Status of the International Linear Collider and Importance of Industrialization. B Barish Fermilab 21-Sept-05. An International Initiative.
E N D
Status of the International Linear Collider and Importance of Industrialization B Barish Fermilab 21-Sept-05
An International Initiative • R&D toward an ILC was carried out over the last decade in three regions of the world and primarily at SLAC in the U.S., KEK in Japan and DESY in Germany • The crucial technology decision was successfully made by an international panel having 4 members from each region • We are now entering the design phase, which will be carried out under the guidance of the GDE, which again has comparable membership from all three regions • We fully expect the final project to be international Fermilab ILC Industry Meeting
The Technology Recommendation • The recommendation was presented to ILCSC & ICFA on August 19 in a joint meeting in Beijing. • ICFA unanimously endorsed the ITRP’s recommendation on August 20 Fermilab ILC Industry Meeting
The Community then Self-Organized Nov 13-15, 2004 Fermilab ILC Industry Meeting
2nd ILC Accelerator Workshop Fermilab ILC Industry Meeting
The Global Design Effort • The Mission of the GDE • Produce a design for the ILC that includes a detailed design concept, performance assessments, reliable international costing, an industrialization plan , siting analysis, as well as detector concepts and scope. • Coordinate worldwide prioritized proposal driven R & D efforts (to demonstrate and improve the performance, reduce the costs, attain the required reliability, etc.) Fermilab ILC Industry Meeting
2005 2006 2007 2008 2009 2010 Global Design Effort Project Baseline configuration Reference Design The GDE Plan and Schedule Technical Design ILC R&D Program Bids to Host; Site Selection; International Mgmt
Starting Point for the GDE Superconducting RF Main Linac Fermilab ILC Industry Meeting
Cost Breakdown by Subsystem Civil SCRF Linac Fermilab ILC Industry Meeting
TESLA Cavity ~1m 9-cell 1.3GHz Niobium Cavity Reference design: has not been modified in 10 years Fermilab ILC Industry Meeting
Cavity Fabrication Fermilab ILC Industry Meeting
Gradient Results from KEK-DESY collaboration must reduce spread (need more statistics) single-cell measurements (in nine-cell cavities) Fermilab ILC Industry Meeting
Improved Fabrication Fermilab ILC Industry Meeting
Improved ProcessingElectropolishing Fermilab ILC Industry Meeting
Improved Cavity Shapes Fermilab ILC Industry Meeting
ILC Siting and Conventional Facilities • The design is intimately tied to the features of the site • 1 tunnels or 2 tunnels? • Deep or shallow? • Laser straight linac or follow earth’s curvature in segments? • GDE ILC Design will be done to samples sites in the three regions • North American sample site will be near Fermilab • Japan and Europe are to determine sample sites by the end of 2005 Fermilab ILC Industry Meeting
1 vs 2 Tunnels • Tunnel must contain • Linac Cryomodule • RF system • Damping Ring Lines • Save maybe $0.5B • Issues • Maintenance • Safety • Duty Cycle Fermilab ILC Industry Meeting
Possible Tunnel Configurations • One tunnel of two, with variants ?? Fermilab ILC Industry Meeting
ILC Civil Program Civil engineers from all three regions working to develop methods of analyzing the siting issues and comparing sites. The current effort is not intended to select a potential site, but rather to understand from the beginning how the features of sites will effect the design, performance and cost Fermilab ILC Industry Meeting
Toshiba Thales CPI Baseline Klystrons Available today: 10 MW Multi-Beam Klystrons (MBKs) that operate at up to 10 Hz Fermilab ILC Industry Meeting
Improved Klystron ? 5 MW Inductive Output Tube (IOT) 10 MW Sheet Beam Klystron (SBK) Low Voltage 10 MW MBK Parameters similar to 10 MW MBK Voltage e.g. 65 kV Current 238A More beams Perhaps use a Direct Switch Modulator Klystron Output IOT KEK SLAC CPI Drive Fermilab ILC Industry Meeting
How and when to involve industry? • Large Scale Project Characterization • Large Project Management • Precision Engineering • International Coordination • Costing • Industrialization • Civil Construction & Infrastructure • Cryogenics • Superconducting RF structures, couplers, etc • Electronics and Control Systems • Large Scale Computing Fermilab ILC Industry Meeting