1 / 31

+12.500 Kfz/Std.

-15.000 Kfz/Std. 2.500 Kfz/Std. -5.000 Kfz/Std. -10.000 Kfz/Std. 2.500 Kfz/Std. +2.500 Kfz/Std. +12.500 Kfz/Std. +4.000 Kfz/Std. +6.000 Kfz/Std. +2.000 Kfz/Std. -6.000 Kfz/Std. -16.000 Kfz/Std. -10.000 Kfz/Std. +8.000 Kfz/Std. +2.000 Kfz/Std. 2.500 Kfz/Std. +4.000 Kfz/Std.

wanda
Download Presentation

+12.500 Kfz/Std.

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. -15.000 Kfz/Std. 2.500 Kfz/Std. -5.000 Kfz/Std. -10.000 Kfz/Std. 2.500 Kfz/Std. +2.500 Kfz/Std. +12.500 Kfz/Std.

  2. +4.000 Kfz/Std. +6.000 Kfz/Std. +2.000 Kfz/Std. -6.000 Kfz/Std. -16.000 Kfz/Std. -10.000 Kfz/Std. +8.000 Kfz/Std. +2.000 Kfz/Std.

  3. 2.500 Kfz/Std. +4.000 Kfz/Std. 1.500 Kfz/Std. -4.000 Kfz/Std.

  4. Sz. 1: -9.000 Kfz/Std. Sz. 2: -5.000 Kfz/Std. -5.000 Kfz/Std. -3.500 Kfz/Std. -10.000 Kfz/Std. Sz. 1: +6.500 Kfz/Std. Sz. 2: +2.500 Kfz/Std. +8.000 Kfz/Std. +2.000 Kfz/Std.

  5. ?

  6. Einbahnstraße Stresemannstraße Bestand

  7. Phase I

  8. Phase II

  9. Phase III

  10. Phase I

  11. Phase I.1

  12. Phase I.2

  13. Phase III

  14. Phase IV

  15. Bestand (3 Phasen) Einbahnstraße (4 Phasen) 1.1 1 1.2 Umlaufzeit 2 3 3 4

  16. 2.500 Kfz/Std.

  17. Stadtbus 183 Stadtbus 283 Metrobus 20 Stadtbus 180 Nachtbus 600 Stadtbus 115 Metrobus 3 Nachtbus 602

  18. 2.500 Kfz/Std.

  19. _ _ + +

More Related