Agenda. STATE HIGH RENEWAL PROJECT “ KICK-OFF ” MEETING July 14, 2014. Opening Remarks Overview/Purpose Design Team Introductions Schematic Design Concepts Site Plan Building General Timeline Your Thoughts/Questions. Crabtree, Rohrbaugh & Associates, Architects.
E N D
Agenda STATE HIGH RENEWAL PROJECT “KICK-OFF” MEETING July 14, 2014 Opening Remarks Overview/Purpose Design Team Introductions Schematic Design Concepts Site Plan Building General Timeline Your Thoughts/Questions Crabtree, Rohrbaugh & Associates, Architects
State High Renewal – Schematic Design Concepts • Site Improvement Goals • Access Management and Circulation • Vehicular and Pedestrian • Sufficient Parking at Appropriate Locations • Short-Term/Visitor • Event • Improved Storm Water Management • Minimize Impervious Footprint • Enhanced ADA Accessibility • Maintain Physical Education and Athletic Facilities
State High Renewal – Schematic Design Concepts Concept for Future Community Field Improvements (Not Part of the Renewal) New Athletic Field (Grass, Included in Renewal) Overall Campus
State High Renewal – Schematic Design Concepts Drop-off and ADA parking Primary SWM Area (North) Drop-off Loop & Visitor Parking 4-Way, Signalized Intersection Primary SWM Area (South) Main Parking South (Track) 4-Way, Signalized Intersection Main Parking North (Band Practice) Bus Staging for Dismissal and Event Parking Separate Bus Access
State High Renewal – Schematic Design Concepts Architectural Massing Study Views
State High Renewal – Schematic Design Concepts Massing Study - Aerial View Looking North
State High Renewal – Schematic Design Concepts Massing Study - Aerial View Looking South
State High Renewal – Schematic Design Concepts Massing Study – Looking West (above O’Bryan Ln.)
State High Renewal – Schematic Design Concepts Massing Study – Looking South
State High Renewal – Schematic Design Concepts Massing Study – Looking Southeast
State High Renewal – Schematic Design Concepts Massing Study – Looking Southeast (above Welch)
State High Renewal – Schematic Design Concepts Massing Study - Main Entry View
State High Renewal – General Timeline • Overall Goal – Construction Start Summer 2015 • Approximate 30 month duration – in Phases • Municipal and State Approvals • Concurrent with Construction Documents and District Process • Municipal • Land Development Plans (Preliminary & Final) • Conditional Use for Parking Reduction (with Prelim. LD) • Zoning (Building Height and other Variances) • Traffic Study • State • NPDES (Storm Water) • PennDOT for Traffic Signal Permits
Your Thoughts? STATE HIGH RENEWAL PROJECT “KICK-OFF” MEETING July 14, 2014 Crabtree, Rohrbaugh & Associates, Architects