Queanbeyan Road Network Improvements 2031 • Background • Existing traffic issues in Monaro St and various other roads in Queanbeyan
Queanbeyan Road Network Improvements 2031 • Background • Existing traffic issues in Monaro St and various other roads in Queanbeyan • Queanbeyan Residential and Economic Strategy 2031
Endorsed Queanbeyan Residential and Economic Strategy 2031 (December 2008) • Amended Strategy to consider the revised Canberra Airport ANEF
Queanbeyan Road Network Improvements 2031 • Background • Existing traffic issues in Monaro St and various other roads in Queanbeyan • Queanbeyan Residential and Economic Strategy 2031 • Googong and Tralee development proposals • The need for a detailed traffic strategy for Queanbeyan Council to present to State and Federal governments
Queanbeyan Road Network Improvements 2031 • Council engaged Gabites Porter who are a well respected international specialist transport planning and engineering firm. • The Roads and Traffic Authority recommended that Council use Gabites Porter to prepare the Strategic Traffic Plan. • The Strategic Traffic Plan is a technical report that applies traffic engineering principles via a model that predicts traffic behaviour and traffic volumes into the future. • Evaluates options on their ability to meet a predetermined level of service. This method was supported by the Roads and Traffic Authority. • Uses traffic and land use data provided from ACT Government • Uses traffic and land use data from Queanbeyan City Council • Uses development schedules that have been provided by developers
2006 Full Model Content • 134,652 Households • 192,318 Employees • 211,049 Vehicles • 183,255 Total Jobs • 22,401 Retail • 22.378 Financial • 20,083 Community • 22,765 Manufacturing • 95,822 Other
2006 Queanbeyan Content • 14,131 Households • 19,072 Employees • 22,365 Vehicles • 9,610 Total Jobs • 2,120 Retail • 1,848 Financial • 1,658 Community • 2,532 Manufacturing • 1,422 Other
Queanbeyan Road Network Improvements 2031 Current Queanbeyan Level Of Service
KEY =LOS F =LOS E =LOS D =LOS C 2006 AM Link LOS
KEY =LOS F =LOS E =LOS D =LOS C 2006 PM Link LOS
Queanbeyan Road Network Improvements 2031 What would happen if there were no road improvements and all known development was permitted?
KEY =LOS F =LOS E =LOS D 2031 AM Peak Do-Nothing
KEY =LOS F =LOS E =LOS D 2031 PM Peak Do-Nothing
Queanbeyan Road Network Improvements 2031 2031 Future Situation
KEY =LOS F =LOS E =LOS D =LOS C 2031 AM Base LOS
KEY =LOS F =LOS E =LOS D =LOS C 2031 PM Base LOS
Queanbeyan Road Network Improvements 2031 Options Considered
2031 Option 01 TS 4 Lane 2 Lane
KEY =LOS F =LOS E =LOS D =LOS C 2031 AM Base LOS
KEY =LOS F =LOS E =LOS D =LOS C 2031 AM Option 01 LOS
KEY =LOS F =LOS E =LOS D =LOS C 2031 PM Base LOS
KEY =LOS F =LOS E =LOS D =LOS C 2031 PM Option 01 LOS
2031 Option 02 (No Ellerton Drive Ext) 4 Lane New Link
KEY =LOS F =LOS E =LOS D =LOS C 2031 AM Base LOS
KEY =LOS F =LOS E =LOS D =LOS C 2031 AM Option 02 LOS
KEY =LOS F =LOS E =LOS D =LOS C 2031 PM Base LOS
KEY =LOS F =LOS E =LOS D =LOS C 2031 PM Option 02 LOS
2031 Option 04 (Northern Bypass Only) 4 Lane New Link
Traffic Signals New Link 4 Lanes 2031 Option 03
Traffic Signals New Link 4 Lanes 2031 Option Base + 2Lanes DCR
Traffic Signals New Link 4 Lanes 2031 Option 05
KEY =LOS F =LOS E =LOS D 2031 AM 05 Improved LOS
KEY =LOS F =LOS E =LOS D 2031 PM 05 Improved LOS
Queanbeyan Road Network Improvements 2031 2031 Proposal: • Construct Edwin Land Parkway 2 Lanes • Construct Old Cooma Road 4 Lanes • Construct Ellerton Drive 2 Lanes • 13 Intersection Improvements Beyond 2031 • Construct Dunns Creek Road 2 Lanes • Construct Northern By-Pass 2 Lanes
Queanbeyan Road Network Improvements 2031 Developer Contributions
Queanbeyan Road Network Improvements 2031 • Developmental Growth • Googong Development (GOG) • South Jerrabomberra Development (SJ) • HQJOC (HQJ) • All other development (DEV) • Other Queanbeyan Road Users (QUE)