1 x 1 m2 chamber Status J. Wotschack
1 x 1 m2 sketch (not to scale) 1 FR4 + Cu (Rui) 4 2 3 15 Stiffening panel 5.05 5.00 30 8 Aluminium support plate Rohacell FR4 (SCEM: 44.98.90.010.4) 5 J. Wotschack
PCB J. Wotschack
Status & plans • MM boards were glued yesterday (Monday, 23 July) to support panel • Mesh was glued yesterday to drift gap panel at Seritec (Vevey) • Plan to measure Wednesday/Thursday the straightness of the panels using the NA62 laser interferometer • Assembly Thursday + first mechanical and electrical tests • Mounting of connectors Friday or early next week? • Tests in lab with source and cosmics • Installation in H6 in 2nd half of next week ? J. Wotschack
Some photos of glueing the MM boards to the support panel J. Wotschack
Glueing the panels to Al plate Assembly with MM face down on flat table Distributed weights on assembly while curing J. Wotschack
Drift electrode panel J. Wotschack