1 / 13

Lesson 9: Running Fixes

Lesson 9: Running Fixes. Lesson 8: Running Fixes. AGENDA: Definition of Running Fix Advancing non-simultaneous LOP’s. Plotting/labeling running fixes. Determining an EP. Applicable reading: Hobbs pg. 138-147. Learning Objectives:. Upon completion of this lesson, the student will:

wendi
Download Presentation

Lesson 9: Running Fixes

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Lesson 9: Running Fixes

  2. Lesson 8: Running Fixes • AGENDA: • Definition of Running Fix • Advancing non-simultaneous LOP’s. • Plotting/labeling running fixes. • Determining an EP. • Applicable reading: Hobbs pg. 138-147.

  3. Learning Objectives: Upon completion of this lesson, the student will: • Apply correct procedures for advancing two or more non-simultaneous, nonparallel lines of position to establish a running fix. Applicable Reading: Hobbs, pp. 138-142

  4. Learning Objectives: Upon completion of this lesson, the student will: • Apply correct procedures to plot and label a running fix with bearings on different objects, a running fix with bearings on the same object and a running fix advancing a distance circle of position. • Comprehend the reliability of running fixes compared to simultaneous fixes.

  5. Running Fixes • Running Fix - A position determined by crossing non-simultaneous lines of position (LOP’s) that are advanced or retired to a common time. 0945 NOTE: NOT TO SCALE

  6. Tank Running FIX Light FL 6s 58ft 9M Long 9 Point 5 5 9 9 5 9 9 9 9 11 11 5 9 11 9 11 15 11 11 15 15 9 11 19 15 17 pa 17 19 19 9 6 17 17 0810 19 11 20 20 20 21 20 20 20 0810 20 0800 STEP #1: • Take a bearing to the Nav Aid and draw on the chart. • Plot your associated DR position. 20 21 20 C- 085 S - 12 21 21 21 21 23 23 23 23 23 23

  7. Tank Running FIX Light FL 6s 58ft 9M Long 9 Point 5 5 9 9 5 9 9 9 9 11 11 5 9 11 9 11 15 11 11 15 15 9 11 19 15 17 0830 pa 17 19 19 0810 9 6 17 17 19 11 20 20 0830 20 20 20 0810 21 20 21 0800 20 20 21 20 C- 085 T S - 12 21 STEP #2: • Take a second bearing and plot it. • Plot your associated DR position. 21 21 21 23 23 23 23 23 23

  8. Procedures for Advancing an LOP STEP #3 • Determine distance traveled between the DR’s associated with your two LOP’s. • Draw a construct line your DR course. • Terminate line @ distance = DR1  DR2 • Parallel the first LOP through this point • Label this advanced LOP with both the original time and the time it was advanced.

  9. Tank Running FIX Light FL 6s 58ft 9M Long 9 Point 5 5 9 9 5 9 9 9 9 11 11 5 9 11 9 11 15 11 11 15 15 9 11 19 15 0810-0830 0830 pa 17 19 9 6 0810 17 17 19 11 20 20 4 nm 0830 20 20 0810 21 0800 21 20 20 21 20 C- 085 T S - 12 21 21 21 21 23 23 23 23 20 min @ 12 kts = 4 nm 23 23

  10. Procedures for Advancing an LOP STEP #4: • The point where this advanced LOP and the second LOP cross is the running fix position. • Mark a circle and properly plot and label the “R-FIX” with the time. • Plot a new course and speed line IAW the six rules of DR.

  11. Tank Running FIX Light FL 6s 58ft 9M Long 9 Point 5 5 9 9 5 9 9 9 9 11 11 5 9 11 9 11 11 11 15 0810-0830 15 9 11 19 15 17 0830 pa 17 19 19 9 6 0810 17 17 19 11 20 20 0830 20 20 0810 21 21 0800 20 20 20 20 C- 085 T S - 12 21 21 21 C- 085 T S - 12 21 R-FIX 0830 23 23 23 23 23 23

  12. Estimated Position (EP)From a single LOP • Estimated Position - The most probable position of vessel determined from incomplete data or data of questionable accuracy. Purpose: • Used when you can’t obtain a second LOP within the allowed 30 minutes.

  13. Estimated Position (EP) Plotting Procedure Draw a construct line originating at the DR position corresponding to the time of the single LOP and terminating at the closest point on the LOP ( a  segment).

More Related