Project Plan Review for Propulsion, Structures, Aerodynamics, and Controls

This project plan review covers various aspects of the aircraft design, including propulsion system sizing, construction methods for wings and fuselage, aerodynamic analysis, and control surface sizing.

waylonj
Download Presentation

Project Plan Review for Propulsion, Structures, Aerodynamics, and Controls

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Presented by: Mark Blanton Loren Garrison Chris Peters Jeff Rodrian September 26, 2000 Chris Curtis

  2. Project Plan Review • Project Plan Review Propulsion • Propulsion Lead Mark Blanton • Date and Milestone • September 25-26 Propulsion Preliminary Design Review #1 Analysis • Preliminary Propulsion System Sizing • Determine characteristics of motor, propeller, gearbox, and battery system • September 26 Propulsion PDR #1 DR2 Presentation • September 27 Propulsion PDR #1 Rework • September 28 Propulsion PDR #1

  3. Project Plan Review • Project Plan Review Propulsion • Date and Milestone • October 3-5 Propulsion Experiment • Test Stand Construction Beginning Oct. 3rd ending Oct. 5th • Propulsion Experiment Procedure Developed by Oct. 5th • October 11-12 Propulsion Experiment • Evaluation of different motor and propeller combinations using Boeing Tunnel at ASL • Provides hard data concerning performance for propulsion sizing • October 13-14 Propulsion Experiment Analysis/Propulsion PDR #2 • October 15 Propulsion Experiment DR2 Presentation • October 16 Propulsion PDR#2 Rework • October 17 Propulsion PDR#2 Presentation • Final Sizing of the Propulsion System

  4. Project Plan Review • Project Plan Review Propulsion • Date and Milestone • October 18-22 Thiokol Report – Propulsion Section Analysis • October 23 Thiokol Report – Propulsion Section Presentation to DR#2

  5. Project Plan Review • Project Plan Review Structures • Date and Milestone • September 28 Finalize Composite Supplier • October 1 Wing Construction Method & Wing Test Plan • October 2 Fuselage Construction Method & Wing and Fuselage Interface • October 5 Structures and Weight PDR • October 12 Wing Test Model Complete • October 14 Test Wing Model • October 15 Analyze Wing Test Results

  6. Project Plan Review • Project Plan Review Structures II • Date and Milestone • October 15 Analyze Wing Test Results • October 16 Preliminary Fuselage Layout, Wing Test Summary, & Fuselage Loft • October 18 Landing Gear Design Complete • October 20 Final Structure Design • October 22 Report Draft • October 23 Draft to Group • October 30 Final Analysis and Parameter Verification

  7. Project Plan Review • Project Plan Review Aerodynamics • Date and Milestone • September 29 Airfoil Selection • October 2 Aircraft Sizing Code Complete • October 3 PDR 1 • October 5 Develop CFD Model • October 13 CFD Model Complete • October 17 Preliminary Results for PDR 2 • October 19 PDR 2

  8. Project Plan Review • Project Plan Review Aerodynamics II • Date and Milestone • October 20 Report Draft • October 23 Draft to Group • October 30 Final Analysis and Parameter Verification

  9. Project Plan Review • Project Plan Review Controls • Date and Milestone • September 30 SM, CG, and NP estimations • October 1 Aircraft Sizing Code • October 1 VT and HT estimations • October 3 Preliminary Aircraft and Systems T.F. • October 8 Preliminary Control Surface Sizing • October 11 VT, HT, Ctrl. Surf., trade studies/PDR to Group • October 12 PDR

  10. Project Plan Review • Project Plan Review Controls II • Date and Milestone • October 17 Final Ctrl. Surf. Analysis • October 21 Aircraft and systems simulation in Simulink • October 22 Report Draft • October 23 Draft to Group • October 24 PDR 2 • October 30 Final Analysis and Parameter Verification