Explore the successful implementation of eco-friendly technology in PMGSY road construction in Odisha, showcasing detailed case studies and impressive results achieved through the use of TerraZyme. Discover how significant fuel and material savings were realized, leading to sustainable and durable roads that withstood the challenging monsoon season without any damages. This case study highlights the efficiency and cost-effectiveness of the innovative approach adopted for road construction in Odisha under the PMGSY scheme.
E N D
ORRDA Innovative Technology Case study in PMGSY road Odisha
ROAD NAME Harinjipada To Jamunapur Road
ROADDETAILS • Contractor Name : Sandeep Alok Bhoi. • Road Length : 1924m. • Dillution Ratio : • First Layer -200ml for 2.8Cu.mt. • Second Layer -200ml for 3.0Cu.mt. • Start Date :30.03.2017. • End Date :19.04.2017.
ROAD NAME L064-SH42 To BARPITHA Road.
ROADDETAILS • Contractor Name : Mrunal Mohanty. • Road Length : 1850m. • Dillution Ratio : • First Layer -200ml for 2.8Cu.mt. • Second Layer -200ml for 3.0Cu.mt. • Start Date :15.04.2017. • End Date :06.05.2017.
ROAD NAME LO97-kHALIAPALI TO DHAMNASAR ROAD
ROADDETAILS • Contractor Name : Bibhudatta Das dev Sharma. • Road Length : 1500m. • Dillution Ratio : • First Layer -200ml for 2.8Cu.mt. • Second Layer -200ml for 3.0Cu.mt. • The road work completed in month of June and the road was used without any blacktop for entire rainy season without any damages to the road
ROAD NAME LO64-SUANABAHAL TO MURIBAHAL ROAD
ROADDETAILS • Contractor Name :Pruthwiraj Patra. • Road Length : 2000m. • Dillution Ratio : • First Layer -200ml for 2.8Cu.mt. • Second Layer -200ml for 3.0Cu.mt. • The road work completed in month of June and the road was used without any blacktop for entire rainy season without any damages to the road
ROAD NAME lo62 Kankaria Chhak to Dumerpali Road
ROADDETAILS • Contractor Name :Mohit Kumar Jain . • Road Length : 825m. • Dillution Ratio : • First Layer -200ml for 2.8Cu.mt. • Second Layer -200ml for 3.0Cu.mt. • The road work completed in month of July and the road was used without any blacktop for entire rainy season without any damages to the road
Salient Features • 1500 to 2000 Sq.mt a day of construction achieved with basic machineries, saving fuel • Aggregates usage was reduced by over 70% in the design making it an eco friendly technology. Instead of 390m3 of metal , only 97m3 of metal was used • GSB layer was eliminated, transportation of material is reduced by using local soil, there by saving on fuel and emissions from vehicles. Transportation of 405m3 of GSB material was avoided by using TerraZyme • Savings per KM of road constructed using TerraZyme is approximately 1.5 Lakhs per KM
Conclusion • Roads built using TerraZyme have been built in 2 districts of Odisha under PMGSY scheme • More than 15kms of road work completed before the monsoons. • Few road were used without any black topping during the monsoons.These roads performed like all weather roads. • There was no damage like potholes , rutting or washboarding through the entire monsoon season