-8: Using IDL with TTCN-3 V4.3.1 TTCN-3 Part-9: Using XML with TTCN-3 V4.3.1 TTCN-3 Part-10: TTCN-3 source code doc. V4.3.1

  4. Scope - 2 Maintenance and new features,existing extension packages ES 202 781 TTCN-3 Extension: Configuration and deployment V1.1.1 ES 202 782 TTCN-3 Extension: Real-Time and Performance Testing V1.1.1 ES 202 784 TTCN-3 Extension: Advanced Parameterization V1.2.1 ES 202 785 TTCN-3 Extension: Behaviour Types V1.2.1 New Extension packages TTCN-3 extension: Continuous Signal support TTCN-3 extension: Advanced TRI

  5. Interim version TTCN-3 Part-1: Core Language V4.3.2 24 CRs resolved and included See list of CRs in TD MTS(11)0056 TTCN-3 Part-9: Using XML with TTCN-3 V4.3.2 9 CRs resolved and included See list of CRs in TD MTS(11)0056

  6. Final deliverables -1 ES 201 873 TTCN-3 Part-1: Core Language V4.4.1 46 CRs resolved and implemented (in addition to the interim version) TTCN-3 Part-4: Operational Semantics V4.4.1 no “own” CR, synchronization with the other parts TTCN-3 Part-5: TTCN-3 Runtime Interface V4.4.1 2 CRs resolved and implemented TTCN-3 Part-6: TTCN-3 Control Interface V4.4.1 8 CRs resolved and implemented TTCN-3 Part-7: Using ASN.1 with TTCN-3 V4.4.1 1 CR resolved and implemented TTCN-3 Part-8: Using IDL with TTCN-3 V4.4.1 2 CRs resolved and implemented TTCN-3 Part-9: Using XML with TTCN-3 V4.4.1 12 CRs resolved and implemented (in addition to the interim version) TTCN-3 Part-10: TTCN-3 source code doc. V4.4.1 1 CR resolved and implemented All parts have been delivered, AbC introduced on 19th Dec. 2011 See detailed CR list at http://t-ort.etsi.org/view_all_bug_page.php

  7. Final deliverables -2 Existing extension packages TTCN-3 Extension: Configuration and deployment No CR resolved (1 CR pending) TTCN-3 Extension: Real-Time and Performance Testing No CR received TTCN-3 Extension: Advanced Parameterization No CR resolved (1 CR pending) TTCN-3 Extension: Behaviour Types No CR received New extension packages TTCN-3 extension: Continuous Signal support Delivered (TD MTS(12)000001) TTCN-3 extension: Advanced TRI Delivered (TD MTS(12)000002)

  8. Other TTCN-3 User Conference Presentation has been held at the TTCN-3 User Conference 2011 in Bled („ TTCN-3 Language Maintenance and Evolution“) 3GPP During its sessions, STF430 has participated on STF160‘s regular phone meetings with TTCN-3 tool vendors Continous contact and discussions via e-mail and direct phone calls with STF 160‘s experts TB MTS The STF‘s work progres was reported on MTS#54, 04-05 October 2011, Tallin (TD MTS(11)0055) STF work (list of resolved and progressed CRs) is sent on the MTS-GEN mailing list

More Related