1 / 5

PLM-WG

PLM-WG. Status Report 25 XI 2010 Samy Chemli on behalf of the PLM-WG. Fundamental research. General Specification in version 3.0 issued and distributed for comments Comments collected with GUCS and the Project Office for Accelerators Rewriting for version 4.0

walker
Download Presentation

PLM-WG

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PLM-WG Status Report 25 XI 2010 Samy Chemli on behalf of the PLM-WG

  2. Fundamental research • General Specification in version 3.0 issued and distributed for comments • Comments collected with GUCS and the Project Office for Accelerators • Rewriting for version 4.0 • This General Specification will be turned into a Technical Specification that will allow an implementation in the system • Processes and workflow writing

  3. Validation of concepts… • Fundamentals written in the specification (projects, items, master and secondary documents, equipment codes) will have to be tested to check their validity. • Main items to be checked: • Document lifecycle • “Light” item lifecycle • Equipment Codes Centralized Facility • Roles and Access Rights • Structures • Viewers

  4. …more details • Lifecycle states on documents • Ready for Check, Checked, Released, Cancelled • Smarteam only for the moment. No synchronization with EDMS/CDD states as a first approach. • No check-out allowed when document under Ready for Check. Cancel available. • Concurrent freezing of 3D and 2D. More generally speaking, it is the freezing of all children. • Usage of SmT workflows if necessary • Navigation Structures • Equipment codes structure • Structure imported from the LHC Baseline (Project Breakdown Structure) • Sub-projects structure vs. top items/documents to be investigated • Multiple B.O.M. management : specifications, manufacturing, as-built • Item centric (phases of the lifecycle) vs. document centric (types of documents making up the BOM). To be investigated • Rights and roles will be managed inside SmT in a first row. External tools to centralize the management of equipment codes (defining also rights and roles) might be plugged into SmT when ready.

  5. Scope and AOB • Scope will be restrained to the Collimation Project in EN. • PH will be associated to it as S. Bally will participate to discussions with ASE. • A viewer has been chosen to allow viewing of data without Catia/SmT.It works on native Catia files and avoids discrepancies with CGR/VRML formats. Implementation is on-going. • CWN pilot project feed-back has been collected • CWN will stay as it is up and running • No more enhancements/investments on the tool

More Related