Vision:

Vision: The Neurosciences Research Building is a continuation of the School of Medicine and Indiana University's focus on expanding and strengthening the biomedical and life sciences research capability of the university. Context. Site Plan. Enlarged Site Plan. November 19, 2014. I-65.

Download Presentation

Vision:

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Board of Trustees Meeting Vision: The Neurosciences Research Building is a continuationof the School of Medicine and Indiana University's focus on expanding and strengthening the biomedical and life sciences research capability of the university.

  2. Board of Trustees Meeting Context

  3. Board of Trustees Meeting Site Plan

  4. Board of Trustees Meeting Enlarged Site Plan

  5. Board of Trustees Meeting November 19, 2014 I-65 Methodist Hospital Missouri St IU Research 16th Street Existing Garage Clarian People Mover Proposed Clinic Proposed Clarian Garage 15th Street Aerial View

  6. Board of Trustees Meeting November 19, 2014 People Mover View

  7. Board of Trustees Meeting November 19, 2014 People Mover View

  8. Board of Trustees Meeting November 19, 2014 Ground Level View

  9. Board of Trustees Meeting November 19, 2014 Ground Level View

  10. Board of Trustees Meeting November 19, 2014 • Building Concepts: • Layered N/S Plan and Section • Vertical Integration of Lab • Support Functions • Modular Design • (Lab, Support, Office) • Behavior Lab Module Stacked Building Section

  11. Board of Trustees Meeting November 19, 2014 Clinic Research Building First Floor Plan

  12. Board of Trustees Meeting November 19, 2014 Clinic Research Building Second Floor Plan

  13. Board of Trustees Meeting November 19, 2014 Clinic Research Building Third, Fourth, Fifth Floor Plan

  14. Board of Trustees Meeting November 19, 2014 Phase 2 Diagram

  15. Board of Trustees Meeting November 19, 2014 Phase 2 Phase 2 Image

  16. Board of Trustees Meeting November 19, 2014 Metal Panel A Clinic Research Building Metal Panel B Precast Concrete A Fritted Glass A & B Clear Glass Precast Concrete B South Elevation

  17. Board of Trustees Meeting November 19, 2014 Metal Panel A Clear Glass Fritted Glass A & B Fritted Glass A & B Precast Concrete A Precast Concrete B Precast Concrete B East Elevation

  18. Board of Trustees Meeting November 19, 2014 Research Building Clinic Metal Panel B Metal Panel A Fritted Glass C Clear Glass Precast Concrete A Precast Concrete B North Elevation

  19. Board of Trustees Meeting November 19, 2014 Interior View

  20. Board of Trustees Meeting November 19, 2014 LEED Mission: A leading edge system for certifying the greenest performing buildings in the world. Sustainability

  21. Board of Trustees Meeting November 19, 2014 Project Goal: LEED Silver • Sustainable Sites • Urban site previously developed • 2. Efficient use of Water • 35% water use reduction • 3. Energy and Atmosphere • Heat Recovery wheel • 4. Materials and Resources • Divert 50% of construction waste from disposal • 5. Indoor Environmental Quality • Provide occupant controls for airflow, temperature and lighting • 6. Innovative Design • Paperless Construction Administration Process Sustainability

  22. Board of Trustees Meeting November 19, 2014 • End of Design Development: December 10th, 2010 • IU Review Comments due: December 23rd, 2010 • End of Construction Documents: March 31st, 2011 • IU Review Comments due : April 8th, 2011 • Bidding:April 8th 2011 – May 5th 2011 • Construction:June 6th 2011-July 11th 2013 • Commissioning: July 11th 2013-Sept. 11th 2013 • Close-out: Sept.11th 2013-Nov. 11th 2013 • Occupied: January 2014 Schedule

  23. Board of Trustees Meeting November 19, 2014 Aerial View Looking Northwest