60 likes | 150 Views
CSC operation news. M. Ignatenko UCLA group meeting CERN February 18, 2014. HV, LV and skew clear cables for ME-42 chambers installed. The last VME-4/4 crate cabled with skew clear cables. RPC gas tubes prevented us from finishing cable installation. ME+11 problems.
E N D
CSC operation news M. Ignatenko UCLA group meeting CERN February 18, 2014
HV, LV and skew clear cables for ME-42 chambers installed The last VME-4/4 crate cabled with skew clear cables RPC gas tubes prevented us from finishing cable installation
ME+11 problems • ME+1/1/08 – swapped skew clear cables (fixed) • ME+1/1/20 - swapped PPIB cables (fixed) • ME+1/1/35 - LV terminal block problem (fixed) • ME+1/1/26 – bad skew clear cables (replaced) • ME+1/1/04 – missing 5.5 V for DCFEB 5 (not confirm on the surface). • ME+1/1/22 – no ALCTtx/rx working area • ME+1/1/33 – no ALCTtx/rx working area, no data from DCFEB7 (some ALCT problems seen on the surface, but DCFEB7 problem has not been confirm)
Near operation tasks • Time in the readout of ME+42 chambers with 1000219 PC config. • Take a long CR run (or a few runs) with 4 stations of +Z endcap (without ME+11). • Repeat test of all installed ME+11. • Start ME+11 LTT (6 chambers). • New MPC test (CR local runs). • As soon as LV and HV are ready on –Z endcapstart operating station -2 and -3 (include these station in the local runs).
2014 DOC volunteers • AmithabhShrinivas UC Riverside experienced shifters • Pieter Everaerts UCLA • SenkaDuric UW • Jesse Heilman UC Riverside • Indara Suarez TAMU • Jessica Brinson OSU • Kennedy Elizabeth UC Riverside • Devin Taylor UW • David Morse NU • Xiaofeng Yang UCLA • Jay Hauser UCLA • Eric Takasugi UCLA (yes before August, ? after)