WTF/CEOP status May 7-10, 2002 Osamu Ochiai/NASDA Toshio Koike/Univ. of Tokyo

WTF/CEOP status May 7-10, 2002 Osamu Ochiai/NASDA Toshio Koike/Univ. of Tokyo. Contents. 1. Status Overview 2. Next Step. WGISS area. Space Agencies. NWP Centers. 1. Status Overview (CEOP body). Dr.D.Carson. Prof.T.Koike. CEOS. GCOS. IGFA. GTOS. Dr.S.Sorooshian. ICSU. GOOS.

wesley
Download Presentation

WTF/CEOP status May 7-10, 2002 Osamu Ochiai/NASDA Toshio Koike/Univ. of Tokyo

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WTF/CEOP status May 7-10, 2002 Osamu Ochiai/NASDA Toshio Koike/Univ. of Tokyo

  2. Contents 1. Status Overview 2. Next Step

  3. WGISS area Space Agencies NWP Centers 1. Status Overview (CEOP body) Dr.D.Carson Prof.T.Koike CEOS GCOS IGFA GTOS Dr.S.Sorooshian ICSU GOOS CliC GEWEX CLIVAR IGOS-Partners WCRP IOC Dr.B. Goodison Dr.R. Mechoso IGBP FAO WGNE UNEP WMO UNESCO Reference Site Data Set IGOS Themes Ocean Regional & Global Products Monitoring Demonstration Prediction Demonstration Carbon Cycle Atmospheric Chemistry CEOP SCIENCE OBJECTIVES Water & Energy Simulation & Prediction Monsoon System Study First Element Water Cycle

  4. 1. Status Overview (History) • “Proposed WTF/CEOP” presented at WGISS held at NASDA/HQ in Tokyo Feb. 12, 2002. • “CEOP Implementation Plan kick-off meeting” held at NASDA/EORC (6-8 March 2002) • Main topic is CEOP overall coordination/organization • Presented “Proposed WTF/CEOP” by NASDA • All info. can access through http://monsoon.t.u-tokyo.ac.jp/ceop/ • NASDA internal discussion in April 5, 2002 • “WTF/CEOP project plan” drafting discussion with Prof. Koike in April 26, 2002

  5. “WTF/CEOP project plan (draft)” presentation at CEOS/WGISS SG in ESA/ESRIN (May 7-10, 2002). “WTF/CEOP project plan” first version finalize in June 2002. Start prototype implementation (NASDA and UT) Demonstration at Plenary in Nov. 2002?? 2. Next Step (Plan)

  6. Co-relation with WTF-Cal/Val (and OTF?) Will be able to use same Infrastructure data sub-setting and distribution 4D data visualization 4D data interoperability For “WTF/CEOP project plan” finalization in June 2002, need to done following. For WTF/CEOP phase 1b (described in Project Plan), need POCs of WGISS from NASA(Terra, Aqua, etc), ESA(Envisat) for data sub-setting and distribution, 4D data visualization and interoperability Prototyping and Evaluation WTF/CEOP Phase 1a (described in Project Plan) proceeding by NASDA and CEOP (University of Tokyo)  Need much more discussion! Plenary Demonstration in Nov. 2002? TBD 2. Next Step (Coordination)