An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 25’ – 0” N Rack 1: 55’ – 9” ~ 37 ‘ – 0” Existing Peacekeeper Storage Rack 2: 46’ – 6” ~ 27 ‘ – 0” Rack 3: 55’ – 9” Judy Clarke – 66750 or Lisa Kramer - 67599 Rack 4: 55’ – 9” Rack 5: 55’ – 9” S.P.A.C.E Weld Sample Prep Existing Eye Wash and Battery Charger – Relocate per new layout L.. Gumms or S. Parry – Space 502 or F. Eastman Remove Existing Chain-Link Fence Breakdown 20 Ft. High Racks, Palletize and Relocate to Canoga Park, B001.- Racks 1,2, 3, 4 & 5 • Remove chain-link fence from behind Rack 1 • Disconnect Fire Lines Back to Nearest Valve or Cap 24’ – 0” B106 & B131 Layout and Requirements

  2. N RemStar RemStar P P FC F F Raymond & Incoming C C C C C C Scooter Loading Zone CH C WB WB WB WB WB WB WB C Visual Visual Visual Visual Kitting C Work Table 4’ x 8’ 4’ x 8’ C-Table Shear Work Area Foot Print Shear Ht = 7’ 2” c Break 11’ x 3’ WT 2 - 9 ft. Bays = 18’ – 9” p MCC 6’ x 8’ Cubicle c 5’ x 12’ Table WT 8’ x 12’ Office C Kitting Break 7’ x 3’ SW G TB TB TB TB C Rack 6 Rack 7 Rack 8 3 – 9 ft. bays = 28’- 0” Rack 9 c 30” x 60” Work Table P Cart WT 4 ft. sq. Pallet CH 24” x 48” Chemical C 24” x 48” Cabinet 24” sq. Cabinet 12” x 36” Racks / Shelves SW Spot Welder TB 24” x 48” Tool Box 24” sq. Printer Computer p C Fire Cabinet FC 24” x 60” Cabinet Computer, Provide Wall Counter Top 30” x 60” Work Bench & Chair C G Grinder B106 & B131 Layout and Requirements

  3. N RemStar RemStar P P FC F F Raymond & Incoming C C C C C C Scooter Loading Zone CH C WB WB WB WB WB WB C Visual Visual Visual Visual Kitting C Work Table 4’ x 8’ 4’ x 8’ C-Table Shear Work Area Foot Print Shear Ht = 7’ 2” c Break 11’ x 3’ WT 2 - 9 ft. Bays = 18’ – 9” p MCC Cubicle c 5’ x 12’ Table WT Office C Kitting Break 7’ x 3’ SW G TB TB TB TB A A C Rack 6 Rack 7 Rack 8 3 – 9 ft. bays = 28’- 0” Rack 9 110 V Receptacle IT/ DATA / Telephone Receptacle Air – Provide Wall Mounted Reel, Air Line Shall Reach center of 5’ x 12’ Table A B106 & B131 Layout and Requirements

  4. N 2 - 9 ft. Bays = 18’ – 9” WT WT Rack 6 Rack 7 Rack 8 3 – 9 ft. bays = 28’- 0” Rack 9 • Relocated Racks - Same height x 4-shelves • Maintenance Side – 2 bays • Warehouse Side – 3 bays • 36” x 6’ Relocated WT • IT/Data/Electrical F 15” w x 2’ d File S F • Sealer - Relocated • Electrical 1-hour wall construction – Metal Stud/Gypsum wall B S • Battery Charger - Relocated • Electrical E B • Doors • Coil door – 25 ft w x • Configured per PWR Standard • RL Personnel Door – 3’ x 7’ • Solid Core Door • 20 Min. • Door closure • Key Swipe Splash Barrier - Relocated Eye Wash - Relocated E B106 & B131 Layout and Requirements

  5. (E) Building 131 Floor Plan ~136’ – 0” ~6’ ~31– 7” \ ~15 – 10” ~18’ – 1” ~50’ – 9” ~21– 7” ~9’ – 9” ~31 – 10.8” ~7 –9.5” Chain Fence Face to Face Face to Face 3’ – 4” 3’ – 0” 6 5 4 3 2 1 ~16 – 4” 5” – 0” • < 8 ft. clear space to eave 6” CMU 12” CMU 4” T plaster wall 3’ – 7” • Electrical • Light fixtures, tubes, cover plates, disconnects, etc. • 6 Lista / 9 drawers • 5 Cabinets • 2 – 11’ x 3 shelf racks • 1 Fridge (batteries) • Bruce Bertea • 2 - 3 shelf racks • Storage 1 3 Remove all building contents and locate within roadway between B113 and B131, block both ends of roadway to traffic. Contents will be assessed and reduced by PWR Maintenance Contractor shall reinstall per layout into B131 • Explosives • 4 steel vaults • 1 cabinet (smaller room) • Humidifiers (smaller room) 4 2 • Plumber • 1 Pipe cutter • 1 Lista / 5 drawers • 4 Cabinets • 1 - 3 shelf rack (pipes) • Dowling • Misc. Cabinets / Rack 5 • Brian Nakasone • D911 (Misc. Cabinets 6 1 spc = 1.41666 ft. B106 & B131 Layout and Requirements

  6. N (E) Building 131 Equipment Layout 4 3 2 1 F 48’w x 24”d x 77.5”h gun safe 25.5” x 40”” U-cart 16.5’L x 4’w x 6’h x 3 s rack 36”w x 24”d x 72”h cab 23”w x 45”d pipe threader 39”w x 38.5”d x 37.5”h Lista 45”w x 22”d x 48”h rolling cart 42”w x 105”L x 97”h x 4 s rack 32”w x 20”d x 41”h Ki rolling cart Tri-pod – pipe cutter 48”w x 24”d Greenlee cart 12” x 12” benders container 84”L x 30”d x 37.5”h table with end rolling Listas 28” x 27”d x 65.5”h Fridge - Batteries 60”w x 48”d x 54”h blast cab Tricycle 64”w x 32”d rolling cart F Hum & De-Hums 72”L x24”d x 58.5”h x 3s rack 28” x 28” x 59.5”h Lista 36”w x 20”d x 60”h cab 38”w x 24”d x 72”h cab 18” x 36.5” U-cart 36”w x 18”d x 60”h cab 30”w x 72”L x 42”h table with end 28”w Lista cab Min Door Ht. Clear =86.5”, 94”, 97.5” South to North 2011.04.19 1 Spc. = 1 ft. 36”w x 24”d x 78”h cab

  7. N New Building 131 Equipment Layout Future 9’L Rack WB 8 ft. Lamps & Fixtures Conduit & Pipe Wire & Conduit 9’6” Rack 9’4” Rack Lay Down Insulation & Filters & Tiles Future 9’L Rack 18’6” Rack 48’w x 24”d x 77.5”h gun safe 16.5’L x 4’w x 6’h x 3 s rack 36”w x 24”d x 72”h cab 110 V Receptacle – 4 plug IT/ DATA / Telephone Receptacle 39”w x 38.5”d x 37.5”h Lista 45”w x 22”d x 48”h rolling cart 60”w x 48”d x 54”h blast cab 24” x 48” Heavy Duty Cabinets (1 ea. – E ) 30”w x 72”L x 42”h table with end 28”w Lista cab 84”L x 30”d x 37.5”h table with end rolling listas 24” x 60” Heavy Duty Cabinets (4 ea. – E ) 18” x 36.5” U-cart 25.5” x 40”” U-cart 32”w x 20”d x 41”h Ki rolling cart Heat / Conditioned Air Wall Unit Tricycle 23”w x 45”d pipe threader 12”d x 3’L storage racks Future Fridge – short unit Work Bench Tri-pod – pipe cutter WB Min Door Ht. Clear =86.5”, 94”, 97.5” South to North B106 & B131 Layout and Requirements 1 Spc. = 1 ft.

  8. Building 131 Floor Plan - Doors ~136’ – 0” ~6’ ~31– 7” \ ~15 – 10” ~18’ – 1” ~50’ – 9” ~21– 7” ~9’ – 9” ~31 – 10.8” ~7 –9.5” New 6 ft high Chain Fence Face to Face Face to Face 3’ – 4” 3’ – 0” 4 3 6 5 2 1 ~16 – 4” 5” – 0” 4” T plaster wall Exist . 6” CMU 3’ – 7” Exist. 12” CMU • New 3’ x 7’ double doors with view panel • Cane bolt on inactive leaf • Weather Stripping • Passage set • New 3’ x 7’double doors with view panel • Cane bolt on inactive leaf • Weather Stripping • Lock set 4 1 • Replace Existing door with same size. • Provide view panel • Provide Lockset • Weather Stripping • New 3’ x 7’double doors with view panel • Cane bolt on inactive leaf • Weather Stripping • Passage set 5 2 • Replace Existing door (2) with same size. • Provide view panel • Provide Lockset • Weather Stripping • New 3’ x 7’double doors with view panel • Cane bolt on inactive leaf • Weather Stripping • Passage set 6 3 • < 8 ft. clear space to eave 1 spc = 1.41666 ft. B106 & B131 Layout and Requirements

  9. B106 Existing Locker Area B106 & B131 Layout and Requirements