Agenda. STATE HIGH RENEWAL PROJECT “ KICK-OFF ” MEETING July 14, 2014. Opening Remarks Overview/Purpose Design Team Introductions Schematic Design Concepts Site Plan Building General Timeline Your Thoughts/Questions. Crabtree, Rohrbaugh & Associates, Architects.

weston
Download Presentation

Agenda

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Agenda STATE HIGH RENEWAL PROJECT “KICK-OFF” MEETING July 14, 2014 Opening Remarks Overview/Purpose Design Team Introductions Schematic Design Concepts Site Plan Building General Timeline Your Thoughts/Questions Crabtree, Rohrbaugh & Associates, Architects

  2. State High Renewal – Schematic Design Concepts • Site Improvement Goals • Access Management and Circulation • Vehicular and Pedestrian • Sufficient Parking at Appropriate Locations • Short-Term/Visitor • Event • Improved Storm Water Management • Minimize Impervious Footprint • Enhanced ADA Accessibility • Maintain Physical Education and Athletic Facilities

  3. State High Renewal – Schematic Design Concepts Concept for Future Community Field Improvements (Not Part of the Renewal) New Athletic Field (Grass, Included in Renewal) Overall Campus

  4. State High Renewal – Schematic Design Concepts Drop-off and ADA parking Primary SWM Area (North) Drop-off Loop & Visitor Parking 4-Way, Signalized Intersection Primary SWM Area (South) Main Parking South (Track) 4-Way, Signalized Intersection Main Parking North (Band Practice) Bus Staging for Dismissal and Event Parking Separate Bus Access

  5. State High Renewal – Schematic Design Concepts Architectural Massing Study Views

  6. State High Renewal – Schematic Design Concepts Massing Study - Aerial View Looking North

  7. State High Renewal – Schematic Design Concepts Massing Study - Aerial View Looking South

  8. State High Renewal – Schematic Design Concepts Massing Study – Looking West (above O’Bryan Ln.)

  9. State High Renewal – Schematic Design Concepts Massing Study – Looking South

  10. State High Renewal – Schematic Design Concepts Massing Study – Looking Southeast

  11. State High Renewal – Schematic Design Concepts Massing Study – Looking Southeast (above Welch)

  12. State High Renewal – Schematic Design Concepts Massing Study - Main Entry View

  13. State High Renewal – General Timeline • Overall Goal – Construction Start Summer 2015 • Approximate 30 month duration – in Phases • Municipal and State Approvals • Concurrent with Construction Documents and District Process • Municipal • Land Development Plans (Preliminary & Final) • Conditional Use for Parking Reduction (with Prelim. LD) • Zoning (Building Height and other Variances) • Traffic Study • State • NPDES (Storm Water) • PennDOT for Traffic Signal Permits

  14. State High Renewal – General Timeline

  15. Your Thoughts? STATE HIGH RENEWAL PROJECT “KICK-OFF” MEETING July 14, 2014 Crabtree, Rohrbaugh & Associates, Architects