An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. A Handful of Topics

  2. P200 Constituencies • We re-negotiated our partnership agreements in CY2009 • Long-standing partners JPL and Cornell are continuing as partners (for five and three years respectively) • New partner NOAO joins at 1/16 share with particular interest in (single-object) spectroscopy. Time for NOAO participation coming from decreasing Cornell commitment • Oxford partnership ongoing…

  3. P200 Instrument Usage/Trends • P200 Instrument Usage for 2010A and 2009B • Majority (~ 55%) for spectroscopy • AO usage increase: expectation of bench removal in 2010A • P1640 99-night survey in 2011 – 2013 inclusive • Structural decrease in OSWIFT with LGS decommissioning

  4. Instrument Usage/Trends (Cont) • Constituency Trends: • AO Usage PRESENTLY tilted toward JPL constituency; this changes structurally with the 99-night P1640 program • CIT (80%), Cornell (100%), & NOAO (100%) constituencies tend toward spectroscopic use • Concern: no non-Oxford participation in OSWIFT science (1 CIT night in 09A)

  5. TSpec Update TriSpec & TEDI Installation at P200 cass Jan 2008 • TSpec is an important near-IR spectroscopic capability at P200; prominent nationally (i.e. NOAO listed as instrument to emulate at Kitt Peak – NOAO Town Hall DC) • TSpec has had its share of electronics problems – which appear to be behind us – thanks to GustavoR’s extensive support in 2009 • A significant number of user reports of TSpec control software crashed (guider GUI) • JHickey & MBonati have made simplifications to guider GUI; in recent TSpec (e.g. late Dec) runs software has been considerably more reliable

  6. COO Operations SW Engineer • However, we anticipate there are still TSpec issues to iron-out, so… • Creating campus position to focus on Palomar operations instrument control software support (co-located with OIR) • Initial concentration on TSpec and DBSP control software • Job ad submitted to PMA this week; expect start date in April.

  7. 2010B Solicitation Dates • 15 Feb – Call for engineering proposals • 26 Feb – Engineering proposals due • 8 March 2010 – Science solicitation released • 2 April – Science proposals due • 19 April – TAC meeting • 3 May – CIT inputs due to WMKO

  8. Mirror Support Assembly Russell Porter illustration Gimbal Assembly Compound Lever Assembly Russell Porter Illustration 36 Mirror Supports 39 Bearings / Support Assembly ~ 1400 Bearings in total J.Zolkower P200 Mirror Support Refurbishment Plan 8

  9. Mirror Support Background & Recent History • In mid-2007 severe image distortions were experienced for an extended period of time. • Significant improvement was observed after vigorous exercising of the mirror supports in lateral mode. AO deformable mirror phase map Aug. 2007. Image obtained by Pharo in while the A.O. system DM was in a flat state, Aug. 2007. J.Zolkower P200 Mirror Support Refurbishment Plan 9

  10. Recent image quality issues More recently, occasional bad images are reported by telescope operators that are resolved by moving the telescope to a different place in the sky and then returning to original target. Image from LFC focus loop Dec 2, 2008 J.Zolkower P200 Mirror Support Refurbishment Plan 10

  11. Service Plan Time Allocation • 1994 Process Flow (25 assemblies serviced) • Total Time: 18 days; 14 working; 4 non-working • Service rate: 1.78 assemblies / working day • No Set-up or test noted • 2010 Option 1 Process Flow (36 assemblies serviced) • Total Time: 41 days; 31 working; 10 non-working • Service rate: 1.33 assemblies / working day (set-up & test not incl) • 4 days for set-up & test • 2010 Option 2 Process Flow (36 assemblies serviced) • Total Time: 33 days; 25 working; 8 non-working • Service rate: 1.71 assemblies / working day (set-up & test not incl) • 2010A service program: Reserved 5 weeks • Jan 24 - Feb 28 • - two weeks of shared risk observing time is scheduled at end of five-week period. • -Shared-risk observers identified J.Zolkower P200 Mirror Support Refurbishment Plan 11