1 / 3

Work distribution

Work distribution. Parts of 7 (not 7.1) - Christian Gr ø n 7.2 QA/QC – Lutgart van Nevel 3.4 aquifer types - John Chilton 3 network design – Giuseppe Giuliano 4 chemical monitoring - Ariane Blum 8 sampling techniques and field methods - Anne-Marie Fouillac 4.1 - Jan Cramer

wes
Download Presentation

Work distribution

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Work distribution • Parts of 7 (not 7.1) -Christian Grøn • 7.2 QA/QC – Lutgartvan Nevel • 3.4 aquifer types - John Chilton • 3 network design – GiuseppeGiuliano • 4 chemical monitoring - Ariane Blum • 8 sampling techniques and field methods - Anne-Marie Fouillac • 4.1 - Jan Cramer • 4.1.3, 4.2.3 selection of parameters – Paola Bottoni • 4.2 operational monitoring - Ralf Eppinger • 5 Quantitative mon - Mihai Bretotean, Rob Ward • Coastal aquifer aspects – Manuel Sapiano • 6 drinking water monitoring – Robert Chriastel

  2. Case studies Structure of case studies (acc. to workshop report) • Monitoring networks (general, introduction) • Monitoring of GW chemical status • Number of monitoring sites, Parameters, Frequency • Monitoring of GW quantitative status • Number of monitoring sites, Parameters, Frequency • Adaptation to monitoring requirements by WFD Or Focus of case studies on single chapters of outline

  3. Time table • CIRCA repository http://forum.europa.eu.int/Members/irc/env/wfd/library?l=/working_groups/new_groundwater/drafting_monitoring&vm=detailed&sb=Title • 1st-xth draft • Contributions – upload to CIRCA • 13 July 2005 • Final draft • Internal distribution: -14 days • Internal discussion (11.10.2005) • October plenary (12.10.2005) • Deadline for comments • ?? • Completed • End 2005

More Related