E N D
Example • A wide and long rectangular channel having a bottom slope of connects lakes and . Assume the channel is concrete-lined with and the channel bottom at Lake entrance is at . Plot the delivery curve for the channel if the water level in Lake is constant at and the water level in Lake is variable. (Start with trail discharge of )