10 likes | 128 Views
Plumbing C Block emergency exit. Gymea Solar Model. Existing water tank. 28500. Both sheds are to be fully metal clad. Low voltage both AC/DC pose serious OH&S risk of electrocution (otherwise fencing required) Inverter and MSBs are to be lockable
E N D
Plumbing C Block emergency exit Gymea Solar Model Existing water tank 28500 Both sheds are to be fully metal clad. Low voltage both AC/DC pose serious OH&S risk of electrocution (otherwise fencing required) Inverter and MSBs are to be lockable Garage allows storage of solar tools additionally photovoltaic array to be mounted on raked swivel base to allow student to see in practice, under panel wiring; demonstrate magnetic north to true north All conduit to be buried 500 shared trench electric HDUPVC 75mm/ telecommunications 50mm conduit with access pits as shown Conduits power and telemetry prewired tor future wind turbine 5 kW Smart metering and telemetry connect all installations systems to PSTN for institute use. 7500 Wall penetration Inject Solar power to DB 22A 5000 17500 garage 6300 Metal roof Telecommunications/electrical pit & conduit 5000 Telemetry connect by RS485 to DB 14 2nd A Block 6300 Tile roof Shaded area Sutherland Trade Centre 22500 J.P.Teasel version 2/12/10