Galileo: Status and Simulator Availability Update. Spirent Federal Simulator User Conferences Peter Boulton March/April 2005.
E N D
Galileo: Status and Simulator Availability Update Spirent Federal Simulator User Conferences Peter Boulton March/April 2005
The views expressed in this presentation are the personal views of the author and do not represent official policy statements on behalf of any European institution or body
Galileo Implementation Plan 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2016+ Source: ESA 02/05
Galileo System Test Bed-V2 Satellites • “A” and “B” satellites: GAIN and SSTL • First launch (SSTL satellite) planned December 2005 GSTBV2 Integration
Key 2005 Galileo Programme Objectives • Launch GSTB-V2 • IOV Launch contract for 2008 PFM and FM2 • Selection of ground sites for TTC&M etc • Final Concessionaire selection • Concessionaire to launch ITT for deployment phase contracts • Concessionaire to ensure funding for deployment phase • Additional “Phase C/D/E1” • Including constellation simulators!
GSS7800 Galileo L1/E5ab Demonstrator GSS7900 Galileo / GPS Demonstrator GSS7800 Galileo Simulator L1 E5ab E6 GSS7800 Galileo PRS Simulator Extend range of Galileo/GPS Simulators Galileo Simulation 2004 2005 2006 2006++ ? ? ?
Exhibitions with Galileo Simulator GNSS2004 Rotterdam IoN GNSS 2004Long Beach
Galileo Spectra demonstrated BOC (1,1) Sine (L1 OS) BOC (15,2.5) Cosine (L1 PRS) BOC(10,5) (E6 PRS) AltBOC (15,10) 8-PSK (E5ab OS)
Galileo Simulator Availability • Galileo SIS-ICD is currently a controlled document • Available only to those involved in official ESA contracts • Any Galileo simulators developed by Spirent for official ESA contracts will not be generally available • Until/unless IP issues (including SIS-ICD) are more open • For customers interested in Galileo simulation: • Please contact us off-line for further information • We will register your interest and keep you informed as Galileo programme progresses