E N D
1.
2. Forest & Woodland Cost Share Opportunities in Iowa Greg Heidebrink
Assistant District Forester
Iowa Department of Natural Resources
3. Cost Sharing Programs Resource Enhancement And Protection (REAP)
Conservation Reserve Program (CRP)
Environmental Quality Incentives Program (EQIP)
Wildlife Habitat Incentive Program (WHIP)
Forest & Fruit Tree Reserve Act (Forest Reserve)
4. REAP State of Iowa Program
Administered through your local Soil and Water Conservation District (SWCD).
75% Cost Sharing
Must be an agricultural producer
Practices
Timber Stand Improvement (TSI)
Tree Planting
Fencing
Windbreaks
5. Timber Stand Improvement (TSI) Crop Tree Release-
5 acre minimum
Cost share rate is 75% of the total cost not to exceed $75 per acre ($100 total cost).
Site Preparation for Natural regeneration (Weed Tree removal)-
3 acre minimum
Cost share rate is 75% of the total cost not to exceed $120 per acre ($160 total cost).
6. Tree Planting Row Planting or Direct Seeding
3 acre minimum
Cost share rate is 75% of the total cost not to exceed $365 per acre ($486 total cost).
7. Fencing Interior fencing only
Cost share rate is $8 per rod or $45 per acre protected, whichever is less.
8. Windbreaks Check with your local county for any changes to these rates.
Maximum of $1200 per windbreak total cost.
Maximum of $12 per tree.
9. Maintenance Agreement REAP comes with a 20 year maintenance agreement.
Maintain practice for 20 years
No grazing
No building
Stays with the property if it is sold.
10. How do I apply? 1. Contact your District Forester.
2. Sign up for REAP at your local Soil and Water Conservation District (SWCD).
3. Once you have been approved, line up a forestry contractor to complete the work.
4. After project has been completed, turn in all your bills to the SWCD.
11. CRP Federal Cost Sharing Program
Administered through your local Farm Services Agency (FSA)
50% to 90% Cost Sharing
Annual Rental Payments
Practices
Tree Planting
Fencing
Windbreaks
12. FIELD WINDBREAK CP5A
13. FIELD WINDBREAK CP5A CONTRACT LENGTH 10-15 YRS.
ADDITIONAL INCENTIVE 20%
SIGNING INCENTIVE - $100 PER AC.
MAINTENANCE - $4-6 PER AC.
MINIMUM 2 ROWS
MAXIMUM 8 ROWS
14. SHELTERBELT ESTABLISHMENT CP16A
15. SHELTERBELT ESTABLISHMENT CP16A CONTRACT LENGTH 10-15 YEARS
SIGNING INCENTIVE - $100 PER AC.
MAINTENANCE - $4-6 PER AC.
MINIMUM 3 ROWS
MAXIMUM 8 ROWS
16. LIVING SNOW FENCES CP17A
17. LIVING SNOW FENCES CONTRACT LENGTH 10-15 YEARS
SIGNING INCENTIVE - $100 PER AC.
MAINTENANCE - $4-6 PER AC.
MINIMUM 1 ROW
MAXIMUM 3 ROWS
18. RIPARIAN BUFFER CP22CROPLAND
19. RIPARIAN BUFFER CP22 CONTRACT LENGTH 10-15 YRS.
ADDITIONAL INCENTIVE 20%
SIGNING INCENTIVE - $100 PER AC.
MAINTENANCE - $6, $8, $9 PER AC.
MINIMUM WIDTH 35 FT.
MAXIMUM WIDTH 180 FT.
20. RIPARIAN BUFFER CP22MARGINAL PASTURE
21. RIPARIAN BUFFER CP22MARGINAL PASTURE CONTRACT LENGTH 10-15 YEARS
ADDITIONAL INCENTIVE 20%
SIGNING INCENTIVE - $100 PER ACRE
MAINTENANCE - $6, $8, $9 PER AC.
MINIMUM WIDTH 35 FT.
MAXIMUM WIDTH 180 FT.
22. BOTTOMLAND TIMBER ESTABLISHMENT CP31
23. BOTTOMLAND TIMBER ESTABLISHMENT CP31 CONTRACT LENGTH 10-15 YRS.
50% COST-SHARE, NOT TO EXCEED $300
CAN PLANT WHOLE FIELDS IF
In 100 year flood plain
Hydric Soils
24. Maintenance Agreement Maintenance agreement is for the life of the contract
Can range from 10 to 15 years
No grazing
No building
Stays with the property if it is sold.
25. How do I apply? 1. Contact your local Farm Service Agency office.
2. Open enrollment for Continuous Signup programs.
3. General Signup programs will be announced.
4. Once you have been approved, line up a forestry contractor to complete the work.
5. After project has been completed, turn in all your bills to the FSA.
26. EQIP Federal Cost Sharing Program
Administered through your local Natural Resource Conservation Service (NRCS)
Flat rate based on state or area averages
Must be an agricultural producer
Eligible practices determined by local county
Application will be ranked and compared on a county basis
Practices
TSI
Tree Planting
Fencing
Windbreaks
27. Timber Stand Improvement (TSI) Cost share rate is a flat rate. For area 3 (North East Iowa), $61 per acre Crop Tree Release.
For area 3 (North East Iowa), $80 per acre Site Preparation for Natural Regeneration (Weed Tree Removal).
28. Tree Planting Row Planting or Direct Seeding
Cost share rate is a flat rate. For area 3, $285 per acre.
Other requirements decided by local county.
29. Fencing Interior fencing only
Cost share rate is a flat rate. For area 3, rate is $0.93 per foot for a 5 barb fence.
Other requirements decided by local county.
30. Windbreaks Field Windbreaks
Cost share rate is a flat rate. For area 3, $446 per acre.
Farmstead Windbreaks
Cost share rate is a flat rate. For area 3, $560 per acre.
Other requirements decided by local county
31. Maintenance Agreement Maintenance agreement is for the life of the contract
Can range from 1 to 20 years
No grazing
No building
32. How do I apply? 1. Contact your local NRCS office.
2. Open enrollment, but applications are sent in once a year.
3. Once you have been approved, line up a forestry contractor to complete the work.
4. After project has been completed, turn in all your bills to the NRCS office.
33. WHIP Federal Cost Sharing Program
Administered through your local Natural Resource Conservation Service (NRCS)
Practice rates are based on county averages (Similar to EQIP).
Application will be ranked and compared on a statewide basis
Practices
TSI
Tree Planting
Fencing
Windbreaks
34. TSI, Tree Planting, Fencing, Windbreaks Cost share rate is a flat rate similar to EQIP rates.
35. Maintenance Agreement Maintenance agreement is for the life of the contract
Can range from 5 to 10 years
No grazing
No building
36. How do I apply? 1. Contact your local NRCS office.
2. Open enrollment, but applications are sent in once a year.
3. Once you have been approved, line up a forestry contractor to complete the work.
4. After project has been completed, turn in all your bills to the NRCS.
37. Forest Reserve State of Iowa Program (Started in 1906)
Administered through your County Assessors office
Must maintain 200 growing trees per acre
Minimum size is 2 contiguous acres
Can not be grazed
You can not build on it.
38. Questions?
39. Questions?