200 likes | 690 Views
BIVŠA VIŠA DJEVOJAČKA ŠKOLA U MOSTARU. THE FORMER GIRLS’ HIGH SCHOOL IN MOSTAR. Grad Mostar City of Mostar Zavod za prostorno uređenje The spatial development institute.
E N D
BIVŠA VIŠA DJEVOJAČKA ŠKOLA U MOSTARU THE FORMER GIRLS’ HIGH SCHOOLIN MOSTAR Grad Mostar City of Mostar Zavod za prostorno uređenje The spatial development institute ZAVOD ZA PROSTORNO UREĐENJE, 88000 Mostar, Ul.H.Repca bb; Tel. 036 581 135; Fax: 036 581 134; e-mail: gmprostor@bih.net.ba
BIVŠA VIŠA DJEVOJAČKA ŠKOLA U MOSTARU /THE FORMER GIRLS’ HIGH SCHOOLIN MOSTAR LOKACIJA PROJEKTA PROJECT LOCATION
BIVŠA VIŠA DJEVOJAČKA ŠKOLA U MOSTARU/THE FORMER GIRLS’ HIGH SCHOOLIN MOSTAR Foto-montaža obnovljenog i transformisanog kompleksa sa postojecom okolinom Photo-montage of the restored andconverted complex in its existing surroundings
BIVŠA VIŠA DJEVOJAČKA ŠKOLA U MOSTARU/THE FORMER GIRLS’ HIGH SCHOOLIN MOSTAR PLANOVI I FASADE PLANS AND FACADES
U SKLOPU BIVŠE VIŠE DJEVOJAČKE ŠKOLE U MOSTARU PREDVIĐENI SU SLIJEDEĆI SADRŽAJI: • Garaža (150 vozila) 4446,5 m2 • Komercijalni 3413,5m2 • Hotel 1732,8m2 • Uredi 1136,9m2 • Sale 2061,0m2 • Rekreacija 1199,3 m2 • Ukupno: 13990,0 m2 In adition to these objects, THE FORMER GIRLS’ HIGH SCHOOLIN MOSTARis planned to provide following services: • Garage (150 cars) 4446,5 m2 • Commercial 3413,5 m2 • Hotel 1732,8 m2 • Offices 1136,9 m2 • Halls 2061,0 m2 • Recreation areas 1199,3 m2 • Total : 13990,0 m2
Procjena investicije / Investment cost approximation PredraČun troškova ulaganja (sve izraženo u BAM) • Pripremni radovi 418.200 • Zemljani radovi 469.165 • Betonski radovi 3.434.700 • Zidarski radovi 818.564 • Grubi stolarski radovi 120.000 • Postavljanje krova 284.000 • Hidroizolacija 256.136 • Fasadni radovi 610.000 • Grubi metalni radovi (ploče) 95.000 • Ostali metalni radovi 125.000 • Fini stolarski radovi 512.680 • Keramičarski radovi 180.000 • Kameni radovi 811.840 • Postavljanje podova 240.000 • Gipsani radovi 60.000 • Farbanje 60.000 • Metalni krovovi 145.000 • Stakleni radovi 125.000 • Voda i kanalizacija 287.591 • Električne instalacije 2.500.000 • Postavljanje bazena 120.000 • Liftovi 620.000 • Klima uređaji 2.357.000 UKUPNO 14.649.876 Estimated Investment Costs (all in KM) • Preparation work 418.200 • Soil work 469.165 • Concrete work 3.434.700 • Masonry 818.564 • Carpenter work 120.000 • Roong 284.000 • Hydro isolation 256.136 • Work on facades 610.000 • Sheet-metal work 95.000 • Other-metal work 125.000 • Joinery 512.680 • Ceramics 180.000 • Stonework 811.840 • Flooring 240.000 • Gypsum work 60.000 • Paintings 60.000 • Metal roofs 145.000 • Glass work 125.000 • Water and sewage 287.591 • Electrical installation 2.500.000 • Pool installation 120.000 • Elevators 620.000 • Air condition 2.357.000 Total 14.649.876
Aproksimativni troškovi pripreme za investiranje / Initial costs for investment • PROSJEČNA CIJENA GRAĐEVINSKOG ZEMLJIŠTA II ZONA ............................................................. – 20,78 KM/m2 • NAKNADA ZA POGODNOST RENTA II ZONA (KORISNA POVRŠINA OBJEKTA) ............................................................. – 57,72 KM/m2 • NAKNADA ZA UREĐENJE GRAĐEVINSKOG ZEMLJIŠTA U OBUHVATU OVOG PLANA IZNOSI APROKSIMATIVNO (KORISNE POVRŠINE OBJEKTA) ............................................................. KM/m2 NAPOMENA: U GORE NAVEDENIM IZNOSIMA NISU URAČUNATI TROŠKOVI SLIJEDEĆIH STAVKI: • IZRADA PROJEKTNE DOKUMENTACIJE, • ADMINISTRATIVNE TAKSE I NAKNADE ZA IZGRADNJU SKLONIŠTA (1% OD PREDRAČUNSKE VRIJEDNOSTI OBJEKATA). • AVERAGE PRICE OF BUILDING LAND, ZONE II .......................................................... – 20,78 KM/m2 • FEES FOR AMENITIES FEES ZONE II (NETTO BUILDING AREA) .......................................................... – 57,72 KM/m2 • URBAN PLANNING FEES AFFECTED BY THIS PROJECT .......................................................... KM/m2 NOTE: THE ABOVE FEES DOES NOT INCLUDE COSTS OF THE FOLLOWING: • PREPARATION OF PROJECT DOCUMENTATION • ADMINISTRATIVE FEES AND FEES FOR THE CONSTRUCTION OF BOMB SHELTERS REQUIRED BY LAW (1% OF THE ESTIMATE VALUE OF BUILDINGS).
EKONOMSKA OPRAVDANOST PROJEKTA / THE ECONOMIC VIABILITY OF THE PROJECT
BIVŠA VIŠA DJEVOJAČKA ŠKOLA U MOSTARU/THE FORMER GIRLS’ HIGH SCHOOLIN MOSTAR
BIVŠA VIŠA DJEVOJAČKA ŠKOLA U MOSTARU/THE FORMER GIRLS’ HIGH SCHOOLIN MOSTAR