20 likes | 148 Views
Edinburgh RICH Upgrade Plans. Interest in RICH upgrade Build from our involvement in the LHCb RICH Steve Playfer, is moving main interest to LHCb, has hardware interest Pete Clarke, already in LHCb, has electronics background Scottish Universities Physics Alliance (SUPA)
E N D
Edinburgh RICH Upgrade Plans Interest in RICH upgrade Build from our involvement in the LHCb RICH Steve Playfer, is moving main interest to LHCb, has hardware interest Pete Clarke, already in LHCb, has electronics background Scottish Universities Physics Alliance (SUPA) 6 Scottish Universities Particle Physics in Edinburgh and Glasgowincreased collaboration in experiment and theory SUPA2 submitted proposal to funding agency in 2008 Decision expected in 1st half of 2009 Edinburgh Particle Physics @SUPA2 Additional posts and investment in laboratory facilities Electronics engineer, technician, fellow Electronics laboratory kit: Pulse Generators, Logic analyser, Source meters, Oscilloscope, Arbitrary waveform generator, … Stephan Eisenhardt
Edinburgh RICH Upgrade Plans • Flat-Panel-MaPMT • Measure properties and characteristics of device spec. FE-chip • Gain and its variations, signal to noise separation, intrinsic cross-talk, magnetic field properties, shielding efficiency, QE, … • Reference system: video amplifier PCB VME based QADC 64 ch. • Optionally: boardBeetle with Beetle1.2MA0 (limited use) 256 ch. • Bench tests – plan to start asap • Testbeams • Electronics • Development of read-out electronics • Interest in read-out board, FPGAs, optical fibre read-out • No plans for developing ASICs • Production Phase • Photon-detector test facilities for RICH upgrade photon-detectors • Will require more than one institute • Production of read-out component Stephan Eisenhardt