2.36k likes | 13.39k Views
STEPS IN SETTING OUT A BUILDING. MINIMUM SIZES FOR FOUNDATIONS. SETTING OUT CORNER PROFILES. MARKING OUT FOUNDATION AND WALL THICKNESSES. MARKING OUT ON THE GROUND FROM THE PROFILES. EXCAVATION OF FOUNDATION. SETTING OUT LEVELS FOR THE HEIGHT OF THE CONCRETE.
E N D