1 / 25

Jordan, March 2012

RENEWABLE ENERGY DEVELOPMENT IN TUNISIA Moncef HARRABI. Jordan, March 2012. Tunisian Energy Context. The Tunisian Energy Context is characterized by : High growing in international oil price. Limited potential of national hydrocarbon resources. Rapid increase in energy demand.

vlora
Download Presentation

Jordan, March 2012

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. RENEWABLE ENERGY DEVELOPMENT IN TUNISIA Moncef HARRABI Jordan, March 2012

  2. Tunisian Energy Context • The Tunisian Energy Context is characterized by : • High growing in international oil price. • Limited potential of national hydrocarbon resources. • Rapid increase in energy demand. • Annual energy subsidy increase.

  3. Tunisian Energy Context Installed capacity The distribution of the 3% RE Based power capacity is as follows Gas share in Electricity production is 98%

  4. Tunisian Energy Context 1.Institutional framework A- Organisation and Regulation Main institutions : MIT / STEG, STEG ER, ANME, ... Supervision :The Ministry of Industry and Trade is responsible for the supervision of : - Energy policy : Hydrocarbons, electricity and RE. • - Regulation : by laws and decrees. • Tariffs. • Electricity sector : • Liberalisation of electricity production (1996). • STEG : monopoly of Electricity and Gas Transport and Distribution.

  5. Tunisian Energy Context Institutional framework • B- SpecificRegulation framework for Renewable • Objectives : Allow electricity production from renewable energies and access to the grid. • Main features of Energy Conservation law (February 2009) : • Residential, tertiary and industrial sectors. • Exclusivity sale to STEG. • Limited to 30% of electricity production exceed. • Tariffs : STEG sales Tariffs • Role of STEG : • Connect private installation when fulfilling technical conditions . • Transport electricity to consumption point.

  6. Present situation of RE 3.RE Development Strategy • Tunisia has invested a great effort in the development of energy conservation and RE, by installing specific financing scheme and laws for RE and EE and creating research center dedicated to RE, in order to : • Diversify the means of power generation. • Reduce fuel consumption and CO2 emissions. • Introduce new technologies. • Open new perspectives for the integration of new sectors in the local industry. • Develop regional and international cooperation. • Introduction of renewable energy must take into account stability and reliability of the national grid.

  7. Present situation of RE 4.Solar Resources In Tunisia Important Solar Potential Solar radiation varies from 1 800 kWh/m²/year North 2 600 kWh/m²/year South

  8. PRESENT SITUATION OF RE Wind ATLAS Good wind potential Wind speed (m/s)

  9. Present situation of RE 5.Wind Energy Sidi Daoud Wind farm : Installed capacity 54 MW  (11 MW in 2000, 9 MW in 2003 and 34 MW in 2009) Integration RE rate in installed capacity varies from 0.4 in 2000 to 1.7 % in 2010 Sidi Daoud

  10. Present situation of RE 6.Wind energy Bizerte Wind farm Stage A 120 MW : has just started in the last days ( February 2012). Kechabta Metline

  11. Present situation of RE 7.SOLAR ENERGY Rural Electrification and pump stations • 13 000 households, 200 rural schools, • 90 pump stations of drinking water.

  12. Present situation of RE SOLAR ENERGY Prosol Elec Project (Roof top) • Project :1 000 Solar Buildings. • Achievements : 1700 kWp in 2011.

  13. Present situation of RE SOLAR ENERGY • Prosol Elec Project (Roof top) • Financial mechanism • Customer : 10% initial investment, • STEG : Inverter, • FNME : 30%, • MEDREC :10%, • Credit Bank : 30 % Easy payment of a credit without interest through electricity bill

  14. Present situation of RE 8.SolarWater Heating Prosol Thermique Total installed surface in 2012 is estimated to be 700 000 m2

  15. Present situation of RE Solar Water Heating • INCITATIVES MEASURES • Allocation, by FNME, of direct subsidy covering 20% of the SWH price : with a limit of : • 200 DT for 200 liters capacity; • 400 DT for 300 liters and more SWH capacity. • Credit sale over 5 years, with a covering of 30 bimonthly deadlines, through the STEG invoice , • STEG guarantee credit recovery,

  16. Present situation of RE 9.industrial integration • Solar EnergyCreation of a Tunisian company specialized in the manufacture of solar photovoltaic modules “NR-SOL” : • Production capacity: 25 MWp per year. • Target market: Tunisia, Europe and Africa. • Wind Energy • Tunisian company “SOCOMENIN Wind Towers”specialized in the fabrication of tubular towers for the main wind turbine manufactures. • Production capacity: 150 towers per year.

  17. RE Project Development 1.Wind energy Bizerte Wind farm stage B 70 MW under construction, start up : the end 2012 Total capacity in Bizerte Farm will reach 190 MW Energy production : 600 GWh/year Kechabta Metline

  18. RE Project DevelopmentWind energy • End 2012 • Total Installed Capacity in Tunisia : 244 MW. • Integration ratio of RE : • Installed capacity : 7 %. • Energy production: 5.5 %.

  19. RE Project Development 2.Solar energy Rooftops • Period : 2012 – 2016. • Planned capacity : 13 MW. • Energy produced : 23 GWh/year.

  20. RE Project Development Solar energy PV Power Plant 10 MW Planned to be in operation in 2014.

  21. RE Project Development Solar energy • CSP Power Plant • Planned capacity : 50 MW • Planned to be in operation in 2016-2017.

  22. RE Project Development 3.Hydro power • Pumped-Storage System : STEP • Planned capacity : 400 - 500 MW. • Feasibility study contract was signed 10 days ago. • Planned to be in operation in 2018.

  23. RENEWABLE ENERGYPERSPECTIVES THE TUNISIAN SOLAR PLAN -2016- 40 projects including RE projects and Energy Efficiency initiatives. Total investment : 2300 M€. Total reduction of national energy consumption : 22%. The share of renewable energies in the total capacity is planned to be 16 % in 2016. RE project represent 71% of the total TSP. EnergyEfficiency15% Support and assistance RenewableEnergy

  24. Renewable Energy Perspectives Target of TunisianSolar Plan • Renewable Power Production : 1 000 MW in 2016 • 4 700 MW in 2030 Wind Solar Others

  25. Thank you for your attentionwww.steg.com.tnmharrabi@steg.com.tn

More Related