An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Regional Energy and Environment Agency from North Alentejo (PORTUGAL) 5thSCMeeting Lakatamia, 12th-13thJune 2014

  2. WP3 – Joint approach for more efficient implementation of local energy strategies SUMMARY • Training Materials developed • Areas • Documents • Suggestions • Quality Control • Methodology • QualityControlalreadydeveloped • Missingpoints • EWG contributions to CBW (WP4) • Timeplan (tasks and deadlines) • Short summary of the work done in each EWG (5 minutes each) – EWG Coordinators

  3. WP3 – Joint approach for more efficient implementation of local energy strategies ACTIVITIES AND OUTPUTS (for each EWG Area): PDF with important data taking into account the main topics to be worked – to support the local/regional capacity building workshops (to be implemented by WP4) PPT with general data taking into account the main topics and to be used during the capacity building workshops 1 case study per EWG Member to be included in Library of Best Practices General contributions to the Step by Step Guide (to be sent to the WP3 Leader) 1 Article in EN to be translated and to be uploaded in the website Other relevant materials taking into account the agreements in SC Meetings and EWG Meetings

  4. WP3 – Joint approach for more efficient implementation of local energy strategies Training Materials developed • Areas

  5. WP3 – Joint approach for more efficient implementation of local energy strategies • Training Materials developed • Documents • Biomass: KGC Maribor - Done • Solar: TUC - Done • Stakeholders involvement: GERES - Done • EE Buildings: Granollers City Council - Done • Public Lighting: AREANATejo - Done • Legislation: Kyoto Club - Done • Funding: Lakatamia Municipality - Done • Awareness: Energap - Done

  6. WP3 – Joint approach for more efficient implementation of local energy strategies • Training Materials developed • Suggestions for EWG Coordinators • Use only a single template/layout (easier to consult) • Structure the contents in a better way • Take into account the comments and remarks from the Quality Control • Prepare the final versions (after the Quality Control)

  7. WP3 – Joint approach for more efficient implementation of local energy strategies • Training Materials developed - Discussion • Agreements on authorship and references in the project deliverables • Authors • Templates • Structures • References • (…)

  8. WP3 – Joint approach for more efficient implementation of local energy strategies 2. Quality Control • Objectives: • Analizeallthecontents • Identify possible information errors • Improvementsuggestions • Methology • EWG Coordinators nominee the responsibles to this control • Each training content pass to a Quality Control • EWG Coordinators report the results to WP3 Leader • EWG Coordinators improve the training contents

  9. WP3 – Joint approach for more efficient implementation of local energy strategies 2. Quality Control • QualityControlalreadydeveloped:

  10. WP3 – Joint approach for more efficient implementation of local energy strategies 2. Quality Control Quality Control already developed:

  11. WP3 – Joint approach for more efficient implementation of local energy strategies 2. Quality Control Quality Control already developed

  12. WP3 – Joint approach for more efficient implementation of local energy strategies 2. Quality Control • Missing points/next steps • Develop the Quality Control as soon as possible • Send the Quality Control Sheet to WP3 Leader • Improve the training Contents (if necessary) • Finish the Contents (if necessary)

  13. WP3 – Joint approach for more efficient implementation of local energy strategies • 3. ACTIVITIES AND OUTPUTS – Links to WP4 and WP5 • Appropriate quality training materials to support the local/regional capacity building workshops (to be implemented by WP4) • Indicative outline of each thematic training course, to be adapted nationally (articulation with WP4) • Library of Best Practices available online, in 8 thematic areas • Valuable input for developing the Step by Step Guide • Assistance to the implementation of pilot cases in WP5

  14. WP3 – Joint approach for more efficient implementation of local energy strategies • 3. ACTIVITIES AND OUTPUTS: • Step-by-step Guide for efficient implementation of local energy strategies by forming local partnerships: • Expert Working Groups • Local Action Groups • Pilot Cases • Case Studies • (as Best Practices)

  15. WP3 – Joint approach for more efficient implementation of local energy strategies • 3. ACTIVITIES AND OUTPUTS: • To all EWG Coordinators: • Prepare a short summary of each area (1 page) that will serve as introduction in each chapter of the Library of Best Practices

  16. WP3 – Joint approach for more efficient implementation of local energy strategies 4. TIME PLAN – ImportantTasksandDealines Complete the Quality Control – 24thJune 2014 First draft of LBP and Step-by-Step Guide – 24thJune 2014 Final version of the contents – 1st July 2014 Training deliverables uploaded on the website – 04th July 2014 Short summary of each EWG area (8 Coordinators) –04th July 2014 Prepare the final structure of the LBP – Final Version– 08th July 2014

  17. WP3 – Joint approach for more efficient implementation of local energy strategies 5. Short summary of the work done in each EWG (5 minutes each) – EWG Coordinators Developedwork Tasks Materials Importance to next steps

  18. Contacts AREANATejo E-mail: info@areanatejo.pt Website: www.areanatejo.pt Tel.: (+351) 245 309 084 Tiago Gaio (Manager): tiago.gaio@areanatejo.pt Ana Lacão (Financial & Dissemination): ana.lacao@areanatejo.pt Hélia Pereira (Technical): helia.pereira@areanatejo.pt Hugo Saldanha (Technical): hugo.saldanha@areanatejo.pt